Canning Bridge railway station

Canning Bridge railway station is a suburban railway and bus station on the Mandurah line in Perth, Western Australia. Situated in the suburb of Como next to the Canning River, the station is located at the interchange between the Kwinana Freeway and Canning Highway. The train platforms are at ground level within the median strip of the freeway, while the bus stands are on the bridge carrying Canning Highway.

Canning Bridge
Facing south
General information
LocationCanning Highway & Kwinana Freeway
Como, Western Australia
Australia
Coordinates32°00′35″S 115°51′22″E / 32.009605°S 115.856154°E / -32.009605; 115.856154
Owned byPublic Transport Authority
Operated byPublic Transport Authority
Line(s)     Mandurah line
Distance7.2 km (4.5 mi) from Perth Underground
Platforms2 side platforms
Tracks2
Bus routes9
Bus stands4
Construction
ParkingNone
AccessibleYes
Other information
Fare zone1
History
Opened
  • 11 February 2002 (bus)
  • 23 December 2007 (train)
Passengers
2013–14932,132
Services
Preceding station Transperth Transperth Following station
Elizabeth Quay Mandurah line
All, W
Bull Creek
Location
Map
Location of Canning Bridge station

Canning Bridge station opened as a bus station on 11 February 2002 to facilitate transfers between buses on the Kwinana Freeway and on Canning Highway. The ground-level bus stops closed on 29 January 2006 for conversion to train platforms by John Holland Group. The Mandurah line opened on 23 December 2007. The station is planned to be upgraded to improve the bus interchange as part of Metronet.

Trains at Canning Bridge station run at a five-minute frequency during peak hour, lowering to a fifteen-minute frequency off-peak and on weekends and public holidays. At night, trains are half-hourly or hourly. The journey to Perth Underground station takes seven minutes. There are ten bus routes that serve the station, including bus routes to Curtin University and Fremantle.

Description

edit

Canning Bridge station is located at the interchange between the Kwinana Freeway and Canning Highway in Como, next to the Canning River and the Canning Bridge which crosses that river. The station is on the Mandurah line, which is part of the Transperth train system and owned by the Public Transport Authority, a state government agency.[1] The next stations are Elizabeth Quay to the north and Bull Creek to the south.[2] Canning Bridge station is 7.2 kilometres (4.5 mi) from Perth Underground station[3] and is in fare zone one.[4]

Canning Bridge station has two 150-metre (490 ft) side platforms, which are located at ground level within the median strip of the Kwinana Freeway.[5] At bridge level is a bus interchange with four bus stands. The two westbound bus stands are within the median of Canning Highway and the two eastbound bus stands are on the side of the highway. Each group of bus stands is linked to the platforms via stairs and a lift. A northbound bus on-ramp and southbound bus off-ramp link the bus interchange to the Kwinana Freeway towards Perth.[6][7] Canning Bridge is the only station on the Mandurah line to not have toilets[8] and the only station outside the Perth central business district (CBD) to not have any parking.[5] The station is fully accessible,[2] but pedestrian access to the station has come under criticism for requiring people to cross the on- or off-ramps.[9]

History

edit

Early history as a bus station

edit

From February to April 1987, Transperth and the Main Roads Department trialled a contraflow bus lane along the southbound Kwinana Freeway carriageway from the Perth CBD to South Terrace during the morning peak.[10][11][12] After the trial, it was decided that a permanent bus lane on the northbound carriageway from Canning Highway to the CBD would be built instead.[13][14] This involved building a curved bridge to take buses from Canning Highway over the northbound freeway carriageway and into the freeway median.[14][15] The bridge was built by Bocol Constructions.[16] The curved 55.7-metre (183 ft) span over the freeway was incrementally launched, which limited disruption to freeway traffic, while the rest of the bridge was constructed conventionally.[17] The bus lane was opened on 18 November 1989 by Transport Minister Bob Pearce. The City Busport (now known as Elizabeth Quay bus station) at the northern end of the bus lane was meant to open as well, but it encountered construction delays.[18][19] The Busport eventually opened on 30 November 1991.[20][21]

