Athens Metro: Difference between revisions
Red Arrow27 (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit |
Reverted 1 edit by 193.92.14.192 (talk): The opening date did not include Line 1. |
||
(37 intermediate revisions by 23 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Rapid transit railway in Athens, Greece}} |
{{Short description|Rapid transit railway in Athens, Greece}} |
||
{{Use dmy dates|date=September |
{{Use dmy dates|date=September 2024}} |
||
{{More citations needed|date=May 2022}} |
{{More citations needed|date=May 2022}} |
||
{{Infobox public transit |
{{Infobox public transit |
||
Line 16: | Line 16: | ||
| lines = [[#Lines and stations|3]]{{efn|3 lines are in operation, with 1 line [[Line 4 (Athens Metro)|Line 4]] under construction.}} |
| lines = [[#Lines and stations|3]]{{efn|3 lines are in operation, with 1 line [[Line 4 (Athens Metro)|Line 4]] under construction.}} |
||
| stations = 66 served (62 owned){{efn|For a list of stations that the Athens Metro serves, see [[List of Athens Metro stations]].}} |
| stations = 66 served (62 owned){{efn|For a list of stations that the Athens Metro serves, see [[List of Athens Metro stations]].}} |
||
| daily_ridership = 1,353,000<ref name="Lines2&3">{{cite web|url=http://www.ametro.gr/page/default.asp?id=20&la=2 |title=Homepage - The Company - Attiko Metro S.A. |publisher=Attiko Metro S.A. |access-date=2014 |
| daily_ridership = 1,353,000<ref name="Lines2&3">{{cite web|url=http://www.ametro.gr/page/default.asp?id=20&la=2 |title=Homepage - The Company - Attiko Metro S.A. |publisher=Attiko Metro S.A. |access-date=2 June 2014 |url-status=dead |archive-url=https://web.archive.org/web/20101203061952/http://www.ametro.gr/page/default.asp?id=20&la=2 |archive-date=3 December 2010 }}</ref> |
||
| annual_ridership = 493,800,000 (2013) |
| annual_ridership = 493,800,000 (2013) |
||
| website = {{official website}} |
| website = {{official website}} |
||
Line 31: | Line 31: | ||
| average_speed = <!-- {{convert|0|mph|km/h|abbr=on}} --> |
| average_speed = <!-- {{convert|0|mph|km/h|abbr=on}} --> |
||
| top_speed = {{convert|80|km/h|mph|abbr=on}} |
| top_speed = {{convert|80|km/h|mph|abbr=on}} |
||
| map = [[File:Public transport map of Athens.png|225px]] |
| map = [[File:Public transport map of Athens.png|225px]]<br/>{{Athens Metro route diagram}} |
||
| map_name = System map |
| map_name = System map |
||
| map_state = |
| map_state = collapsed |
||
}} |
}} |
||
The '''Athens Metro''' ({{ |
The '''Athens Metro''' ({{langx|el|Μετρό Αθήνας|Metro Athinas|translit-std=iso}}) is a [[rapid transit]] system serving the [[Athens|Athens urban area]] in [[Greece]]. [[Line 1 (Athens Metro)|Line 1]] opened as a single-track conventional steam railway in 1869 and was electrified in 1904. Beginning in 1991, [[Elliniko Metro]] S.A. constructed and extended [[Line 2 (Athens Metro)|Lines 2]] and [[Line 3 (Athens Metro)|3]].<ref name="90s-construction"/> |
||
It has significantly changed Athens by providing a much-needed solution to the city's traffic and air pollution problem, as well as revitalising many of the areas it serves. |
It has significantly changed Athens by providing a much-needed solution to the city's traffic and air pollution problem, as well as revitalising many of the areas it serves. |
||
Extensions of existing lines are under development or tender, like Line 2 extension to Ilion where |
Extensions of existing lines are under development or tender, like the Line 2 extension to Ilion where tender started in 2023, as well as a new [[Athens Metro Line 4|Line 4]], whose central section began construction in October 2021.<ref>{{Cite web |date=3 May 2023 |title=Υποβολή φακέλων εκδήλωσης ενδιαφέροντος στο διαγωνισμό για την επέκταση του Μετρό προς Ίλιον |url=https://www.athenstransport.com/2023/05/ilion-metro-ekdilosi-endiaferontos/ |access-date=19 August 2023 |website=Athens Transport |language=el}}</ref> |
||
The Athens Metro is actively connected with the other means of public transport, such as buses, trolleys, the [[Athens Tram]] and the [[Athens Suburban Railway]]. The Athens Metro is hailed for its modernity (mainly the newer lines 2, 3) and many of its stations feature works of art, exhibitions and displays of the archaeological remains found during its construction. Photography and video-taking is permitted across the whole network<ref>{{Cite web|url=http://www.synigoros.gr/resources/docs/199930.pdf |title=synigoros.gr |url-status=dead |archive-url=https://web.archive.org/web/20160314231156/http://www.synigoros.gr/resources/docs/199930.pdf |archive-date=14 March 2016 }}</ref> and [[street photography|street photographers]] often work in Athens Metro. This |
The Athens Metro is actively connected with the other means of public transport, such as buses, trolleys, the [[Athens Tram]] and the [[Athens Suburban Railway]]. The Athens Metro is hailed for its modernity (mainly the newer lines 2, 3), and many of its stations feature works of art, exhibitions and displays of the archaeological remains found during its construction. Photography and video-taking is permitted across the whole network<ref>{{Cite web|url=http://www.synigoros.gr/resources/docs/199930.pdf |title=synigoros.gr |url-status=dead |archive-url=https://web.archive.org/web/20160314231156/http://www.synigoros.gr/resources/docs/199930.pdf |archive-date=14 March 2016 }}</ref> and [[street photography|street photographers]] often work in Athens Metro. This will be the only metro system in [[Greece]], until the [[Thessaloniki Metro]] begins operation in 2024. |
||
==History== |
==History== |
||
Line 45: | Line 45: | ||
{{Expand language|date=October 2022|langcode=el|section=1|topic=transp}} |
{{Expand language|date=October 2022|langcode=el|section=1|topic=transp}} |
||
===Piraeus–Kifissia Railway=== |
===Piraeus–Kifissia Railway (Line 1)=== |
||
Until 28 January 2000, Line 1 was the only rapid-transit line in Athens. The Athens and Piraeus Railway Company (SAP) opened a [[Steam railway|steam]] [[Single-track railway|single-track]] mixed cargo and passenger railway line on 27 February 1869 and was run between {{stl|Athens Metro|Piraeus}} and {{stl|Athens Metro|Thiseio}}. It was electrified in 1904. On |
Until 28 January 2000, Line 1 was the only rapid-transit line in Athens. The Athens and Piraeus Railway Company (SAP) opened a [[Steam railway|steam]] [[Single-track railway|single-track]] mixed cargo and passenger railway line on 27 February 1869 and was run between {{stl|Athens Metro|Piraeus}} and {{stl|Athens Metro|Thiseio}}. It was electrified in 1904. On 4 February 1885 [[Lavrion Square-Strofyli railway|Lavrion Square-Strofyli]] [[Steam railway|steam]] [[Narrow-gauge railway|narrow gauge]] [[Single-track railway|single-track]] mixed cargo and passenger railway line opened and was run at the time from Attiki Square to Kifissia through Iraklio. These originally mixed cargo and passenger railway lines gradually merged and converted to a rapid-transit system. The section between Kifissia and Strofyli was abandoned. |
||
From 1869 to 1926 the line was operated by SAP. From 1926 to 1976 the line was operated by Hellenic Electric Railways (EIS). In 1976 the EIS was nationalized and renamed Athens-Piraeus Electric Railway Company (ISAP), which continued to operate what became line 1 of the Athens Metro until 16 June 2011.<ref name="about-stasy"/> |
From 1869 to 1926 the line was operated by SAP. From 1926 to 1976 the line was operated by [[Hellenic Electric Railways]] (EIS). In 1976 the EIS was nationalized and renamed Athens-Piraeus Electric Railway Company (ISAP), which continued to operate what became line 1 of the Athens Metro until 16 June 2011.<ref name="about-stasy"/> |
||
==={{anchor|Projects of the 1990s}}1990s projects=== |
==={{anchor|Projects of the 1990s}}1990s projects=== |
||
