Content deleted Content added
GreenC bot (talk | contribs) Removed 1 archive link. Wayback Medic 2.5 |
No edit summary |
||
Line 97:
{{Main|Line 3 (Foshan Metro)}}
Line 3 currently runs {{convert|40.7|km|mi|abbr=on}} km from [[Shundexueyuan railway station|Shunde College Railway Station]] in [[Shunde District]] north to [[Zhen'an station (Foshan Metro)|Zhen'an]] in [[Chancheng District]]. Most of its 22 stations are underground, with 2 stations elevated. The initial section of Line 3's first phase opened on 28 December 2022, with the rest of the first phase extending the line to [[Foshan University Xianxi Campus station|Foshan University Xianxi Campus]] for a total length of {{convert|69.5|km|mi|abbr=on}} expected to open
{{clear}}
Line 121:
! Status
|-
| style="text-align: center" |
| style="background-color: #{{rcr|Foshan Metro|4}}; width: 0.5em" |
| style="text-align: center" | '''[[Line 4 (Foshan Metro)|Line 4]]'''
|