In March 1999, the South West Metropolitan Railway Master Plan was approved by the state government. It was to follow a route branching off the Armadale line before joining the Kwinana Freeway at Jandakot, bypassing the Kwinana Freeway from Perth to Jandakot. A busway for this section was planned instead.[22] Detailed plans for the bus transitway from the Narrows Bridge to the Murdoch Park 'n' Ride at South Street were unveiled in October 1999. The bus transitway was to be within the median of the Kwinana Freeway and separated from general traffic by concrete barriers, unlike the existing one-way bus lane. A bus station at Canning Highway was to be built to facilitate transfers from buses along Canning Highway to buses along the freeway bus transitway. A bus off-ramp was to be built to complement the bus on-ramp and the bridge carrying Canning Highway over the freeway was to be widened to accommodate the bus station.[23][24]

A joint venture between Henry Walker Eltin and Clough Engineering were announced as the preferred tenderer in June 2000[25] and awarded the $34 million contract for the design and construction of stage one of the bus transitway in August 2000. This stage included the Canning Bridge bus station and transitway from Canning Highway to the Narrows Bridge, a distance of 5.9 kilometres (3.7 mi). Work was scheduled to begin the following month.[26][27]

 
The lower level as a bus station, July 2005

Following the election of a Labor government, in July 2001, the state government announced that the proposed South West Metropolitan Railway would be rerouted via the Kwinana Freeway between Jandakot and Perth.[28][29] Construction continued on the bus transitway though, as its concrete barriers and right-of-way would be used by the railway. By that point, only $4 million of the project's budget had not been spent.[30] The bus station opened on 11 February 2002 as Canning Bridge bus station, less than a week after the bus transitway opened.[31][32][33] The bus station was credited with saving commute time for students at Curtin University and Murdoch University, with passengers no longer needing to travel to the City Busport to transfer.[32]

Conversion to train station

edit

A new master plan for the South West Metropolitan Railway, also known as the Mandurah line, was released in August 2002.[34][35] It said the second stage of the bus transitway to Murdoch would not go ahead.[36] Bus services from along the Kwinana Freeway from Canning Bridge to the City Busport were planned to be kept, to prevent people from having to transfer from bus to train at Canning Bridge. This was unlike the bus routes further south, which were planned to be curtailed to terminate at the various bus-train interchanges.[37][38] Widening the Kwinana Freeway from Canning Bridge to the Narrows Bridge to include new bus lanes was considered,[39] but that was ruled out in January 2002 as it would encroach on the Swan River.[40] Instead, bus lanes on a limited section of the freeway from Judd Street on-ramp to the Narrows Bridge would be created, as this was the most congested section.[41] The Canning Bridge bus station was planned to be retained and converted to a train-bus transfer station.[42] The bus on-ramp was planned to be demolished and replaced by a new on-ramp.[41]

The construction of the Southern Suburbs Railway was divided into eight packages. Package D was for the construction of Canning Bridge, Bull Creek, and Murdoch stations. Package E was for the roadworks on the Kwinana Freeway, which included the replacement of the bus on-ramp at Canning Bridge station.[43][44] Leighton Contractors was selected as the preferred proponent for Package A in October 2003[45][46] and the contract was awarded in December 2003 for $99.1 million.[47] Expressions of interest were called for Package D in September 2003.[48][49] The Package D contract was awarded to John Holland Group for $32 million in November 2004.[50][51][52] Canning Bridge station was designed by Woodhead International Architects.[5]

 
The bus on-ramp, December 2022

As the bus on-ramp bridge was in the way of the proposed railway, it was planned to be demolished and replaced by a new bridge. To save costs, the contractor proposed moving the 1,560-tonne (1,720-ton), 124-metre-long (407 ft) bridge superstructure 9.5 metres (31 ft) south-west instead.[53][54] First, four temporary concrete blade walls were constructed as temporary supports. The bridge was jacked up so that steel cradles could be attached to its underside, which were to rest on bearings on the concrete walls, similar to the incremental launch technique.[55] The bus on-ramp was closed from August to December 2005, with buses diverted to the off-ramp, which was temporarily converted to an on-ramp.[56] The bridge relocation took place in the second half of 2005.[57] A hydraulic jacking system was used to push the bridge along the concrete walls to its new position, which took five to seven hours, all while the freeway remained open to traffic.[58][59]