Since the current Line 1 opened, the government has proposed many expansions to the subway network, including a 1963 plan for a fourteen-line subway network.<ref>{{cite web|url=http://www.tovima.gr/society/article/?aid=527217|script-title=el:Οραμα για 14 γραμμές Μετρό στην Αττική από το 2000|last=Hekimoglou|first=Achilleas|date=24 August 2013|publisher=Το Βήμα ([[To Vima]])|language=el|access-date= |
Since the current Line 1 opened, the government has proposed many expansions to the subway network, including a 1963 plan for a fourteen-line subway network.<ref>{{cite web|url=http://www.tovima.gr/society/article/?aid=527217|script-title=el:Οραμα για 14 γραμμές Μετρό στην Αττική από το 2000|last=Hekimoglou|first=Achilleas|date=24 August 2013|publisher=Το Βήμα ([[To Vima]])|language=el|access-date=23 February 2024}}</ref> Construction of Lines 2 and 3 began in November 1992 to decrease traffic congestion and improve Athens' air quality by reducing its smog level.<ref name="90s-construction">{{cite web|url=http://www.ametro.gr/page/default.asp?la=2&id=376|title=AttikoMetro Inside – Base Project|date=9 September 2012|publisher=Attiko Metro S.A.|access-date=3 October 2012}}</ref> Both lines were constructed underground. Lines 2 and 3, built by Attiko Metro S.A. and operated until 2011 by Attiko Metro Operations Company, are known respectively as the red and blue lines and were inaugurated in January 2000. Line 3 was extended to the [[Eleftherios Venizelos International Airport]] in summer 2004, and Line 2 was extended to [[Anthoupoli metro station|Anthoupoli]] and Elliniko in 2013. |
||
===Consolidation=== |
===Consolidation=== |
||
Until 17 June 2011,<ref name="about-stasy">{{cite web|url=http://www.stasy.gr/index.php?id=13&L=1|title=Urban Rail Transport SA (STASY SA): Urban Rail Transport S.A|publisher=Urban Rail Transport S.A.|access-date=2 October 2012}}</ref> the operational management of the Athens Metro network was similar to that of the [[London Underground]] network before the creation of the [[London Passenger Transport Board]] and the absorption of the [[Metropolitan Railway]] on 1 July 1933. The Greek government attempted to absorb [[ISAP]] into Attiko Metro operation company under Law 2669/1998 so the latter would be responsible for the whole network,<ref>{{cite journal|date=18 December 1998|title=Law 2669/1998|journal=Εφημερίδας της Κυβερνήσεως|publisher=[[Government of Greece]]|location=Athens|volume=A|issue=283|url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wEeWRs27M2niXdtvSoClrL85YC7ghNTGul5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx3UnKl3nP8NxdnJ5r9cmWyJWelDvWS_18kAEhATUkJb0x1LIdQ163nV9K--td6SIuQhK1CW1g5a5c9KyvSvZ1EcbNA7-kImkovm1fsZ5eINZ|access-date=24 September 2013|language=el}}</ref> but this initiative failed.{{why|date=September 2013}} Athens Metro operations were consolidated when the Greek government enacted Law 3920/2011,<ref>Law 3920, ''Government Gazette issue A-33'', 3 March 2011.</ref> replacing [[Attiko Metro Operation Company|AMEL]], ISAP and Tram S.A. with [[STASY|Urban Rail Transport S.A.]] (STASY S.A.) ({{ |
Until 17 June 2011,<ref name="about-stasy">{{cite web|url=http://www.stasy.gr/index.php?id=13&L=1|title=Urban Rail Transport SA (STASY SA): Urban Rail Transport S.A|publisher=Urban Rail Transport S.A.|access-date=2 October 2012}}</ref> the operational management of the Athens Metro network was similar to that of the [[London Underground]] network before the creation of the [[London Passenger Transport Board]] and the absorption of the [[Metropolitan Railway]] on 1 July 1933. The Greek government attempted to absorb [[ISAP]] into Attiko Metro operation company under Law 2669/1998 so the latter would be responsible for the whole network,<ref>{{cite journal|date=18 December 1998|title=Law 2669/1998|journal=Εφημερίδας της Κυβερνήσεως|publisher=[[Government of Greece]]|location=Athens|volume=A|issue=283|url=http://www.et.gr/idocs-nph/search/pdfViewerForm.html?args=5C7QrtC22wEeWRs27M2niXdtvSoClrL85YC7ghNTGul5MXD0LzQTLWPU9yLzB8V68knBzLCmTXKaO6fpVZ6Lx3UnKl3nP8NxdnJ5r9cmWyJWelDvWS_18kAEhATUkJb0x1LIdQ163nV9K--td6SIuQhK1CW1g5a5c9KyvSvZ1EcbNA7-kImkovm1fsZ5eINZ|access-date=24 September 2013|language=el}}</ref> but this initiative failed.{{why|date=September 2013}} Athens Metro operations were consolidated when the Greek government enacted Law 3920/2011,<ref>Law 3920, ''Government Gazette issue A-33'', 3 March 2011.</ref> replacing [[Attiko Metro Operation Company|AMEL]], ISAP and Tram S.A. with [[STASY|Urban Rail Transport S.A.]] (STASY S.A.) ({{langx|el|ΣΤΑΣΥ Α.Ε.}}), a subsidiary of OASA S.A. (Athens Urban Transport Organisation S.A.).<ref>Ministerial Decision 28737/2637, ''Government Gazette issue B-1454, 17 June 2011''</ref> |
||
===Timeline=== |
===Timeline=== |
||
Line 162: | Line 162: | ||
| [[Nikaia metro station|Nikaia]]-[[Dimotiko Theatro metro station|Dimotiko Theatro]] |
| [[Nikaia metro station|Nikaia]]-[[Dimotiko Theatro metro station|Dimotiko Theatro]] |
||
| 10 October 2022 |
| 10 October 2022 |
||
|- |
|||
| {{ric|Athens Metro|M4}} |
|||
| Alsos Veikou-[[Goudi]] |
|||
| August 2021 |
|||
| ''2029-2030'' |
|||
|} |
|} |
||
Line 182: | Line 177: | ||
|+Outline of Athens Metro lines<ref name="metro-stats-2022"/> |
|+Outline of Athens Metro lines<ref name="metro-stats-2022"/> |
||
! Line <!-- The icons link to their own articles where applicable. No extra text is required. --> |
! Line <!-- The icons link to their own articles where applicable. No extra text is required. --> |
||
! class="unsortable"|Map<br/>colour{{efn|None of the organisations behind the construction or operation of the Athens Metro specify the exact line colour values for web or print, but they agree on a general colour scheme for identifying lines.<ref name="ametro-map-2022">{{cite web|title=Athens Metro Lines Development Plan|url=https://www.ametro.gr/wp-content/uploads/2022/10/Metro1234_Πετρούπολη-Αχαρνές-Γλυφάδα-Καλλιθέα-Βαρυμπόμπη_Sub-ΣΑ-A3-Eng-2022-09-i.pdf|website=Attiko Metro|access-date=4 October 2022|archive-url=https://web.archive.org/web/20221004155324/https://www.ametro.gr/wp-content/uploads/2022/10/Metro1234_Πετρούπολη-Αχαρνές-Γλυφάδα-Καλλιθέα-Βαρυμπόμπη_Sub-ΣΑ-A3-Eng-2022-09-i.pdf|archive-date=4 October 2022|location=Athens|date=September 2022}}</ref><ref name="current_map">{{cite web|url=http://www.stasy.gr/fileadmin/pages_material/metakinitheite/maps/Diktyo_Meson_Statheris_Trohias.jpg|title=Athens Public Transportation Map|publisher= |
! class="unsortable"|Map<br/>colour{{efn|None of the organisations behind the construction or operation of the Athens Metro specify the exact line colour values for web or print, but they agree on a general colour scheme for identifying lines.<ref name="ametro-map-2022">{{cite web|title=Athens Metro Lines Development Plan|url=https://www.ametro.gr/wp-content/uploads/2022/10/Metro1234_Πετρούπολη-Αχαρνές-Γλυφάδα-Καλλιθέα-Βαρυμπόμπη_Sub-ΣΑ-A3-Eng-2022-09-i.pdf|website=Attiko Metro|access-date=4 October 2022|archive-url=https://web.archive.org/web/20221004155324/https://www.ametro.gr/wp-content/uploads/2022/10/Metro1234_Πετρούπολη-Αχαρνές-Γλυφάδα-Καλλιθέα-Βαρυμπόμπη_Sub-ΣΑ-A3-Eng-2022-09-i.pdf|archive-date=4 October 2022|location=Athens|date=September 2022}}</ref><ref name="current_map">{{cite web|url=http://www.stasy.gr/fileadmin/pages_material/metakinitheite/maps/Diktyo_Meson_Statheris_Trohias.jpg|title=Athens Public Transportation Map|publisher=Transport for Athens|access-date=17 March 2020}}</ref><ref name="stasy-map-2022">{{cite web|title=Metro and Tram Map|url=https://stasy.gr/wp-content/uploads/2022/10/MAP_STASY_2022.pdf|website=STASY|access-date=2 November 2022|archive-url=https://web.archive.org/web/20221102193826/https://stasy.gr/wp-content/uploads/2022/10/MAP_STASY_2022.pdf|archive-date=2 November 2022|location=Athens|language=Greek|date=11 October 2022}}</ref>}} |
||
! Opened |
! Opened |
||
! Last<br/>extension |
! Last<br/>extension |
||
Line 237: | Line 232: | ||
|} |
|} |
||
Line 2 |
