This article needs additional citations for verification. (August 2008) |
06°10′56.84″S 106°47′35.01″E / 6.1824556°S 106.7930583°E
Tangerang–Merak Toll Road | |
---|---|
Jalan Tol Tangerang–Merak | |
Tamer Toll Road | |
Route information | |
Part of AH2 | |
Maintained by PT Marga Mandalasakti (Astra Tol Nusantara) | |
Length | 72 km (45 mi) |
Existed | 1992–present |
Major junctions | |
East end | AH2 Jakarta–Tangerang Toll Road (Bitung junction) |
West end | Port of Merak |
Location | |
Country | Indonesia |
Major cities | |
Highway system | |
The Tangerang–Merak Toll Road (shortened to Tamer Toll Road), also known as the Banten Highway, is a toll road that connects Tangerang with the Port of Merak in the province of Banten, Indonesia. Being a part of the Jakarta–Merak Toll Road, the toll road passes through Cikupa, Balaraja, Kragilan, Ciujung, Serang, and Cilegon, before ending at Merak.[1]
Exits
editThis article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Banten | Cikupa, Tangerang Regency | 31.63 | 19.65 | Cikupa Toll Gate (Main toll gate/Border between Jakarta-Tangerang and Tangerang-Merak) | |||
35.78 | 22.23 | 35 | Balaraja Timur Toll Gate | ||||
Balaraja, Tangerang Regency | 39.11 | 24.30 | 39 | Balaraja Barat Toll Gate | |||
Cikande, Serang Regency | 52.33 | 32.52 | 52 | Cikande Toll Gate |
| ||
Kragilan, Serang Regency | 59.95 | 37.25 | 60 | Ciujung Toll Gate |
| ||
Ciruas, Serang Regency | 64.10 | 39.83 | 64 | Walantaka Interchange | |||
Cipocok Jaya, Serang | 72.21 | 44.87 | 72 | Serang Timur Toll Gate | |||
Taktakan, Serang | 77.62 | 48.23 | 77 | Serang Barat Toll Gate |
| ||
Kramatwatu, Serang Regency | 87.36 | 54.28 | 87 | Cilegon Timur Toll Gate |
| ||
Purwakarta, Cilegon | 95.19 | 59.15 | 95 | Cilegon Barat Toll Gate | Westbound exit, eastbound entry only | ||
Grogol, Cilegon | 98.48 | 61.19 | 98 | Merak Toll Gate | Merak | Westernmost toll gate/exit in Java, Western terminus of Toll Route 1 | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Elevated toll road section
editTo overcome floods of Ciujung River in kilometer 57 to 59 which happened in 2012 and 2013, the operator has planned to elevated the toll road certain section by 2.7 meter height above the existing toll road with prediction cost Rp.300 billion ($25 million) for 2.5 kilometer elevated toll road as Prof. Dr. Ir. Soedijatmo Toll Road (Soekarno–Hatta Toll Road).[2]
See also
editReferences
edit- ^ Prabowo, Dani (22 June 2017). Alexander, Hilda B (ed.). "Melintas Tol Tangerang-Merak, Perhatikan Fasilitas Ini" [Crossing the Tangerang-Merak Toll Road, Pay Attention to these Facilities]. properti.kompas.com (in Indonesian). Kompas.com. Retrieved 6 October 2022.
- ^ "Merak toll road to get new, elevated section". March 26, 2014.