Jump to content

MEG Energy: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m v2.04b - Bot T7 Special:LintError/missing-end-tag - Fix errors for CW project (Missing end tag)
grammar
 
(11 intermediate revisions by 10 users not shown)
Line 1: Line 1:
{{Short description|Canadian oil sands production company}}
{{Infobox company
{{Infobox company
| name = MEG Energy Corp.
| name = MEG Energy Corp.
Line 10: Line 11:
| founder =
| founder =
| location_city = [[Calgary]], Alberta, Canada
| location_city = [[Calgary]], Alberta, Canada
| key_people = Derek W. Evans<ref>http://www.megenergy.com/news-room/article/meg-energy-names-derek-evans-new-chief-executive-officer</ref> <small>chair, pres, ceo</small><br>Dale Hohm <small>[[chief financial officer|cfo]]</small>
| key_people = Derek W. Evans<ref>{{Cite web|url=http://www.megenergy.com/news-room/article/meg-energy-names-derek-evans-new-chief-executive-officer|title=MEG Energy &#124; MEG Energy Names Derek Evans as New Chief Executive Officer}}</ref> <small>chair, pres, ceo</small><br>Dale Hohm <small>[[chief financial officer|cfo]]</small>
| industry = [[Oil and gas industry]]
| industry = [[Oil and gas industry]]
| products = [[Petroleum]]<br/>[[Electricity]]
| products = [[Petroleum]]<br/>[[Electricity]]
| revenue = {{increase}}$3,931 million <small>(2019)<ref name=twelvefin>{{cite web|url=https://www.megenergy.com/sites/default/files/MEGEnergyCorp_YE2019_CombinedReport_FINAL.pdf}}</ref></small>
| revenue = {{increase}}$3,931 million <small>(2019)<ref name=twelvefin>{{cite web|url=https://www.megenergy.com/sites/default/files/MEGEnergyCorp_YE2019_CombinedReport_FINAL.pdf|title=Archived copy|access-date=2021-01-12|archive-date=2021-01-13|archive-url=https://web.archive.org/web/20210113043927/https://www.megenergy.com/sites/default/files/MEGEnergyCorp_YE2019_CombinedReport_FINAL.pdf|url-status=dead}}</ref></small>
| net_income = C($72) million <small>(2019<ref name=twelvefin/>{{increase}}43%</small>
| net_income = C($72) million <small>(2019<ref name=twelvefin/>{{increase}}43%</small>
| assets = C$7,866 million <small>(2019)<ref name=twelvefin/>{{decrease}}6%</small>
| assets = C$7,866 million <small>(2019)<ref name=twelvefin/>{{decrease}}6%</small>
| equity = $3,853 million <small>(2019){{decrease}}.85%</small>
| equity = $3,853 million <small>(2019){{decrease}}.85%</small>
| num_employees = 485 (June 2013)
| num_employees = 485 (June 2013)
| production = {{convert|93.082|e3BOE|lk=in}} per day<ref>{{cite web|url=https://www.megenergy.com/sites/default/files/MEGEnergyCorp_YE2019_CombinedReport_FINAL.pdf | title=Meg Energy reports}}</ref>(2019)
| production = {{convert|93.082|e3BOE|lk=in}} per day<ref>{{cite web |url=https://www.megenergy.com/sites/default/files/MEGEnergyCorp_YE2019_CombinedReport_FINAL.pdf |title=Meg Energy reports |access-date=2021-01-12 |archive-date=2021-01-13 |archive-url=https://web.archive.org/web/20210113043927/https://www.megenergy.com/sites/default/files/MEGEnergyCorp_YE2019_CombinedReport_FINAL.pdf |url-status=dead }}</ref>(2019)
| homepage = {{url|www.megenergy.com}}
| homepage = {{url|www.megenergy.com}}
}}
}}
'''MEG Energy''' is a [[pure play]] Canadian [[oil sands]] producer engaged in exploration in [[Athabasca oil sands|Northern Alberta]]. All of its oil reserves are more than {{convert|1000|ft}} below the surface and so they depend on [[steam-assisted gravity drainage]] and associated technology to produce (heavy [[bitumen]] must first be brought to the surface). The company's main thermal project is [[Christina Lake (Alberta)|Christina Lake]]. 85-megawatt [[cogeneration]] plants are used to produce the steam used in SAGD which is required to bring bitumen to the surface. The excess heat and electricity produced at its plants is then sold to Alberta's power grid. Its [[Oil reserves#Proven reserves|proven reserves]] have been independently pegged at {{convert|1.7|Goilbbl}} and probable reserves (also called recoverable resource) {{convert|3.7|Goilbbl}} (by engineering firm GLJ Petroleum Consultants Ltd [http://www.gljpc.com/]); That's significant considering only {{convert|300|Goilbbl}} of the {{convert|1.6|Toilbbl}} of bitumen in Alberta is considered recoverable under current technology.<ref name=daily/> The value of those reserves is over $19.8 billion.<ref>{{cite news|url=https://www.theglobeandmail.com/globe-investor/investment-ideas/streetwise/meg-energy-launches-massive-ipo/article1604238/|title=MEG Energy launches massive IPO|date=2010-06-14 | location=Toronto|work=The Globe and Mail|first=Andrew|last=Willis}}</ref> CNOOC has a minority 16.69% interest in MEG Energy.<ref name=heavyoil/>
'''MEG Energy''' is a [[pure play]] Canadian [[oil sands]] producer engaged in exploration in [[Athabasca oil sands|Northern Alberta]]. All of its oil reserves are more than {{convert|1000|ft}} below the surface, so they depend on [[steam-assisted gravity drainage]] and associated technology to produce (heavy [[bitumen]] must first be brought to the surface). The company's main thermal project is [[Christina Lake (Alberta)|Christina Lake]]. 85-megawatt [[cogeneration]] plants are used to produce the steam used in SAGD which is required to bring bitumen to the surface. The excess heat and electricity produced at its plants is then sold to Alberta's power grid. Its [[Oil reserves#Proven reserves|proven reserves]] have been independently pegged at {{convert|1.7|Goilbbl}} and probable reserves (also called recoverable resource) {{convert|3.7|Goilbbl}} (by engineering firm GLJ Petroleum Consultants Ltd [http://www.gljpc.com/]); That's significant considering only {{convert|300|Goilbbl}} of the {{convert|1.6|Toilbbl}} of bitumen in Alberta is considered recoverable under current technology.<ref name=daily/> The value of those reserves is over $19.8 billion.<ref>{{cite news|url=https://www.theglobeandmail.com/globe-investor/investment-ideas/streetwise/meg-energy-launches-massive-ipo/article1604238/|title=MEG Energy launches massive IPO|date=2010-06-14 | location=Toronto|work=The Globe and Mail|first=Andrew|last=Willis}}</ref> [[China National Offshore Oil Corporation|CNOOC]] has a minority 16.69% interest in MEG Energy.<ref name=heavyoil/>