From 29 January 2006, the lower level of the Canning Bridge bus station was closed for conversion to rail.[60] From 26 February 2006, the bus station was fully closed to reduce confusion.[61] Construction on the station by John Holland began in March 2006.[62] The platform height was raised to reach the height of the trains and the connection between platform level and bridge level was improved.[63] Other modifications included extra bus shelters at the bus interchange level.[5] Canning Bridge station reached practical completion in June 2007, alongside the other two Package D stations.[64] The Mandurah line opened on 23 December 2007.[65][66] By March 2008, Canning Bridge station had exceeded patronage expectations by 54 percent.[67] Extra bus services were soon added in response.[68]

Proposed upgrades

edit

A report released by the Auditor-General in November 2017 found that the six bus routes along the freeway between Canning Bridge and Elizabeth Quay should be reduced or cancelled, which would save $4 million per year. The Public Transport Authority said that making passengers transfer to a train at Canning Bridge station would be less convenient which could reduce patronage, and that the bus infrastructure at the station would have to be upgraded to allow for terminating buses.[69][70][71]

In February 2019, Infrastructure Australia added the "Canning Bridge crossing capacity and interchange" to its Infrastructure Priority List, noting that the interchange was causing congestion, pedestrian and cyclist access was poor, there were no drop-off facilities, and no toilets.[72][73][74]

As part of Metronet, the bus interchange at Canning Bridge station will be upgraded. Current plans involve a new bridge parallel and to the north of the existing bridge, to be used by buses. The new interchange will have twelve bus stands and allow for buses to turn around. Grade separated pedestrian access will be implemented. The existing bus on- and off-ramps will be connected to the new bridge.[75] In December 2021, the federal government committed an additional $25 million towards the upgrades, which facilitated a new pedestrian bridge from Davilak Street to access the station from the south.[76] There will also be changes to the interchange, including relocating the northbound on-ramp and installing ramp metering.[75] State government funding was first announced in the May 2022 budget.[77] Current funding includes $150 million for the bus interchange, $30 million for the new entrance from the south, and $20 million for the ramp metering. Contract procurement is scheduled to happen in 2025–26 and construction is scheduled to commenced before the end of 2026.[75]

Services

edit
 
A Transperth B-series train at Canning Bridge station

Canning Bridge station is served by Mandurah line trains, which travel from Mandurah station in the south to Perth Underground station in the north, continuing north from there as the Yanchep line.[4] These services are operated by the Public Transport Authority.[78] During peak hour, trains stop at Canning Bridge station every five minutes, with roughly half of those services terminating or commencing at Cockburn Central station. Off peak and on weekends and public holidays, trains are every fifteen minutes. At night, trains are half-hourly or hourly. The journey to Perth Underground station takes seven minutes.[4]

Patronage projections for Canning Bridge station from the 2002 master plan were for 970 boardings per day, by far the least of any Mandurah line station.[79] The master plan said that patronage could be higher if the Raffles Hotel site were redeveloped and bus connections to Curtin University were created.[80] The station had 932,132 passengers in the 2013–14 financial year, making it the third-least used station on the Mandurah line.[81] In March 2018, there were approximately 4,000 boardings per weekday, of whom 2,800 transferred from buses.[74]

 
Bus interchange on Canning Highway

There are ten regular bus routes which service Canning Bridge station.[6] Route 100 and 101 go to Curtin University, with route 100 continuing past there to Cannington station.[82] Those two routes are jointly funded by Curtin University and the Public Transport Authority.[83][84][85] Running along the Kwinana Freeway to Elizabeth Quay bus station via the bus on-ramp are routes 111, 114, 115, 158, and 160.[6] In the other direction, route 111 goes to Fremantle station via Canning Highway,[86] route 114 goes to Lake Coogee,[87] route 115 goes to Hamilton Hill,[88] route 158 goes to Fremantle station via Bicton and Attadale,[86] and route 160 goes to Fremantle station via Willagee and Booragoon.[89] Running along Canning Highway without entering the freeway are routes 148, 510 and 910.[6] Route 148 runs from Como to Fremantle station via Bicton and Attadale.[86] Route 510 runs to Murdoch station.[6] Route 910 runs from the Perth CBD to Fremantle station via Canning Highway.[90] Additionally, there are two bus routes that run during events at Perth Stadium: 658, which runs from Perth Stadium to Hamilton Hill,[91] and 659, which runs from Perth Stadium to Fremantle.[92] Rail replacement bus services operate as route 909.[6]

