Jump to content

USS Modoc (1865)

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Frietjes (talk | contribs) at 14:51, 12 November 2024 (Fate). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
USS Modoc just prior to launching
History
United States
NameUSS Modoc
OrderedApril 1863
BuilderJ.S. Underhill, Greenpoint, Brooklyn
LaunchedJune 1865
CommissionedNever commissioned
FateBroken up, August 1875
General characteristics
Class and typeCasco-class monitor
Displacement1,175 long tons (1,194 t)
Length225 ft (69 m)
Beam45 ft (14 m)
Draft9 ft (2.7 m)
PropulsionScrew steamer
Speed9 knots (17 km/h; 10 mph)
Complement71 officers and enlisted
Armament
Armor
  • Turret: 8 in (200 mm)
  • Pilothouse: 10 in (250 mm)
  • Hull: 3 in (76 mm)
  • Deck: 3 in (76 mm)

USS Modoc, a single turret, an 1,175-ton Casco-class light draft monitor built under contract by J. S. Underhill at Greenpoint, Brooklyn, was completed as a spar torpedo vessel in June 1865. She had no active service, spending her entire Navy career laid up "in ordinary" at Philadelphia. The vessel was renamed Achilles on 15 June 1869, but returned to Modoc on 10 August. The ship was broken up at New York in August 1875.

Design revisions

[edit]

Though the original designs for the Casco-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban C. Stimers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time that the plans were put before the Monitor Board in New York City, Ericsson and Simers had a poor relationship, and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Stimers had failed to compensate for the armour his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 inches (76 mm). Stimers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by nearly two feet and the first few completed vessels had their turrets removed and were converted to torpedo boats with the weapons listed to the right.

Fate

[edit]

Modoc was renamed Achilles on 15 June 1869, but received her original name back on 10 August. She was sold to John Roach and broken up at New York, New York in August 1875.

The plans for the torpedo mechanism on the modified Casco-class monitors.

References

[edit]

Public Domain This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.