Within nine months of going public it reached [[Market capitalization#Categorization of companies by capitalization|large cap]] company status after a small cap [[initial public offering|ipo]]. As recently as 2007 it was a junior oil company.<ref>{{cite web|url=http://www.plantsuccess.com/speakers.php?conf=1001|title=Plantsuccess 2008 Canada|year=2008|url-status=dead|archive-url=https://web.archive.org/web/20081026194236/http://www.plantsuccess.com/speakers.php?conf=1001|archive-date=2008-10-26}}</ref>
Within nine months of going public it reached [[Market capitalization#Categorization of companies by capitalization|large cap]] company status after a small cap [[initial public offering|ipo]]. As recently as 2007 it was a junior oil company.<ref>{{cite web|url=http://www.plantsuccess.com/speakers.php?conf=1001|title=Plantsuccess 2008 Canada|year=2008|url-status=dead|archive-url=https://web.archive.org/web/20081026194236/http://www.plantsuccess.com/speakers.php?conf=1001|archive-date=2008-10-26}}</ref>
Line 28: Line 29:
MEG Energy was founded in 1999 as McCaffrey Energy Group Inc by CEO and President Bill McCaffrey, Director and Corporate Secretary David Wizinsky and former Director Steve Turner. It went public with an IPO of $660 million in August 2010.<ref name=heavyoil>{{cite web|url=http://www.heavyoilinfo.com/news-1/meg-energy-doubling-size-of-oilsands-project|title=MEG Energy doubling size of oilsands project|date=2010-08-10}}</ref> At the time it was considered a $9.7 billion equity cap company.<ref>{{cite web|url=http://www.ogfj.com/index/article-display/1674648561/articles/oil-gas-financial-journal/unconventional/oil-sands/oil-sands_company.html|title=Oil sands company MEG plants $500 million senior notes offering|date=2010-03-09}}</ref> The Christina Lake project first received approval from the government in 2008, it was one of six [[Oil megaprojects (2008)|oil megaprojects]] in Canada that year.
MEG Energy was founded in 1999 as McCaffrey Energy Group Inc by CEO and President Bill McCaffrey, Director and Corporate Secretary David Wizinsky and former Director Steve Turner. It went public with an IPO of $660 million in August 2010.<ref name=heavyoil>{{cite web|url=http://www.heavyoilinfo.com/news-1/meg-energy-doubling-size-of-oilsands-project|title=MEG Energy doubling size of oilsands project|date=2010-08-10}}</ref> At the time it was considered a $9.7 billion equity cap company.<ref>{{cite web|url=http://www.ogfj.com/index/article-display/1674648561/articles/oil-gas-financial-journal/unconventional/oil-sands/oil-sands_company.html|title=Oil sands company MEG plants $500 million senior notes offering|date=2010-03-09}}</ref> The Christina Lake project first received approval from the government in 2008, it was one of six [[Oil megaprojects (2008)|oil megaprojects]] in Canada that year.