References

edit
  1. ^ "Public Transport Authority: Railway System: April 2019" (PDF). Public Transport Authority. Archived (PDF) from the original on 24 July 2019. Retrieved 19 October 2024.
  2. ^ a b "Canning Bridge Station". Transperth. Archived from the original on 10 April 2024. Retrieved 19 October 2024.
  3. ^ "Manual – Rail Access" (PDF). Public Transport Authority. p. 9. Archived (PDF) from the original on 7 October 2024. Retrieved 19 October 2024.
  4. ^ a b c "Mandurah Line Train Timetable" (PDF). Transperth. 15 July 2024. Archived (PDF) from the original on 16 August 2024. Retrieved 19 October 2024.
  5. ^ a b c d Longhurst 2008, p. 305.
  6. ^ a b c d e f "Canning Bridge Station Map" (PDF). Transperth. 20 November 2023. Archived (PDF) from the original on 22 July 2024. Retrieved 19 October 2024.
  7. ^ "Canning Bridge Station Access Plan" (PDF). New MetroRail. Archived from the original (PDF) on 28 September 2007.
  8. ^ "No toilet at station". Melville Times. Community Newspaper Group. 6 March 2007. p. 2.
  9. ^ "Shortcut to station risky". Melville Times. Community Newspaper Group. 5 August 2008. p. 3.
  10. ^ Watson, de Jong & Radzivanas 1990, pp. 137–138.
  11. ^ Edmonds 1997, pp. 360–361.
  12. ^ Main Roads Department (1987). Annual Report 1986–1987. p. 31.
  13. ^ Watson, de Jong & Radzivanas 1990, p. 138.
  14. ^ a b Edmonds 1997, p. 361.
  15. ^ Grieve & Pressley 1990, p. 117.
  16. ^ Grieve & Pressley 1990, p. 133.
  17. ^ Grieve & Pressley 1990, p. 128.
  18. ^ "Bus lane overtakes the morning crawl". Daily News. 18 November 1989. p. 8.
  19. ^ Watson, de Jong & Radzivanas 1990, p. 149.
  20. ^ "Bus depot launch postponed again". The West Australian. 16 October 1991. p. 64.
  21. ^ Waddacor, Gill (5 December 1991). "Busport debut fails to impress". The West Australian. p. 30.
  22. ^ Perth Urban Rail Development Project – Supplementary Master Plan 2002, pp. 1–2.
  23. ^ "Details for a two-way dedicated bus transitway in the Kwinana Freeway median unveiled". Media Statements. 21 October 1999. Retrieved 19 October 2024.
  24. ^ "Kwinana Freeway Bus Transitway". Clough. Archived from the original on 9 December 2022. Retrieved 19 October 2024.
  25. ^ "Bus transit way to 'revolutionise' commuter travel from southern suburbs". Media Statements. 28 June 2000. Retrieved 19 October 2024.
  26. ^ "Work set to start in September on $34 million Kwinana Freeway bus transitway". Media Statements. 28 August 2000. Retrieved 19 October 2024.
  27. ^ Robb, Trevor (29 August 2000). "Minister touts new bus plan". The West Australian. p. 11.
  28. ^ "Gallop Government unveils vision for faster rail link to Mandurah". Media Statements. 16 July 2001. Retrieved 19 October 2024.
  29. ^ Robb, Trevor (17 July 2001). "Rail Switch – New train link across city foreshore". The West Australian. p. 1.
  30. ^ Clery, Daniel (13 August 2001). "MacTiernan denies waste over freeway bus lanes". The West Australian. p. 26.
  31. ^ "Freeway bus lanes open on Monday". Media Statements. 10 February 2002. Retrieved 18 October 2024.
  32. ^ a b Cowan, Sean (14 February 2002). "Smooth bus ride for freeway passengers". The West Australian. p. 10.
  33. ^ "Busway caps intense road construction program". Builder. April–May 2002. pp. 63–64.
  34. ^ "Master Plan shows new line a winner". Media Statements. 13 August 2002. Retrieved 19 October 2024.
  35. ^ Robb, Trevor (14 August 2002). "ALP claims win on freeway line". The West Australian. p. 4.
