The Park Row station was a major elevated railway terminal constructed on the Manhattan side of the Brooklyn Bridge, across from New York City Hall and the IRT's elevated City Hall station.[4] It served as the terminal for BMT services operating over the Brooklyn Bridge Elevated Line from the BMT Fulton Street Line, BMT Myrtle Avenue Line, and their feeders. Until the opening of the nearby Williamsburg Bridge to elevated train traffic in 1913, it was the only Manhattan station available for elevated trains from Brooklyn and the only elevated station in Manhattan to be owned by a company other than the IRT or its predecessors.

 Park Row
 
Former New York City Subway station
Park Row station, c. 1905
Station statistics
AddressBrooklyn Bridge & Centre St & Brooklyn Bridge Promenade New York, NY 10013
BoroughManhattan
LocalePark Row
Coordinates40°42′44″N 74°0′16″W / 40.71222°N 74.00444°W / 40.71222; -74.00444
DivisionB (BMT)[1]
ServicesBMT Brighton Line (until 1920)
BMT Culver Line
BMT Fulton Street Line
BMT Myrtle Avenue Line
BMT Lexington Avenue Line
Fifth Avenue Line (Brooklyn elevated)
BMT West End Line (until 1916)
StructureElevated
Platforms3 island platforms (2 main terminal, 1 west end)
4 side platforms (2 main terminal, 2 west end)
Spanish solution (West End)
Tracks6 (4 main terminal, 2 West End)
Other information
OpenedSeptember 1, 1898; 126 years ago (September 1, 1898)[2]
ClosedMarch 5, 1944; 80 years ago (1944-03-05)[2]
Traffic
2023[3]
Rank out of 423[3]
Station succession
Next north(Terminus)
Next southSands Street
Location
Park Row Terminal is located in New York City Subway
Park Row Terminal
Park Row Terminal is located in New York City
Park Row Terminal
Park Row Terminal is located in New York
Park Row Terminal
Street map

Map

Station service legend
Symbol Description
Stops all times Stops in station at all times
Stops all times except late nights Stops all times except late nights
Stops late nights only Stops late nights only
Stops late nights and weekends Stops late nights and weekends only
Stops weekdays during the day Stops weekdays during the day
Stops weekends during the day Stops weekends during the day
Stops all times except rush hours in the peak direction Stops all times except rush hours in the peak direction
Stops all times except weekdays in the peak direction Stops all times except weekdays in the peak direction
Stops daily except rush hours in the peak direction Stops all times except nights and rush hours in the peak direction
Stops rush hours only Stops rush hours only
Stops rush hours in the peak direction only Stops rush hours in the peak direction only
Station closed Station is closed
(Details about time periods)

Early history

edit
 
Park Row seen from the top of the Brooklyn Bridge

For the first fifteen years of its existence, it was used exclusively by trains of the New York and Brooklyn Bridge Railway, a cable-hauled line that spanned the length of the bridge between Park Row and another terminal at the Brooklyn end of the bridge.[5]

On June 18, 1898, elevated trains of predecessor companies of the BMT began using the station during off-peak hours, while the cable-hauled shuttle continued to run at rush hours.[5]: 15  Traffic at the station peaked in 1907, during what was known as the "Brooklyn Bridge crush", and additional stairways from the street to the terminal station were built.[6] On January 27, 1908, the shuttle was eliminated and elevated trains began running to Park Row at all times.[7]

At its height, Park Row Terminal had four platforms on four tracks in the main part of the terminal, and another three platforms on two tracks beyond (west of) the main train shed. This resulted in very complex scheduling and track shifting, so that most trains discharged their passengers at dedicated exit platforms and then were transferred to tracks on other platforms for loading of outgoing passengers.[5]

Services

edit

From 1898 until 1913, the following lines were hosted at least part-time at Park Row:

Gradual decline

edit
Circa 1911 view of City Hall Park, with the terminal at right

As new bridges and new subways took the pressure off the Brooklyn Bridge services, ridership at Park Row gradually declined. In 1913, BMT built the nearby Chambers Street Subway Station below the yet to be completed Manhattan Municipal Building, although nine years earlier IRT had built the Brooklyn Bridge subway station at Center Street and Park Row.[5]: 16–17 

October 27, 1913, was the last day of Sea Beach elevated service, in preparation for the new grade-separated line that began to use the BMT Fourth Avenue Line on June 22, 1915. On June 23, 1916, West End trains began using the Fourth Avenue subway exclusively. This was followed by the withdrawal of Brighton Beach service on August 1, 1920, when Brighton Beach trains began using a new connection to the BMT Broadway Line subway, severing its connection with the Fulton Street Line. On May 30, 1931, some Culver trains were rerouted to the Fourth Avenue subway and the BMT Nassau Street Line when the latter line opened.[5]: 18 

In 1936, Park Row was reconfigured to two tracks total (the two southern main shed tracks) due to declining use and to simplify operations. On May 31, 1940, in preparation for the New York City takeover of the BMT system, the Fifth Avenue and Bay Ridge lines and services were abandoned, which also ended remaining Culver elevated service via those lines. The main line of the Fulton Street line was abandoned at the same time and, on June 1, a new service, Fulton–Lex, was introduced, bringing trains from the surviving outer portion of the Fulton Street Line to Park Row over the Broadway, Lexington and Myrtle Avenue Lines.[5]: 19 

On March 5, 1944, all remaining elevated lines stopped using Park Row, and the Myrtle Avenue, Lexington Avenue, and Fulton–Lex services were cut back to the Bridge Street station in downtown Brooklyn.[5]: 20  Brooklyn Bridge streetcars were shifted to the elevated tracks and used them until 1950, when all public transit was removed from the bridge.[5]: 20 [8] The streetcars did not use the Park Row terminal, but continued to use the trolley loops beneath the train shed, which was torn down.

References

edit
  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b "Brooklyn Bridge Train Service Ends Today -- Trolley Cars Stay On". The Brooklyn Daily Eagle. March 5, 1944. p. 11. Retrieved October 22, 2019 – via Newspapers.com.  
  3. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  4. ^ City Hall / Park Row Complex
  5. ^ a b c d e f g h Small, Charles S. (1957). "The Railway of the New York and Brooklyn Bridge". The Railway and Locomotive Historical Society Bulletin (97): 7–20. ISSN 0033-8842. JSTOR 43520182.
  6. ^ "Bridge Terminal to Be Razed Soon; Extension of Brooklyn Span Station at Park Row to Be Closed March 31". The New York Times. March 4, 1935. ISSN 0362-4331. Retrieved May 13, 2023.
  7. ^ Cudahy, Brian (2002). How We Got to Coney Island: The Development of Mass Transportation in Brooklyn and Kings County. Fordham University Press. p. 168.
  8. ^ "Brooklyn Bridge Traffic Will Undergo Changes". The New York Times. March 3, 1950. ISSN 0362-4331. Retrieved June 27, 2019.