Line 2 is entirely underground. Line 1 is mostly overground, with an underground section spanning between the Monastiraki and Attiki stations, and an additional underground station (Kato Patisia) in central Athens. Line 3 is mostly underground; Trains that run an overground route are only those with the airport as final destination. The overground section of Line 3, east of the tunnel portal near {{stl|Athens Metro|Doukissis Plakentias}}, is open. In the tunnel sections up and down lines share a common tunnel, except for approaches to stations with an island platform (such as Egaleo). [[Rail yard|Train maintenance facilities]] are located at Attiki, Faliro, Irini, Piraeus, Kifissia and Thissio for Line 1, and Doukissis Plakentias, Eleonas and Sepolia for Lines 2 and 3. |
||
The Athens Metro's three lines carried approximately 1,353,000 passengers daily in 2010.<ref name="Lines2&3" /> |
The Athens Metro's three lines carried approximately 1,353,000 passengers daily in 2010.<ref name="Lines2&3" /> |
||
A network map of the Athens Metro system, that includes the three current lines, the under construction line 4, the tramway, the suburban railway and all the future under design extensions.<ref name="ametro-map-2022" /> |
A network map of the Athens Metro system, that includes the three current lines, the under construction line 4, the tramway, the suburban railway and all the future under design extensions.<ref name="ametro-map-2022" /> |
||
[[File:Athens Metro Map.png|center|thumb|570x570px|Athens Metro Map]] |
|||
⚫ | |||
⚫ | |||
{{Main|Athens Metro rolling stock}} |
{{Main|Athens Metro rolling stock}} |
||
The network uses [[standard gauge]] electric trains which in most places run on [[750 VDC|750 ]][[Volt|V]] [[Direct current|DC]] [[third rail]], but the section of Line 3 running to the airport requires trains which can use [[overhead line]]s of [[25 kV AC railway electrification|25 kV]] [[Alternating current|AC]], 50 Hz. |
The network uses [[standard gauge]] electric trains which in most places run on [[750 VDC|750 ]] [[Volt|V]] [[Direct current|DC]] [[third rail]], but the section of Line 3 running to the airport requires trains which can use [[overhead line]]s of [[25 kV AC railway electrification|25 kV]] [[Alternating current|AC]], 50 Hz. |
||
The Athens Metro classifies rolling stock by "batch" for Line 1 and "generation" for Lines 2 and 3 because ISAP and [[Attiko Metro Operation Company|AMEL]] used different classification systems for rolling stock before consolidation. Six types of rolling stock operate on the network, all equipped with third rail current collection systems; however, only seven second-generation trains have the necessary overhead line equipment to serve Line 3 from {{stl|Athens Metro|Doukissis Plakentias}} to {{stl|Athens Metro|Airport}}. |
The Athens Metro classifies rolling stock by "batch" for Line 1 and "generation" for Lines 2 and 3 because ISAP and [[Attiko Metro Operation Company|AMEL]] used different classification systems for rolling stock before consolidation. Six types of rolling stock operate on the network, all equipped with third rail current collection systems; however, only seven second-generation trains have the necessary overhead line equipment to serve Line 3 from {{stl|Athens Metro|Doukissis Plakentias}} to {{stl|Athens Metro|Airport}}. |
||
The eighth batch (introduced in 1983) is the oldest rolling stock in passenger service, while the third generation (introduced in 2013) is the latest rolling stock in passenger service. The eighth- and tenth-batch stock is externally similar, but the former has [[Split-flap display|split-flap headsigns]] in [[Johnston typeface]] and a cream-and-green interior colour scheme. An extensive refurbishment programme is in progress for the 8th batch (as of 2023), and to cover for trains undergoing refurbishment, up to five 1st generation Line 2/3 trains have been borrowed to operate on Line 1. |
The eighth batch (introduced in 1983) is the oldest rolling stock in passenger service, while the third generation (introduced in 2013) is the latest rolling stock in passenger service. The eighth- and tenth-batch stock is externally similar, but the former has [[Split-flap display|split-flap headsigns]] in [[Johnston typeface]] and a cream-and-green interior colour scheme. An extensive refurbishment programme is in progress for the 8th batch (as of 2023), and to cover for trains undergoing refurbishment, up to five 1st generation Line 2/3 trains have been borrowed to operate on Line 1. |
||
Line 1 halfsets have driving cabs at both ends, unlike the Line 2/3 halfsets which have a driving cab at the outer ends, but only basic driving apparatus for shunting purposes only at the inner ends; thus, they can only operate on their own inside depots. |
Line 1 halfsets have driving cabs at both ends, unlike the Line 2/3 halfsets which have a driving cab at the outer ends, but only basic driving apparatus for shunting purposes only at the inner ends; thus, they can only operate on their own inside depots.[[File:Athens metro Victoria station.jpg|thumb|The west entrance to Athens Metro line 1 Victoria station.]] |
||
{| class="wikitable sortable" style="margin: 0 auto; text-align:center;" |
|||
|+ style="margin:inherit; padding-bottom:0.25em"| |
|||
! Line |
|||
! Stock |
|||
! Image |
|||
! Introduced |
|||
|- |
|||
| {{ric|Athens Metro|M1}} |
|||
| 8th batch stock |
|||
| [[File:10th batch line 1 train, Athens, Greece.jpg|alt=Square grey-and-red train pulling into a station|150px]] |
|||
| 1983 |
|||
|- |
|||
| {{ric|Athens Metro|M1}} |
|||
| 10th batch stock |
|||
| [[File:ISAP Thision sidings.jpg|alt=Same type of train passing evergreen trees|150px]] |
|||
| 1993 |
|||
|- |
|||
| {{ric|Athens Metro|M1}} |
|||
| 11th batch stock |
|||
| [[File:20070523-NERATZIOTISA.jpg|150px]] |
|||
| 2000 |
|||
|- |
|||
| {{ric|Athens Metro|M1}} {{ric|Athens Metro|M2}} {{ric|Athens Metro|M3}} |
|||
| 1st generation stock |
|||
| [[File:AMEL 1st Generation Stock C21 at Syngrou-Fix Station.jpg|alt=Same type of train passing line of parked cars|150px]] |
|||
| 2000 |
|||
|- |
|||
| {{ric|Athens Metro|M2}} {{ric|Athens Metro|M3}} |
|||
| 2nd generation stock |
|||
| [[File:Keramikos metro st.2.JPG|alt=Subway train in station|150px]] |
|||
| 2003 & 2004 |
|||
|- |
|||
| {{ric|Athens Metro|M2}} {{ric|Athens Metro|M3}} |
|||
| 3rd generation stock |
|||
| [[File:20140622-Anthoupoli-62D304 (7872).jpg|150px]] |
|||
| 2014 |
|||
|}[[File:Athens metro Victoria station.jpg|thumb|The west entrance to Athens Metro line 1 Victoria station.]] |
|||
Line 1 |
=== Line 1 === |
||
{| class="wikitable sortable" style="width: 100%; margin-bottom: 34px;" |
{| class="wikitable sortable" style="width: 100%; margin-bottom: 34px;" |
||
! Name |
! Name |
||
Line 315: | Line 270: | ||
|- |
|- |
||
| 10th Batch |
| 10th Batch |
||
| MAN SE, [[AEG]], Siemens Mobility, [[Hellenic Shipyards Co.]] |
| MAN SE, [[AEG (German company)|AEG]], Siemens Mobility, [[Hellenic Shipyards Co.]] |
||
| [[File:10th_batch_line_1_train,_Athens,_Greece.jpg|250x250px]] <br />10th Batch trainset at Piraeus (2011) |
| [[File:10th_batch_line_1_train,_Athens,_Greece.jpg|250x250px]] <br />10th Batch trainset at Piraeus (2011) |
||
| [[File:Athens_Metro_Line_1.svg|25x25px]] |
| [[File:Athens_Metro_Line_1.svg|25x25px]] |
||
Line 324: | Line 279: | ||
| The 10th batch is the second oldest range of wagons that runs on the Athens Metro network. They are identical in appearance with the 8th batch and known by the same nickname. An upgrade of the train is anticipated. |
| The 10th batch is the second oldest range of wagons that runs on the Athens Metro network. They are identical in appearance with the 8th batch and known by the same nickname. An upgrade of the train is anticipated. |
||
|- |
|- |
||
| 11th |
| 11th Batch |
||
| [[Adtranz]], Siemens Mobility, Hellenic Shipyards Co., [[Bombardier Transportation]] |
| [[Adtranz]], Siemens Mobility, Hellenic Shipyards Co., [[Bombardier Transportation]] |