  36. ^ Perth Urban Rail Development Project – Supplementary Master Plan 2002, p. 5.
  37. ^ Perth Urban Rail Development Project – Supplementary Master Plan 2002, pp. 126–127.
  38. ^ "Conceptual bus network and proposed service levels". Transperth. Archived from the original on 19 June 2012.
  39. ^ Robb, Trevor (16 August 2001). "Freeway bus lane may stay: Pendal". The West Australian. p. 30.
  40. ^ "Kwinana Freeway will not be widened". Media Statements. 3 January 2002. Retrieved 19 October 2024.
  41. ^ a b Perth Urban Rail Development Project – Supplementary Master Plan 2002, p. 129.
  42. ^ "Completing Canning Bridge interchange is best transport option". Media Statements. 9 January 2002. Retrieved 19 October 2024.
  43. ^ Perth Urban Rail Development Project – Supplementary Master Plan 2002, p. 140.
  44. ^ Longhurst 2008, pp. 305, 307.
  45. ^ "Leighton selected as preferred proponent for rail contract". Media Statements. 10 October 2003. Retrieved 19 October 2024.
  46. ^ "Leighton gets rail line job". The West Australian. 11 October 2003. p. 40.
  47. ^ "Green light for massive rail project". Media Statements. 16 December 2003. Archived from the original on 15 June 2024. Retrieved 19 October 2024.
  48. ^ "Construction interest sought for about $80m worth of stations on Perth to Mandurah railway". Media Statements. 2 September 2003. Archived from the original on 12 August 2024. Retrieved 8 August 2024.
  49. ^ "Builders sought for new stations". The West Australian. 3 September 2003. p. 17.
  50. ^ "Contract awarded for first three Southern Suburbs Railway stations". Media Statements. 6 November 2004. Archived from the original on 12 August 2024. Retrieved 8 August 2024.
  51. ^ "John Holland secures Perth-to-Mandurah contract". ABC News. 7 November 2004. Archived from the original on 12 August 2024. Retrieved 8 August 2024.
  52. ^ "John Holland wins $32m rail deal". Business News. 9 November 2004. Retrieved 8 August 2024.
  53. ^ MacKinlay 2006, p. 1.
  54. ^ Longhurst 2008, pp. 148, 307.
  55. ^ MacKinlay 2006, pp. 7–8.
  56. ^ "What's happening at the Canning Bridge Bus Station?". New MetroRail. Archived from the original on 29 August 2007.
  57. ^ "OnTrack: Issue 11" (PDF). New MetroRail. December 2005. p. 5. Archived from the original (PDF) on 28 August 2007.
  58. ^ MacKinlay 2006, pp. 8–9.
  59. ^ Longhurst 2008, p. 148.
  60. ^ "Closure of Canning Bridge platforms". Transperth. 29 January 2006. Archived from the original on 8 February 2006.
  61. ^ "Transperth acts on Canning Bridge confusion". Public Transport Authority. 23 February 2006. Archived from the original on 10 June 2024. Retrieved 18 October 2024.
  62. ^ "OnTrack: Issue 12" (PDF). New MetroRail. April 2006. p. 5. Archived from the original (PDF) on 28 August 2007.
  63. ^ "Canning Bridge". New MetroRail. Archived from the original on 28 September 2007.
  64. ^ "City tunnel project completion announced". Media Statements. 8 September 2007. Archived from the original on 26 October 2023. Retrieved 8 August 2024.
  65. ^ "All aboard as the new Perth-to-Mandurah Railway begins". Media Statements. 23 December 2007. Retrieved 18 October 2024.
  66. ^ "New train line 'running smoothly'". ABC News. 24 December 2007. Archived from the original on 29 October 2016. Retrieved 18 October 2024.
  67. ^ "Patronage figures soar on Perth-to-Mandurah railway". Media Statements. 10 March 2008. Retrieved 18 October 2024.
  68. ^ "Extra peak-time buses to Curtin". Melville Times. Community Newspaper Group. 27 May 2008. p. 5.
