File:TVD1-Brochure elements 43.png

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

TVD1-Brochure_elements_43.png (356 × 245 pixels, file size: 146 KB, MIME type: image/png)

Captions

Captions

Tvd1 brochure elements

Summary

[edit]
Description
English: First Crew Module for Gaganyaan test flight takes shapeHome /Gaganyaan TV-D1

October 06, 2023

Crew Module (CM) is where the astronauts are containedin a pressurized earthlike atmospheric condition during the Gaganyaan mission. The CM for the Gaganyaan mission is in different stages of development. For the Test Vehicle Abort mission-1 (TV-D1), the CM is an unpressurised version that has completed its integration and testing and is ready to be shipped to the launch complex. This unpressurised CM version has to have an overall size and mass of actual Gaganyaan CM. It houses all the systems for the deceleration and recovery. With its complete set of parachutes, recovery aids actuation systems and pyros. The avionics systems in CM are in a dual redundant mode configuration for navigation, sequencing, telemetry, instrumentation and power. The CM in this mission is extensively instrumented to capture the flight data for evaluation of the performance of various systems. The Crew Module will be recovered after touchdown in the Bay of Bengal, using a dedicated vessel and diving team from the Indian Navy.

The first development flight Test Vehicle (TV-D1) is in the final stages of preparation. The Test Vehicle is a single-stage liquid rocket developed for this abort mission. The payloads consist of the Crew Module (CM) and Crew Escape Systems (CES) with their fast-acting solid motors, along with CM fairing (CMF) and Interface Adapters. This flight will simulate the abort condition during the ascent trajectory corresponding to a Mach number of 1.2 encountered in the Gaganyaan mission. CES with CMwill be separated from the Test Vehicle at an altitude of about 17 km. Subsequently, the abort sequence will be executed autonomously commencing with the separation of CES and deployment of the series of parachutes, finally culminating in the safe touchdown of CM in the sea, about 10 km from the coast of Sriharikota.

The Crew Module after integration underwent various electrical testing, at ISRO’s facility in Bengaluru, including an acoustic test and was dispatched to SDSC-SHAR on 13th August. At SDSC, it will undergo vibration tests and pre-integration with the Crew Escape System, before final integration to the Test Vehicle at the Launch Pad. This Test Vehicle mission with this CM is a significant milestone for the overall Gaganyaan programme as a near-complete system is integrated for a flight test. The success of this test flight will set the stage for the remaining qualification tests and unmanned missions, leading to the first Gaganyaan mission with Indian Astronauts.
Date
Source https://www.isro.gov.in/media_isro/pdf/TVD1/TVD1-Brochure.pdf
Author Indian space research organization

Licensing

[edit]
This file is a copyrighted work of the Government of India, licensed under the Government Open Data License - India (GODL).
Authorization Method & Scope
Following the mandate of the National Data Sharing and Accessibility Policy (NDSAP) of the Government of India that applies to all shareable non-sensitive data available either in digital or analog forms but generated using public funds by various agencies of the Government of India, all users are provided a worldwide, royalty-free, non-exclusive license to use, adapt, publish (either in original, or in adapted and/or derivative forms), translate, display, add value, and create derivative works (including products and services), for all lawful commercial and non-commercial purposes, and for the duration of existence of such rights over the data or information.
Information on Related Items:
The user must acknowledge the provider, source, and license of data by explicitly publishing the attribution statement, including the DOI (Digital Object Identifier), or the URL (Uniform Resource Locator), or the URI (Uniform Resource Identifier) of the data concerned.
The user must not indicate or suggest in any manner that the data provider(s) endorses their use and/or the user.
The data provider(s) are not liable for any errors or omissions, and will not under any circumstances be liable for any loss, injury or damage caused by its use.
The data provider(s) do not guarantee the continued supply of updated or up-to-date versions of the data, and will not be held liable in case the continued supply of updated data is not provided.
Exemptions: The license does not cover the following kinds of data: a. personal information; b. data that is non-shareable and/or sensitive; c. names, crests, logos and other official symbols of the data provider(s); d. data subject to other intellectual property rights, including patents, trade-marks and official marks; e. military insignia; f. identity documents; and g. any data that should not have been publicly disclosed for the grounds provided under section 8 of the Right to Information Act, 2005.

Attribution: Indian Space Research Organisation (GODL-India)

বাংলা  Deutsch  English  español  français  हिन्दी  日本語  മലയാളം  मराठी  русский  中文  中文(简体)  中文(繁體)  中文(臺灣)  +/−

This image, which was originally posted in the source indicated above, has not yet been reviewed by an administrator or reviewer to confirm that the above license is valid. See Category:Unreviewed photos of GODL-India for further instructions.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current14:05, 17 October 2023Thumbnail for version as of 14:05, 17 October 2023356 × 245 (146 KB)Chinakpradhan (talk | contribs)Uploaded a work by Indian space research organization from https://www.isro.gov.in/media_isro/pdf/TVD1/TVD1-Brochure.pdf with UploadWizard

There are no pages that use this file.

Metadata