||
| [[File:20070523-NERATZIOTISA.jpg|250x250px]]<br />11th Batch trainset at Neratziotissa (2007) |
| [[File:20070523-NERATZIOTISA.jpg|250x250px]]<br />11th Batch trainset at Neratziotissa (2007) |
||
Line 344: | Line 299: | ||
| The 1st generation is the oldest batch of 2 and 3 line trainsets and the only one in the whole network with sliding doors and not locking doors. Some first generation trains are also used on line 1. |
| The 1st generation is the oldest batch of 2 and 3 line trainsets and the only one in the whole network with sliding doors and not locking doors. Some first generation trains are also used on line 1. |
||
|} |
|} |
||
Line 2 |
|||
=== Lines 2 & 3 === |
|||
{| class="wikitable sortable" style="width: 100%; margin-bottom: 10px;" |
{| class="wikitable sortable" style="width: 100%; margin-bottom: 10px;" |
||
! Name |
! Name |
||
Line 382: | Line 338: | ||
| The second generation operates under the standard line voltage of 750 V DC from third rail, but 7 trains from line 3 are able to operate under {{25 kV 50 Hz}} from [[overhead line|overhead catenary]] with a pantograph in order to serve the section from Doukissis Plakentias to the Airport. |
| The second generation operates under the standard line voltage of 750 V DC from third rail, but 7 trains from line 3 are able to operate under {{25 kV 50 Hz}} from [[overhead line|overhead catenary]] with a pantograph in order to serve the section from Doukissis Plakentias to the Airport. |
||
|- |
|- |
||
| 3rd |
| 3rd Generation |
||
| [[Hyundai Rotem]], Siemens Mobility |
| [[Hyundai Rotem]], Siemens Mobility |
||
| [[File:20140622-Anthoupoli-62D304_(7872).jpg|200x200px]] |
| [[File:20140622-Anthoupoli-62D304_(7872).jpg|200x200px]] |
||
Line 388: | Line 344: | ||
| 6 |
| 6 |
||
| 4 |
| 4 |
||
| 80<ref name=":4">{{Cite web|url=https://www.ametro.gr/?page_id=237|title=Τρίτη γενιά συρμών – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε.|language=el|access-date=27 December 2018}}</ref> |
| 80<ref name=":4">{{Cite web|url=https://www.ametro.gr/?page_id=237|title=Τρίτη γενιά συρμών – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε.|language=el|access-date=27 December 2018|archive-date=29 December 2018|archive-url=https://web.archive.org/web/20181229171549/https://www.ametro.gr/?page_id=237|url-status=dead}}</ref> |
||
| 1.032 |
| 1.032 |
||
| 28 |
| 28 |
||
Line 397: | Line 353: | ||
===Signalling=== |
===Signalling=== |
||
{{Main|Greek railway signalling#Athens Metro signalling|l1=Greek railway signalling → Athens Metro signalling}} |
{{Main|Greek railway signalling#Athens Metro signalling|l1=Greek railway signalling → Athens Metro signalling}} |
||
Line 1 uses two-aspect red/green home signals, yellow/green distant signals and a passenger information system (PIS). The current system replaced 1950s-era semaphore signals. The automatic train protection (ATP) system of Line 1 was fully installed in 2023 which replaced the previous Indusi system.<ref>{{Cite web |date=2023 |
Line 1 uses two-aspect red/green home signals, yellow/green distant signals and a passenger information system (PIS). The current system replaced 1950s-era semaphore signals. The automatic train protection (ATP) system of Line 1 was fully installed in 2023 which replaced the previous Indusi system.<ref>{{Cite web |date=20 March 2023 |title=Ενεργοποιήθηκε το Σύστημα Ασφάλειας Κυκλοφορίας Συρμών στη γραμμή του ΗΣΑΠ |url=https://www.athenstransport.com/2023/03/atp-grammi-isap/ |access-date=18 August 2023 |website=Athens Transport |language=el}}</ref> |
||
Lines 2 and 3 use the Alstom automatic train supervision system (ATS) and a passenger information system (PIS). Two-aspect red/white colour signals are used at points and junctions only. |
Lines 2 and 3 use the Alstom automatic train supervision system (ATS) and a passenger information system (PIS). Two-aspect red/white colour signals are used at points and junctions only. |
||
==Fares== |
==Fares== |
||
⚫ | Fares are prepaid, either as short term tickets valid for 90 minutes, 24 hours, three days, five days, or as long term tickets. As of September 2020, there are two types of fare products, the ATH.ENA Ticket and ATH.ENA Card, both of which are validated using a contactless system (by scanning the ticket or card at the electronic validating machines). The tickets are valid on all modes of public transport in Athens except on trains and buses to the airport.<ref name="Ticket Types&Prices">{{cite web |url=http://oasa.gr/pdf/tickets.pdf |title=Tickets |website=OASA S.A |access-date=22 September 2015}}</ref> Passengers cannot buy a fare on board the bus. To travel to or from the airport, passengers may buy a one-way ticket for €9 or a 3-day ticket for €20 which also includes unlimited local trips and a return trip to the airport. Arrival at the airport without having paid the appropriate fare will incur a €72 fine, reduced to €36 if paid within 10 days. Term tickets are available in 30, 90, 180, and 365 day periods and are available only with a personalized ATH.ENA Card. Reduced fares are available for university students, seniors, disabled and persons under 18. During a fare control the passengers that are entitled to a reduced fare have to show ID card, student card or passport.<ref name="Cards Types&Prices">{{cite web |url=http://stasy.gr/index.php?id=464&L=0 |title=Travel Cards |language=Greek |website=STASY S.A./OASA S.A. |access-date=23 September 2015}}</ref> Children under the age of 6 are entitled to travel for free with all means of transportation. On buses and [[Athens Tram|trams]] the ticket or card must be validated only when entering the vehicle/car by scanning the ticket at the electronic validating machines. At metro or [[Athens Suburban Railway|Suburban Railway]] stations, the ticket or card must be validated at the electronic gates when entering and exiting the station.[[File:Ticket 1.20€.png|thumb|277x277px|Old €1.20 (standard fee) paper Ticket, in use from September 2014 until November 2017.|left]] |
||
[[File:Ticket 1.20€.png|thumb|266x266px|Old €1.20 (standard fee) paper Ticket, in use from September 2014 until November 2017.]] |
|||
[[File:Athens Ticket.jpg|none|thumb|281x281px|New ticket €1.20 paper ticket in use from November 2017 - Now]] |
|||
⚫ | Fares are prepaid, either as short term tickets valid for 90 minutes, 24 hours, |
||
== Archaeological excavations and exhibits == |
== Archaeological excavations and exhibits == |
||
{{see also|Syntagma Metro Station Archaeological Collection}} |
{{see also|Syntagma Metro Station Archaeological Collection}} |
||
During construction of the metro tunnels, artifacts of archaeological interest were discovered and [[rescue archaeology]] was employed. Teams of archaeologists worked ahead of, then with, engineers for six years, protecting and recording archaeological finds (streets, houses, cemeteries, sanctuaries, public workshops, foundry pits, kilns, aqueducts, wells, cisterns, drains and sewage tunnels). This afforded new insight into the city's ancient topography, through unprecedented infrastructure development combined with the study and preservation of archaeological data. Exhibitions of ancient artifacts or replicas are found at a number of metro stations, including [[Monastiraki metro station|Monastiraki]] and [[Syntagma metro station|Syntagma]].[[File:DSC 3160 syntagma metro station july 2018.jpg|alt=Open indoor area with ticket windows, fare-collection machines and an escalator|thumb|300x300px|Concourse level of Syntagma Metro station (2018).]] |