April 14, 2005 - [[China National Offshore Oil Corporation|CNOOC Ltd]], China's 3rd biggest oil and natural gas company purchased a 16.69% interest in MEG Energy for $C150 million (13.6 million common shares).<ref name=daily>{{cite web|url=http://english.peopledaily.com.cn/200504/14/eng20050414_180996.html|title=http://english.peopledaily.com.cn/200504/14/eng20050414_180996.html|date=2005-04-14}}</ref>
April 14, 2005 - [[China National Offshore Oil Corporation|CNOOC Ltd]], China's 3rd biggest oil and natural gas company purchased a 16.69% interest in MEG Energy for $C150 million (13.6 million common shares).<ref name=daily>{{cite web|url=http://english.peopledaily.com.cn/200504/14/eng20050414_180996.html|date=2005-04-14|title=People's Daily Online -- CNOOC LTD. Acquires stake of Canada-based MEG Energy Corp }}</ref>


==Production==
==Production==
Line 34: Line 35:


==Christina Lake==
==Christina Lake==
MEG's interest in [[Christina Lake (Alberta)|Christina Lake]] includes 80 blocks/sections. It is a three phase project that was operating at 12.4% (26,000 bbls/d) of total expected production capacity at the end of 2010. Since 2009 the first two phases were producing, albeit at a low level because construction of phase 2B (design capacity 40% larger than phase 1 and 2A combined) didn't begin until 2011. When combined with phase three, total production will exceed {{convert|200000|oilbbl/d}} with 2020 production estimated at 260,000 bbls/d.<ref>{{cite web|url=http://www.canadianbusiness.com/article/60665--oilsands-company-meg-energy-to-spend-1-37-billion-in-2012-with-focus-on-growth|archive-url=https://archive.is/20120722121450/http://www.canadianbusiness.com/article/60665--oilsands-company-meg-energy-to-spend-1-37-billion-in-2012-with-focus-on-growth|url-status=dead|archive-date=2012-07-22|title=Oilsands company MEG Energy to spend $1.37 billion in 2012|date=2011-12-06}}</ref> The pipeline system used to carry bitumen out and diluent in is the {{convert|343|km|adj=on}} Access Pipeline which MEG co owns with Devon ARL Corp.<ref>{{cite web|url=http://www.megenergy.com/pdfs/christinalake/publicdisclosure.pdf|title=MEG Energy Christina Lake Phase 3|date=September 2007|url-status=dead|archive-url=https://web.archive.org/web/20110302104352/http://www.megenergy.com/pdfs/christinalake/publicdisclosure.pdf|archive-date=2011-03-02}}</ref>
MEG's interest in [[Christina Lake (Alberta)|Christina Lake]] includes 80 blocks/sections. It is a three phase project that was operating at 12.4% (26,000 bbls/d) of total expected production capacity at the end of 2010. Since 2009 the first two phases were producing, albeit at a low level because construction of phase 2B (design capacity 40% larger than phase 1 and 2A combined) didn't begin until 2011. When combined with phase three, total production will exceed {{convert|200000|oilbbl/d}} with 2020 production estimated at 260,000 bbls/d.<ref>{{cite web|url=http://www.canadianbusiness.com/article/60665--oilsands-company-meg-energy-to-spend-1-37-billion-in-2012-with-focus-on-growth|archive-url=https://archive.today/20120722121450/http://www.canadianbusiness.com/article/60665--oilsands-company-meg-energy-to-spend-1-37-billion-in-2012-with-focus-on-growth|url-status=dead|archive-date=2012-07-22|title=Oilsands company MEG Energy to spend $1.37 billion in 2012|date=2011-12-06}}</ref> The pipeline system used to carry bitumen out and diluent in is the {{convert|343|km|adj=on}} Access Pipeline which MEG co owns with Devon ARL Corp.<ref>{{cite web|url=http://www.megenergy.com/pdfs/christinalake/publicdisclosure.pdf|title=MEG Energy Christina Lake Phase 3|date=September 2007|url-status=dead|archive-url=https://web.archive.org/web/20110302104352/http://www.megenergy.com/pdfs/christinalake/publicdisclosure.pdf|archive-date=2011-03-02}}</ref>