  69. ^ "Planning and Management of Bus Services" (PDF). Office of the Auditor General. November 2017. p. 18. Archived (PDF) from the original on 30 March 2019. Retrieved 18 October 2024.
  70. ^ Mayes, Andrea (29 November 2017). "Transperth bus use decline will see Perth public transport costs soar, auditor-general finds". ABC News. Archived from the original on 16 October 2022. Retrieved 19 October 2024.
  71. ^ McNeill, Heather (29 November 2017). "'Cut freeway bus routes': report reveals Perth's bus network 'unsustainable'". WAtoday. Archived from the original on 11 March 2019. Retrieved 18 October 2024.
  72. ^ "Infrastructure Australia's priority list recognises WA projects". Media Statements. 14 February 2019. Retrieved 19 October 2024.
  73. ^ Young, Emma (14 February 2019). "Fremantle Traffic Bridge, Canning Bridge now national infrastructure priorities". WAtoday. Retrieved 19 October 2024.
  74. ^ a b "Infrastructure Priority List – Australian Infrastructure Plan – Project and Initiative Summaries" (PDF). Infrastructure Australia. February 2019. p. 127. Archived (PDF) from the original on 26 April 2023. Retrieved 19 October 2024.
  75. ^ a b c "Canning Bridge Bus Interchange". Metronet. Archived from the original on 9 October 2024. Retrieved 18 October 2024.
  76. ^ Dietsch, Jake (30 December 2021). "Canning Bridge upgrades get $25 million boost, with new pedestrian access bridge to the station now included". PerthNow. Archived from the original on 28 January 2022. Retrieved 19 October 2024.
  77. ^ "METRONET powering ahead with record $6 billion investment". Media Statements. 12 May 2022. Retrieved 19 October 2024.
  78. ^ "Transperth". Public Transport Authority. Archived from the original on 5 October 2021. Retrieved 19 October 2024.
  79. ^ Perth Urban Rail Development Project – Supplementary Master Plan 2002, p. 21.
  80. ^ Perth Urban Rail Development Project – Supplementary Master Plan 2002, pp. 50–51.
  81. ^ "Question On Notice No. 4245 asked in the Legislative Assembly on 25 June 2015 by Mr M. Mcgowan". Parliament of Western Australia. Archived from the original on 9 December 2021. Retrieved 25 July 2022.
  82. ^ "Bus Timetable 20" (PDF). Transperth. 15 July 2024. Archived (PDF) from the original on 31 August 2024. Retrieved 19 October 2024.
  83. ^ "Bus to link Curtin University of Technology with new Canning Bridge station". Media Statements. 18 December 2007. Retrieved 19 October 2024.
  84. ^ "Bus links Curtin to train line". Melville Times. Community Newspaper Group. 8 January 2008. p. 11.
  85. ^ "Integrated Transport & Movement Plan" (PDF). Curtin University. January 2017. p. 37. Archived (PDF) from the original on 16 February 2024. Retrieved 19 October 2024.
  86. ^ a b c "Bus Timetable 39" (PDF). Transperth. 15 July 2024. Archived (PDF) from the original on 19 September 2024. Retrieved 19 October 2024.
  87. ^ "Bus Timetable 118" (PDF). Transperth. 6 October 2024. Archived (PDF) from the original on 8 October 2024. Retrieved 19 October 2024.
  88. ^ "Bus Timetable 46" (PDF). Transperth. 6 October 2024. Retrieved 19 October 2024.
  89. ^ "Bus Timetable 34" (PDF). Transperth. 6 October 2024. Retrieved 19 October 2024.
  90. ^ "Bus Timetable 207" (PDF). Transperth. 6 October 2024. Retrieved 19 October 2024.
  91. ^ "Route 658". Transperth. Archived from the original on 22 December 2022. Retrieved 19 October 2024.
  92. ^ "Route 659". Transperth. Archived from the original on 15 July 2024. Retrieved 19 October 2024.

Sources

edit
edit