During construction of the metro tunnels, artifacts of archaeological interest were discovered and [[rescue archaeology]] was employed. Teams of archaeologists worked ahead of, then with, engineers for six years, protecting and recording archaeological finds (streets, houses, cemeteries, sanctuaries, public workshops, foundry pits, kilns, aqueducts, wells, cisterns, drains and sewage tunnels). This afforded new insight into the city's ancient topography, through unprecedented infrastructure development combined with the study and preservation of archaeological data. Exhibitions of ancient artifacts or replicas are found at a number of metro stations, including [[Monastiraki metro station|Monastiraki]], [[Akropoli metro station|Akropoli]] and [[Syntagma metro station|Syntagma]].[[File:DSC 3160 syntagma metro station july 2018.jpg|alt=Open indoor area with ticket windows, fare-collection machines and an escalator|thumb|300x300px|Concourse level of Syntagma Metro station (2018).]] |
||
=={{anchor|Future}}Future== |
=={{anchor|Future}}Future== |
||
Line 466: | Line 422: | ||
==={{anchor|Planned Line 4}}Line 4=== |
==={{anchor|Planned Line 4}}Line 4=== |
||
{{Main|Line 4 (Athens Metro)}} |
{{Main|Line 4 (Athens Metro)}} |
||
A fourth line is planned for the Athens Metro and it has been incorporated in the roadmap of [[ |
A fourth line is planned for the Athens Metro and it has been incorporated in the roadmap for the development and expansion of [[public transport in Athens]] since 2005. The new line in its totality will extend over a length of {{convert|38.2|km|mi|abbr=on}}, adding thirty five (35) new stations to the Athens Metro system. The cost of the entire project is estimated at 3.3 billion [[Euro|EUR]].<ref>{{cite web|url=https://www.ametro.gr/?page_id=8633&lang=en |title=Attiko Metro Γραμμή 4 (Line 4) |publisher=Attiko Metro S.A. |access-date=17 March 2020}}</ref> The recommendation is for lighter rolling stock than the type used in existing lines of Athens Metro which would operate [[Automatic train operation|automatically without a driver]]. In November 2020, [[Alstom]] was chosen to supply the line with 20 4-car automated [[Alstom Metropolis|Metropolis]] trains, operated under Urbalis 400 signalling system.<ref>{{cite web|url=https://www.alstom.com/press-releases-news/2020/11/alstom-consortium-selected-first-section-athens-metro-line-4|title=Alstom consortium selected for first section of Athens Metro Line 4|publisher=Alstom |access-date=5 November 2020}}</ref> |
||
The first phase of Line 4 will be between ''Alsos Veikou'' and ''Goudi'' stations, predicting fifteen (15) new stations and a length of {{convert|12.8|km|mi|abbr=on}} of new track. An [[call for bids|invitation to tender]] for the construction of the first phase of Line 4 was issued in September 2018. The construction |
The first phase of Line 4 will be between ''Alsos Veikou'' and ''Goudi'' stations, predicting fifteen (15) new stations and a length of {{convert|12.8|km|mi|abbr=on}} of new track. An [[call for bids|invitation to tender]] for the construction of the first phase of Line 4 was issued in September 2018. The construction started in mid to late-2021 and is scheduled to be completed in 2029 or 2030. The estimated cost for constructing the first phase of the new line is 1.51 billion EUR. Currently, the project of the first phase is considered to follow a [[Public-private partnership|PPP]] scheme which might be extended for constructing the whole new line. An alternative solution is a mixed funding between the [[European Investment Bank|EIB]] and the Greek State. It is also a high-profile candidate project to be included in the [[European Commission Investment Plan for Europe|Juncker Plan]] of EU that will include also the second phase of Line 4 of Athens Metro. |
||
The European Investment Bank is allocating a €730 million loan over 30 years to finance the building of the first segment of the Line 4 metro, which will connect Alsos Veikou and Goudi. The initiative will also assist Athens by reducing the number of private automobiles on the road by 53 000, resulting in 318 tonnes fewer [[Greenhouse gas emissions|CO2]] released daily.<ref>{{Cite journal |last=Bank |first=European Investment |date= |
The [[European Investment Bank]] is allocating a €730 million loan over 30 years to finance the building of the first segment of the Line 4 metro, which will connect Alsos Veikou and Goudi. The initiative will also assist Athens by reducing the number of private automobiles on the road by 53 000, resulting in 318 tonnes fewer [[Greenhouse gas emissions|CO2]] released daily.<ref>{{Cite journal |last=Bank |first=European Investment |date=17 May 2023 |title=Cohesion and regional development Overview 2023 |url=https://www.eib.org/en/publications/20230145-cohesion-and-regional-development-overview-2023 |language=EN}}</ref><ref>{{Cite web |last=pamela |date=10 February 2022 |title=Financing agreement for Alsos Veikou – Goudi metro section |url=https://www.railwaypro.com/wp/eur-580-million-financing-for-athens-line-4/ |access-date=15 June 2023 |website=Railway PRO |language=en-US}}</ref><ref>{{Cite web |last=Rani |first=Archana |date=8 February 2022 |title=Attiko receives $663m EIB loan for new Athens Metro line |url=https://www.railway-technology.com/news/attiko-eib-metro-line/ |access-date=15 June 2023 |website=Railway Technology |language=en-US}}</ref><ref>{{Cite journal |last=Bank |first=European Investment |date=11 September 2023 |title=Sustainable transport overview 2023 |url=https://www.eib.org/en/publications/20230266-sustainable-transport-overview-2023 |language=EN}}</ref> |
||
===Long-term plan=== |
===Long-term plan=== |
||
Line 483: | Line 439: | ||
* [[Line 3 (Athens Metro)]] |
* [[Line 3 (Athens Metro)]] |
||
* [[Line 4 (Athens Metro)]] |
* [[Line 4 (Athens Metro)]] |
||
* [[ |
* [[Transport for Athens]] |
||
** [[STASY]] |
|||
* [[Thessaloniki Metro]] |
* [[Thessaloniki Metro]] |
||
Line 494: | Line 451: | ||
==External links== |
==External links== |
||
{{commons category|Athens Metro}} |
{{commons category|Athens Metro}} |
||
{{Rapid transit OSM map|display=title|text=Metro map}} |
{{Rapid transit OSM map|display=title|text=Metro map|stations=yes|marker-color=808080}} |
||
*[https://metromapworld.com/athens-metro-map/ Athens Metro Map on Google earth with geolocation] |
*[https://metromapworld.com/athens-metro-map/ Athens Metro Map on Google earth with geolocation] {{Webarchive|url=https://web.archive.org/web/20190524073520/https://metromapworld.com/athens-metro-map/ |date=24 May 2019 }} |
||
*[http://www.stasy.gr/index.php?L=1 Urban Rail Transport Company (STASY S.A.)] |
*[http://www.stasy.gr/index.php?L=1 Urban Rail Transport Company (STASY S.A.)] |
||
*[https://www.ametro.gr/ Attiko Metro Company (Construction and Infrastructure)] |
*[https://www.ametro.gr/ Attiko Metro Company (Construction and Infrastructure)] |
Latest revision as of 09:18, 7 November 2024
This article needs additional citations for verification. (May 2022) |
The Athens Metro (Greek: Μετρό Αθήνας, romanized: Metro Athinas) is a rapid transit system serving the Athens urban area in Greece. Line 1 opened as a single-track conventional steam railway in 1869 and was electrified in 1904. Beginning in 1991, Elliniko Metro S.A. constructed and extended Lines 2 and 3.[4] It has significantly changed Athens by providing a much-needed solution to the city's traffic and air pollution problem, as well as revitalising many of the areas it serves. Extensions of existing lines are under development or tender, like the Line 2 extension to Ilion where tender started in 2023, as well as a new Line 4, whose central section began construction in October 2021.[5] The Athens Metro is actively connected with the other means of public transport, such as buses, trolleys, the Athens Tram and the Athens Suburban Railway. The Athens Metro is hailed for its modernity (mainly the newer lines 2, 3), and many of its stations feature works of art, exhibitions and displays of the archaeological remains found during its construction. Photography and video-taking is permitted across the whole network[6] and street photographers often work in Athens Metro. This will be the only metro system in Greece, until the Thessaloniki Metro begins operation in 2024.
