Jump to content

Sam Rayburn Tollway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jeffwang (talk | contribs) at 14:30, 27 July 2012. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

State Highway 121 marker State Highway 121 marker
State Highway 121
Route information
Length26 mi[1] (42 km)
Existedby 2006–present
Major junctions
Northeast end US 75 / Spur 399 in McKinney
Major intersections
Southwest end SH 121 / SH 114 in Grapevine
Location
CountryUnited States
StateTexas
Highway system
SH 120 SH 122

The Sam Rayburn Tollway is a tollway operated by the North Texas Tollway Authority[2] that runs from McKinney to Grapevine. Its frontage road is State Highway 121.

The original portion of the toll road from Business 121 near Coppell to FM 2281 opened in May 2006, and toll collection started December 1 of that year. The tolled portion extended to Hillcrest Road in Plano/Frisco on August 31, 2008. The tollway was extended to Custer Rd. on September 1, 2009, and again to Hardin Blvd. in McKinney on October 1, 2009.

The toll portion of was named in honor of Sam Rayburn at a North Texas Tollway Authority meeting on March 16, 2009.

History

The Sam Rayburn Tollway project was divided into five segments, all of which have been completed.

  • Segment 1, from Denton Tap Road to Old Denton Road, opened to traffic in July 2006.
  • Segment 2, which runs from Old Denton Road to Hillcrest Road, officially opened to traffic on Sept. 1, 2008, when NTTA took full responsibility for Segments 1 and 2 as well as the operation, maintenance and construction of the remaining segments of the SRT.
  • NTTA contractors began work on Segment 3 of the SRT in March 2008 . On Sept. 1, 2009, the NTTA opened the main lanes from Hillcrest Road to just east of Custer Road. On Sept. 29, 2009, the NTTA opened the main lanes from just east of Custer Road to west of Hardin Boulevard.
  • Segment 4 encompasses the Sam Rayburn Tollway/U.S. 75 interchange, from west of Hardin Boulevard to just east of U.S. 75. Construction on this portion of the corridor began in December 2008. Four major direct-connecting ramps were open to traffic in December 2010. The last two ramps were opened in March 2011.
  • The Sam Rayburn Tollway/Dallas North Tollway interchange is referred to as Segment 5. The NTTA began construction on Segment 5 in February 2010. It was completed in 2012.

Exit/Junction list

County Location Destinations Notes
Dallas Coppell,
Grapevine
Sandy Lake Road / Grapevine Mills Parkway / Freeport Parkway /
SH 26 south
SH 26 accessible from southbound 121 only
Denton Coppell,
Lewisville


Bus. SH 121 north – Lewisville
Denton Tap Road
MacArthur Boulevard
I-35E (US 77) – Denton, Dallas Northbound exit to I-35E north is via MacArthur Boulevard exit
Carrollton
Marchant Boulevard, Huffines Boulevard
Hebron Parkway
Carrollton Parkway
Lewisville FM 544


Bus. SH 121 south / FM 2281 – Lewisville
The Colony
Standridge Drive
FM 423 (Main Street) – Little Elm, CarrolltonModule:Jct warning: "road" parameter is deprecated
Plano Parkway/Paige Road
Plano Spring Creek Parkway
Legacy Drive
Collin Frisco (north side),
Plano (south side)
Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a nil value). Interchange
SH 289 (Preston Road) Interchange
Hillcrest Road/Rasor Boulevard
Coit Road
Independence Parkway
FM 2478 (Custer Road)
McKinney Alma Road
Stacy Road
Lake Forest Drive/Watters Road
Hardin Boulevard
  • A YouTube video sponsored by the NTTA as the official tour (from Grapevine to McKinney)

References

  1. ^ "Sam Rayburn Tollway Update". Retrieved July 26, 2012.
  2. ^ "Sam Rayburn Tollway". Retrieved July 26, 2012.