Phase 3 - the most important part of the project is currently awaiting regulatory approval (May 2011). Estimated production is {{convert|150000|oilbbl/d}}.
Phase 3 - the most important part of the project is currently awaiting regulatory approval (May 2011). Estimated production is {{convert|150000|oilbbl/d}}.
Line 46: Line 47:


== Takeover Bid ==
== Takeover Bid ==
In October 2018, Husky Energy put it in a hostile take<ref>{{Cite news|url=https://www.theglobeandmail.com/business/article-meg-chief-says-husky-can-pay-a-lot-more-in-takeover-offer/|title=MEG chief says Husky can 'pay a lot more' in takeover offer}}</ref> over bid to acquire MEG Energy Corp.
In October 2018, Husky Energy put it in a hostile takeover<ref>{{Cite news|url=https://www.theglobeandmail.com/business/article-meg-chief-says-husky-can-pay-a-lot-more-in-takeover-offer/|title=MEG chief says Husky can 'pay a lot more' in takeover offer}}</ref> bid to acquire MEG Energy Corp.


==Initial production process==
==Initial production process==

Latest revision as of 16:39, 9 October 2024

MEG Energy Corp.
Company typePublic
TSXMEG
IndustryOil and gas industry
Founded1999 by William J McCaffery as McCaffery Energy Group Inc
Headquarters
Calgary, Alberta, Canada
Key people
Derek W. Evans[1] chair, pres, ceo
Dale Hohm cfo
ProductsPetroleum
Electricity
Production output
93.082 thousand barrels of oil equivalent (569,460 GJ) per day[2](2019)
RevenueIncrease$3,931 million (2019)[3]
C($72) million (2019[3]Increase43%
Total assetsC$7,866 million (2019)[3]Decrease6%
Total equity$3,853 million (2019)Decrease.85%
Number of employees
485 (June 2013)
Websitewww.megenergy.com

MEG Energy is a pure play Canadian oil sands producer engaged in exploration in Northern Alberta. All of its oil reserves are more than 1,000 feet (300 m) below the surface, so they depend on steam-assisted gravity drainage and associated technology to produce (heavy bitumen must first be brought to the surface). The company's main thermal project is Christina Lake. 85-megawatt cogeneration plants are used to produce the steam used in SAGD which is required to bring bitumen to the surface. The excess heat and electricity produced at its plants is then sold to Alberta's power grid. Its proven reserves have been independently pegged at 1.7 billion barrels (270×10^6 m3) and probable reserves (also called recoverable resource) 3.7 billion barrels (590×10^6 m3) (by engineering firm GLJ Petroleum Consultants Ltd [1]); That's significant considering only 300 billion barrels (48×10^9 m3) of the 1.6 trillion barrels (250×10^9 m3) of bitumen in Alberta is considered recoverable under current technology.[4] The value of those reserves is over $19.8 billion.[5] CNOOC has a minority 16.69% interest in MEG Energy.[6]