History
[edit]You can help expand this section with text translated from the corresponding article in Greek. (October 2022) Click [show] for important translation instructions.
|
Piraeus–Kifissia Railway (Line 1)
[edit]Until 28 January 2000, Line 1 was the only rapid-transit line in Athens. The Athens and Piraeus Railway Company (SAP) opened a steam single-track mixed cargo and passenger railway line on 27 February 1869 and was run between Piraeus and Thiseio. It was electrified in 1904. On 4 February 1885 Lavrion Square-Strofyli steam narrow gauge single-track mixed cargo and passenger railway line opened and was run at the time from Attiki Square to Kifissia through Iraklio. These originally mixed cargo and passenger railway lines gradually merged and converted to a rapid-transit system. The section between Kifissia and Strofyli was abandoned.
From 1869 to 1926 the line was operated by SAP. From 1926 to 1976 the line was operated by Hellenic Electric Railways (EIS). In 1976 the EIS was nationalized and renamed Athens-Piraeus Electric Railway Company (ISAP), which continued to operate what became line 1 of the Athens Metro until 16 June 2011.[7]
1990s projects
[edit]Since the current Line 1 opened, the government has proposed many expansions to the subway network, including a 1963 plan for a fourteen-line subway network.[8] Construction of Lines 2 and 3 began in November 1992 to decrease traffic congestion and improve Athens' air quality by reducing its smog level.[4] Both lines were constructed underground. Lines 2 and 3, built by Attiko Metro S.A. and operated until 2011 by Attiko Metro Operations Company, are known respectively as the red and blue lines and were inaugurated in January 2000. Line 3 was extended to the Eleftherios Venizelos International Airport in summer 2004, and Line 2 was extended to Anthoupoli and Elliniko in 2013.
Consolidation
[edit]Until 17 June 2011,[7] the operational management of the Athens Metro network was similar to that of the London Underground network before the creation of the London Passenger Transport Board and the absorption of the Metropolitan Railway on 1 July 1933. The Greek government attempted to absorb ISAP into Attiko Metro operation company under Law 2669/1998 so the latter would be responsible for the whole network,[9] but this initiative failed.[why?] Athens Metro operations were consolidated when the Greek government enacted Law 3920/2011,[10] replacing AMEL, ISAP and Tram S.A. with Urban Rail Transport S.A. (STASY S.A.) (Greek: ΣΤΑΣΥ Α.Ε.), a subsidiary of OASA S.A. (Athens Urban Transport Organisation S.A.).[11]
Timeline
[edit]Line | Segment | Construction Started | Year Opened |
---|---|---|---|
Piraeus-Thiseio | 1856 | 27 February 1869 | |
Thiseio-Omonoia | 1889 | 17 May 1895 | |
Omonoia-Victoria | January 1928 | 1 March 1948 | |
Victoria-Attiki | 30 June 1949 | ||
Attiki-Ano Patisia | 12 February 1956 | ||
Ano Patisia-Nea Ionia | 14 March 1956 | ||
Nea Ionia-Irakleio | 4 March 1957 | ||
Irakleio-Kifissia | 10 August 1957 | ||
Sepolia-Syntagma | November 1992 | 28 January 2000 | |
Syntagma-Ethniki Amyna | |||
Syntagma-Dafni | 15 November 2000[12] | ||
Syntagma-Monastiraki | 22 April 2003 | ||
Dafni-Agios Dimitrios | April 2001 | 5 June 2004 | |
Ethniki Amyna-Athens Airport | December 2000 | 30 July 2004 | |
Neratziotissa (Infill station) | February 2002 | 6 August 2004 | |
Sepolia-Agios Antonios | February 2002 | 9 August 2004 | |
Monastiraki-Egaleo | May 2002 | 26 May 2007 | |
Agios Antonios-Anthoupoli | May 2007 | 6 April 2013 | |
Agios Dimitrios-Elliniko | January 2007 | 26 July 2013 | |
Egaleo-Agia Marina | 14 December 2013 | ||
Agia Marina-Nikaia | July 2012 | 7 July 2020 | |
Nikaia-Dimotiko Theatro | 10 October 2022 |
Infrastructure
[edit]Lines and stations
[edit]The Athens Metro consists of three lines totalling 91.7 kilometres (57.0 miles) and 66 stations: Line 1 (Green) is 25.7 kilometres (16.0 miles) long with 24 stations, Line 2 (Red) is 18.7 kilometres (11.6 miles) long with 20 stations, and Line 3 (Blue) is 47.3 kilometres (29.4 mi) long with 24 stations.[3] STASY owns and operates 62 of the 66 stations: three other stations (Pallini, Paiania–Kantza and Koropi) belong to GAIAOSE and the Athens Airport station belongs to the operator of the Athens International Airport.
The system has five interchanges, at Attiki, Monastiraki, Omonia, Piraeus and Syntagma, allowing all three to interchange with each other at least once. Each line also has at least one connection with the Athens Suburban Railway, and the Athens Tram.
Line | Map colour[e] |
Opened | Last extension |
Type | Stations | Length | Termini | Ref. |
---|---|---|---|---|---|---|---|---|
Green | 27 February 1869 | 10 August 1957 | Sub surface | 24 | 25.7 km (16.0 mi) | [16] | ||
Red | 28 January 2000 | 26 July 2013 | Deep level | 20 | 18.7 km (11.6 mi) | [17][18] | ||
Blue | 28 January 2000 | 10 October 2022 | Deep level | 27 | 47.3 km (29.4 mi)[c] | [17][19] | ||
Total: | 66[f] | 91.7 km (57.0 mi) |
Line 2 is entirely underground. Line 1 is mostly overground, with an underground section spanning between the Monastiraki and Attiki stations, and an additional underground station (Kato Patisia) in central Athens. Line 3 is mostly underground; Trains that run an overground route are only those with the airport as final destination. The overground section of Line 3, east of the tunnel portal near Doukissis Plakentias, is open. In the tunnel sections up and down lines share a common tunnel, except for approaches to stations with an island platform (such as Egaleo). Train maintenance facilities are located at Attiki, Faliro, Irini, Piraeus, Kifissia and Thissio for Line 1, and Doukissis Plakentias, Eleonas and Sepolia for Lines 2 and 3.
The Athens Metro's three lines carried approximately 1,353,000 passengers daily in 2010.[1]
A network map of the Athens Metro system, that includes the three current lines, the under construction line 4, the tramway, the suburban railway and all the future under design extensions.[13]
Rolling stock
[edit]The network uses standard gauge electric trains which in most places run on 750 V DC third rail, but the section of Line 3 running to the airport requires trains which can use overhead lines of 25 kV AC, 50 Hz.
The Athens Metro classifies rolling stock by "batch" for Line 1 and "generation" for Lines 2 and 3 because ISAP and AMEL used different classification systems for rolling stock before consolidation. Six types of rolling stock operate on the network, all equipped with third rail current collection systems; however, only seven second-generation trains have the necessary overhead line equipment to serve Line 3 from Doukissis Plakentias to Athens Airport.
The eighth batch (introduced in 1983) is the oldest rolling stock in passenger service, while the third generation (introduced in 2013) is the latest rolling stock in passenger service. The eighth- and tenth-batch stock is externally similar, but the former has split-flap headsigns in Johnston typeface and a cream-and-green interior colour scheme. An extensive refurbishment programme is in progress for the 8th batch (as of 2023), and to cover for trains undergoing refurbishment, up to five 1st generation Line 2/3 trains have been borrowed to operate on Line 1.
