General Information
Other name(s): | Waterford Bridge |
---|---|
Beginning of works: | August 1982 |
Completion: | 22 October 1986 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-leaf bascule bridge |
Material: |
approach viaducts: Prestressed concrete bridge bascule span: Steel bridge |
Location
Location: |
Waterford, County Waterford, Ireland |
---|---|
Crosses: |
|
Coordinates: | 52° 15' 54.06" N 7° 7' 6.35" W |
Technical Information
Dimensions
total length | 204 m | |
standard span lengths | 24 m | |
total width | 19.26 m | |
bascule span | length | 40 m |
Cost
cost of construction | Irish pounds 7 900 000 |
Materials
deck |
precast prestressed concrete
|
---|---|
piles |
steel tubes
|
bascule span |
steel
|
Chronology
August 1982 | Construction begins. The bridge is a replacement of an earlier bridge, the John Redmond Bridge built in 1913. |
---|---|
22 October 1984 | Opened officially by Mr. Liam Kavanagh T. D. in the presence of the mayor of Waterford Collr. William Kenneally and the Aldermen and Councillors of Waterford Corporation. |
Participants
Design
Structural engineering
Steel construction
Concrete construction
Lifting
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20013448 - Published on:
23/09/2004 - Last updated on:
05/02/2016