Within nine months of going public it reached large cap company status after a small cap ipo. As recently as 2007 it was a junior oil company.[7]

History

[edit]

MEG Energy was founded in 1999 as McCaffrey Energy Group Inc by CEO and President Bill McCaffrey, Director and Corporate Secretary David Wizinsky and former Director Steve Turner. It went public with an IPO of $660 million in August 2010.[6] At the time it was considered a $9.7 billion equity cap company.[8] The Christina Lake project first received approval from the government in 2008, it was one of six oil megaprojects in Canada that year.

April 14, 2005 - CNOOC Ltd, China's 3rd biggest oil and natural gas company purchased a 16.69% interest in MEG Energy for $C150 million (13.6 million common shares).[4]

Production

[edit]

In 2012 bitumen production averaged 28,773 bpd, +2,168 bpd versus the previous year.[3] By the second quarter of 2013 average production had reached 32,144 bpd, +1,715 bdp. Also up is the realized oil price per barrel: $53.98 vs $45.59.

Christina Lake

[edit]

MEG's interest in Christina Lake includes 80 blocks/sections. It is a three phase project that was operating at 12.4% (26,000 bbls/d) of total expected production capacity at the end of 2010. Since 2009 the first two phases were producing, albeit at a low level because construction of phase 2B (design capacity 40% larger than phase 1 and 2A combined) didn't begin until 2011. When combined with phase three, total production will exceed 200,000 barrels per day (32,000 m3/d) with 2020 production estimated at 260,000 bbls/d.[9] The pipeline system used to carry bitumen out and diluent in is the 343-kilometre (213 mi) Access Pipeline which MEG co owns with Devon ARL Corp.[10]

Phase 3 - the most important part of the project is currently awaiting regulatory approval (May 2011). Estimated production is 150,000 barrels per day (24,000 m3/d).

The company operates the Christina Lake Aerodrome.[11]

Cenovus Energy also produces at Christina Lake.

Surmont

[edit]

The company's leases cover over 20,000 acres (8,100 ha) of land. The leases give MEG access to over 650 million barrels (103×10^6 m3) of contingent resources. Production isn't expected to begin until 2018.[6]

Takeover Bid

[edit]

In October 2018, Husky Energy put it in a hostile takeover[12] bid to acquire MEG Energy Corp.

Initial production process

[edit]

Initially two horizontally parallel wells are created. Oil is directed to the lowest well after injecting steam into the one above it in order to heat the area so that the liquid in the area flows downwards (allows for the separation of oil from sand). The steam used comes from MEG's cogeneration plants.

References

[edit]
  1. ^ "MEG Energy | MEG Energy Names Derek Evans as New Chief Executive Officer".
  2. ^ "Meg Energy reports" (PDF). Archived from the original (PDF) on 2021-01-13. Retrieved 2021-01-12.
  3. ^ a b c d "Archived copy" (PDF). Archived from the original (PDF) on 2021-01-13. Retrieved 2021-01-12.{{cite web}}: CS1 maint: archived copy as title (link)
  4. ^ a b "People's Daily Online -- CNOOC LTD. Acquires stake of Canada-based MEG Energy Corp". 2005-04-14.
  5. ^ Willis, Andrew (2010-06-14). "MEG Energy launches massive IPO". The Globe and Mail. Toronto.
  6. ^ a b c "MEG Energy doubling size of oilsands project". 2010-08-10.
  7. ^ "Plantsuccess 2008 Canada". 2008. Archived from the original on 2008-10-26.
  8. ^ "Oil sands company MEG plants $500 million senior notes offering". 2010-03-09.
  9. ^ "Oilsands company MEG Energy to spend $1.37 billion in 2012". 2011-12-06. Archived from the original on 2012-07-22.
  10. ^ "MEG Energy Christina Lake Phase 3" (PDF). September 2007. Archived from the original (PDF) on 2011-03-02.
  11. ^ Canada Flight Supplement. Effective 0901Z 16 July 2020 to 0901Z 10 September 2020.
  12. ^ "MEG chief says Husky can 'pay a lot more' in takeover offer".