Line 1 halfsets have driving cabs at both ends, unlike the Line 2/3 halfsets which have a driving cab at the outer ends, but only basic driving apparatus for shunting purposes only at the inner ends; thus, they can only operate on their own inside depots.
Line 1
[edit]Name | Manufacturer | Image | Lines | Number of Coaches per Trainset | Number of Doors per Side | Passengers | In service since | About |
---|---|---|---|---|---|---|---|---|
8th Batch | MAN SE, Siemens Mobility | 8th Batch trainset at Kifisia (2009) |
5 | 4 | 830 | 1983–1985 | The 8th batch, also known as Columbia, from the well-known space shuttle is the oldest of the series of trainsets that runs on the Athens Metro network. As of 2023, 14 trainsets is under upgrade. | |
10th Batch | MAN SE, AEG, Siemens Mobility, Hellenic Shipyards Co. | 10th Batch trainset at Piraeus (2011) |
5 | 4 | 830 | 1993–1995 | The 10th batch is the second oldest range of wagons that runs on the Athens Metro network. They are identical in appearance with the 8th batch and known by the same nickname. An upgrade of the train is anticipated. | |
11th Batch | Adtranz, Siemens Mobility, Hellenic Shipyards Co., Bombardier Transportation | 11th Batch trainset at Neratziotissa (2007) |
6 | 4 | 1002 | 2000–2004 | The 11th batch was the only batch of Line 1 of the Athens Metro which has 6 coaches, before 1st generation trains of the Lines 2 and 3 enter service on Line 1. An upgrade of the trains is anticipated. | |
1st Generation |
Siemens Mobility, Daimler-Benz, Alsthοm | 6 | 4 | 1,030 | 2000 | The 1st generation is the oldest batch of 2 and 3 line trainsets and the only one in the whole network with sliding doors and not locking doors. Some first generation trains are also used on line 1. |
Lines 2 & 3
[edit]Name | Manufacturer | Image | Lines | Number of Coaches per Trainset | Number of Doors per side | Speed (km/h) |
Passengers | Units | In operation since |
About |
---|---|---|---|---|---|---|---|---|---|---|
1st Generation |
Siemens Mobility, Daimler-Benz, Alsthοm | 6 | 4 | 80[20] | 1,030 | 28 | 2000 | The 1st generation is the oldest batch of 2 and 3 line trainsets and the only one in the whole network with sliding doors and not locking doors. Some first generation trains are also used on line 1. | ||
2nd Generation | Hanwha-Rotem, Mitsubishi Vapor, Knorr-Bremse | 6 | 4 | 80 (DC) 120 (DC/AC)[21] |
1,062 (DC) 1,026 (DC/AC) |
21 (7 DC/AC & 14 DC) | 2003 | The second generation operates under the standard line voltage of 750 V DC from third rail, but 7 trains from line 3 are able to operate under 25 kV 50 Hz AC from overhead catenary with a pantograph in order to serve the section from Doukissis Plakentias to the Airport. | ||
3rd Generation | Hyundai Rotem, Siemens Mobility | 6 | 4 | 80[22] | 1.032 | 28 | 2014 | The 3rd generation is the latest model of trainsets running on the Athens Metro network. |
Signalling
[edit]Line 1 uses two-aspect red/green home signals, yellow/green distant signals and a passenger information system (PIS). The current system replaced 1950s-era semaphore signals. The automatic train protection (ATP) system of Line 1 was fully installed in 2023 which replaced the previous Indusi system.[23]
Lines 2 and 3 use the Alstom automatic train supervision system (ATS) and a passenger information system (PIS). Two-aspect red/white colour signals are used at points and junctions only.
Fares
[edit]Fares are prepaid, either as short term tickets valid for 90 minutes, 24 hours, three days, five days, or as long term tickets. As of September 2020, there are two types of fare products, the ATH.ENA Ticket and ATH.ENA Card, both of which are validated using a contactless system (by scanning the ticket or card at the electronic validating machines). The tickets are valid on all modes of public transport in Athens except on trains and buses to the airport.[24] Passengers cannot buy a fare on board the bus. To travel to or from the airport, passengers may buy a one-way ticket for €9 or a 3-day ticket for €20 which also includes unlimited local trips and a return trip to the airport. Arrival at the airport without having paid the appropriate fare will incur a €72 fine, reduced to €36 if paid within 10 days. Term tickets are available in 30, 90, 180, and 365 day periods and are available only with a personalized ATH.ENA Card. Reduced fares are available for university students, seniors, disabled and persons under 18. During a fare control the passengers that are entitled to a reduced fare have to show ID card, student card or passport.[25] Children under the age of 6 are entitled to travel for free with all means of transportation. On buses and trams the ticket or card must be validated only when entering the vehicle/car by scanning the ticket at the electronic validating machines. At metro or Suburban Railway stations, the ticket or card must be validated at the electronic gates when entering and exiting the station.
Archaeological excavations and exhibits
[edit]During construction of the metro tunnels, artifacts of archaeological interest were discovered and rescue archaeology was employed. Teams of archaeologists worked ahead of, then with, engineers for six years, protecting and recording archaeological finds (streets, houses, cemeteries, sanctuaries, public workshops, foundry pits, kilns, aqueducts, wells, cisterns, drains and sewage tunnels). This afforded new insight into the city's ancient topography, through unprecedented infrastructure development combined with the study and preservation of archaeological data. Exhibitions of ancient artifacts or replicas are found at a number of metro stations, including Monastiraki, Akropoli and Syntagma.
Future
[edit]The Athens Metro masterplan, as presented in October 2022, consists of the following projects:[26]
Line | Segment | Length | Stations |
---|---|---|---|
Petralona-SNFCC | 4.1 km (2.5 mi) | 4 | |
KAT-Komvos Varympompis | 4.4 km (2.7 mi) | 3* | |
Anthoupoli-Agios Nikolaos | 4 km (2.5 mi) | 3 | |
Agios Nikolaos-Acharnes | 5.5 km (3.4 mi) | 3 | |
Elliniko-Glyfada | 3.6 km (2.2 mi) | 3 | |
Goudi-Lykovrysi | 12.1 km (7.5 mi) | 10 | |
Alsos Veikou-Petroupoli | 6.8 km (4.2 mi) | 6 | |
** | Evangelismos-Ano Ilioupoli | 3.4 km (2.1 mi) | 3 |
*The current Kifissia terminal will be demolished and rebuilt as an underground station.
**The Development Plan refers it as Line 4 branch but there are unofficial plans that this branch is part of the future Line 5.
If and when these projects are completed, the Athens Metro is expected to reach 141.7 km (88.0 mi) in length and serve a total of 110 stations by 2040.
Line 4
[edit]A fourth line is planned for the Athens Metro and it has been incorporated in the roadmap for the development and expansion of public transport in Athens since 2005. The new line in its totality will extend over a length of 38.2 km (23.7 mi), adding thirty five (35) new stations to the Athens Metro system. The cost of the entire project is estimated at 3.3 billion EUR.[27] The recommendation is for lighter rolling stock than the type used in existing lines of Athens Metro which would operate automatically without a driver. In November 2020, Alstom was chosen to supply the line with 20 4-car automated Metropolis trains, operated under Urbalis 400 signalling system.[28]
The first phase of Line 4 will be between Alsos Veikou and Goudi stations, predicting fifteen (15) new stations and a length of 12.8 km (8.0 mi) of new track. An invitation to tender for the construction of the first phase of Line 4 was issued in September 2018. The construction started in mid to late-2021 and is scheduled to be completed in 2029 or 2030. The estimated cost for constructing the first phase of the new line is 1.51 billion EUR. Currently, the project of the first phase is considered to follow a PPP scheme which might be extended for constructing the whole new line. An alternative solution is a mixed funding between the EIB and the Greek State. It is also a high-profile candidate project to be included in the Juncker Plan of EU that will include also the second phase of Line 4 of Athens Metro.
The European Investment Bank is allocating a €730 million loan over 30 years to finance the building of the first segment of the Line 4 metro, which will connect Alsos Veikou and Goudi. The initiative will also assist Athens by reducing the number of private automobiles on the road by 53 000, resulting in 318 tonnes fewer CO2 released daily.[29][30][31][32]
Long-term plan
[edit]On 15 November 2008, Greek newspaper Ta Nea reported that the Greek government was considering a circular line from Ano Ilisia to Faros, via Dafni and Eleonas, as part of a "100 km (62 mi)" network.[33] This proposal evolved to form part of what is now the long-term Athens Metro Future Regulatory Plan (or the Souflias plan)[34] on 13 April 2009, which called for an 220 km (140 mi) network of eight lines and 200 stations.[35][36]
The Souflias plan was last revised in January 2012,[37] and saw limited activity until October 2020, when Elliniko Metro announced that they were reconsidering some extensions from the plan, including the extension of Line 1 from Kifissia to Nea Erythraia, the extensions of Line 2 to Ano Liosia and Glyfada, Line 6 from Melissia to Perama, and Line 7 from Haidari to Kalamaki.[34] In December 2021, a part of the southern branch of Line 6 was reconsidered as a branch of Line 1 from Thiseio to the SNFCC in Kallithea, with intermediate stations at Hamosternas, Plateia Davaki, and Lofos Filaretou.[38][13]
See also
[edit]- Line 1 (Athens Metro)
- Line 2 (Athens Metro)
- Line 3 (Athens Metro)
- Line 4 (Athens Metro)
- Transport for Athens
- Thessaloniki Metro
Notes
[edit]- ^ 3 lines are in operation, with 1 line Line 4 under construction.
- ^ For a list of stations that the Athens Metro serves, see List of Athens Metro stations.
- ^ Between Doukissis Plakentias and Athens Airport.
- ^ None of the organisations behind the construction or operation of the Athens Metro specify the exact line colour values for web or print, but they agree on a general colour scheme for identifying lines.[13][14][15]
- ^ There are 66 stations after counting interchange stations once. Otherwise, there would be 72.
References
[edit]- ^ a b "Homepage - The Company - Attiko Metro S.A." Attiko Metro S.A. Archived from the original on 3 December 2010. Retrieved 2 June 2014.
- ^ "Transit in Athens (history)". Attiko Metro. Athens. 7 November 2022. Archived from the original on 7 November 2022. Retrieved 7 November 2022.
- ^ a b c "Company presentation". STASY (in Greek). Athens. 7 November 2022. Archived from the original on 7 November 2022. Retrieved 7 November 2022.
- ^ a b "AttikoMetro Inside – Base Project". Attiko Metro S.A. 9 September 2012. Retrieved 3 October 2012.
- ^ "Υποβολή φακέλων εκδήλωσης ενδιαφέροντος στο διαγωνισμό για την επέκταση του Μετρό προς Ίλιον". Athens Transport (in Greek). 3 May 2023. Retrieved 19 August 2023.
- ^ "synigoros.gr" (PDF). Archived from the original (PDF) on 14 March 2016.
- ^ a b "Urban Rail Transport SA (STASY SA): Urban Rail Transport S.A". Urban Rail Transport S.A. Retrieved 2 October 2012.
- ^ Hekimoglou, Achilleas (24 August 2013). Οραμα για 14 γραμμές Μετρό στην Αττική από το 2000 (in Greek). Το Βήμα (To Vima). Retrieved 23 February 2024.
- ^ "Law 2669/1998". Εφημερίδας της Κυβερνήσεως (in Greek). A (283). Athens: Government of Greece. 18 December 1998. Retrieved 24 September 2013.
- ^ Law 3920, Government Gazette issue A-33, 3 March 2011.
- ^ Ministerial Decision 28737/2637, Government Gazette issue B-1454, 17 June 2011
- ^ Delezos, Kostas; Renieris, Antonis (14 November 2000). "To… Dafni by Metro". Ta Nea (in Greek). Athens: Alter Ego Media. Archived from the original on 19 October 2022. Retrieved 20 October 2022.
- ^ a b c "Athens Metro Lines Development Plan" (PDF). Attiko Metro. Athens. September 2022. Archived from the original (PDF) on 4 October 2022. Retrieved 4 October 2022.
- ^ "Athens Public Transportation Map". Transport for Athens. Retrieved 17 March 2020.
- ^ "Metro and Tram Map" (PDF). STASY (in Greek). Athens. 11 October 2022. Archived from the original (PDF) on 2 November 2022. Retrieved 2 November 2022.
- ^ "Stations". Athens Piraeus Electric Railways (in Greek). Athens. 17 January 2012. Archived from the original on 17 January 2012. Retrieved 18 October 2022.
- ^ a b Delezos, Kostas (28 January 2000). "From today, Athens moves to the rhythm of the Metro". Ta Nea (in Greek). Athens: Alter Ego Media. Archived from the original on 18 October 2022. Retrieved 18 October 2022.
- ^ Klonos, Artemis (29 July 2013). "Athens metro reaches Elliniko". International Railway Journal. Omaha: Simmons-Boardman Publishing. Archived from the original on 18 October 2022. Retrieved 18 October 2022.
- ^ Burroughs, David (12 October 2022). "Athens Metro Line 3 Phase 2 extension opens". International Railway Journal. Omaha: Simmons-Boardman Publishing. Archived from the original on 17 October 2022. Retrieved 17 October 2022.
- ^ "Πρώτη γενιά συρμών – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε." ametro.gr (in Greek). Retrieved 6 December 2017.
- ^ [1] Δεύτερη γενιά συρμών, Αττικό Μετρό Α.
- ^ "Τρίτη γενιά συρμών – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε." (in Greek). Archived from the original on 29 December 2018. Retrieved 27 December 2018.
- ^ "Ενεργοποιήθηκε το Σύστημα Ασφάλειας Κυκλοφορίας Συρμών στη γραμμή του ΗΣΑΠ". Athens Transport (in Greek). 20 March 2023. Retrieved 18 August 2023.
- ^ "Tickets" (PDF). OASA S.A. Retrieved 22 September 2015.
- ^ "Travel Cards". STASY S.A./OASA S.A. (in Greek). Retrieved 23 September 2015.
- ^ "Development plan of Athens Metro lines" (PDF). ametro.gr (in Greek). 2 November 2022. Retrieved 2 November 2022.
- ^ "Attiko Metro Γραμμή 4 (Line 4)". Attiko Metro S.A. Retrieved 17 March 2020.
- ^ "Alstom consortium selected for first section of Athens Metro Line 4". Alstom. Retrieved 5 November 2020.
- ^ Bank, European Investment (17 May 2023). "Cohesion and regional development Overview 2023".
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ pamela (10 February 2022). "Financing agreement for Alsos Veikou – Goudi metro section". Railway PRO. Retrieved 15 June 2023.
- ^ Rani, Archana (8 February 2022). "Attiko receives $663m EIB loan for new Athens Metro line". Railway Technology. Retrieved 15 June 2023.
- ^ Bank, European Investment (11 September 2023). "Sustainable transport overview 2023".
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ Prokopis, Giogiakas (15 November 2008). "New lines for 100 km Metro". Ta Nea (in Greek). Athens: Alter Ego Media. Archived from the original on 4 October 2022. Retrieved 4 October 2022.
- ^ a b "Attiko Metro pulls the "Souflias plan" out of the drawer". Athens Transport (in Greek). 13 October 2020. Archived from the original on 4 October 2022. Retrieved 4 October 2022.
- ^ "New Regulatory Plan for Athens and Attica Prefecture". Attiko Metro. Athens. 13 April 2009. Archived from the original on 28 May 2009. Retrieved 4 October 2022.
- ^ "Regulatory Plan of Attica: Development Plan of Future Metro Lines" (PDF). Attiko Metro (in Greek). Athens. April 2009. Archived from the original (PDF) on 22 November 2009. Retrieved 4 October 2022.
- ^ "Athens Metro Regulatory Plan" (PDF). Attiko Metro (in Greek). Athens. January 2012. Archived from the original (PDF) on 4 October 2022. Retrieved 4 October 2022.
- ^ Rizos, Pavlos (16 December 2021). "Athens Metro: all the new extensions to the West, North and South Suburbs". ypodomes.com (in Greek). Archived from the original on 4 October 2022. Retrieved 4 October 2022.
External links
[edit]- Athens Metro Map on Google earth with geolocation Archived 24 May 2019 at the Wayback Machine
- Urban Rail Transport Company (STASY S.A.)
- Attiko Metro Company (Construction and Infrastructure)
- Athens Urban Transport Organisation (OASA S.A.)
- UrbanRail.Net – Athens Metro
- CityRailTransit – Athens railway map (real distance)
- Athens metro guide