Jump to content

Bellevue Transit Center

Coordinates: 47°36′55″N 122°11′31″W / 47.61528°N 122.19194°W / 47.61528; -122.19194
From Wikipedia, the free encyclopedia
 58  Bellevue Downtown
Link light rail station
View of Bellevue Transit Center from 108th Ave NE.
General information
Location594 110th Avenue Northeast
Bellevue, Washington
United States
Coordinates47°36′55″N 122°11′31″W / 47.61528°N 122.19194°W / 47.61528; -122.19194
Train operatorsSound Transit
Bus routes20
Bus stands12
Bus operatorsKing County Metro (RapidRide)
Sound Transit Express
Construction
Bicycle facilitiesBicycle lockers and racks
AccessibleYes
History
Opened1985 (buses)
April 27, 2024 (light rail)
Rebuilt2002, 2017–2024
Services
Preceding station Sound Transit Following station
Link
East Main 2 Line
Starter Line
Wilburton
Future service
East Main 2 Line
(2025)
Wilburton
Location
Map

Bellevue Transit Center (BTC) is a bus station and light rail station in Bellevue, Washington, a suburb of Seattle. It is the main transit hub for the Eastside of King County, serving 20 routes from King County Metro and Sound Transit Express. The transit center is the western terminus of the RapidRide B Line, which runs east to Redmond.

A Link light rail station, named Bellevue Downtown, was built to the east of the transit center near the Bellevue City Hall. The station is at the east portal of the Downtown Bellevue tunnel and has two entrances at 110th and 112th avenues. It opened in 2024 as part of the initial starter segment of the 2 Line.

Location

[edit]

The bus platforms for Bellevue Transit Center are located on one block of Northeast 6th Street between Northeast 108th Street and Northeast 110th Street in Downtown Bellevue.[1]

History

[edit]
Link light rail station under construction in 2018

The original transit center in downtown Bellevue was opened in 1985, at a cost of $5 million, consisting of 6 bus bays on Northeast 6th Street.[2] It was preceded by a temporary transit hub near the Puget Power Building established in 1982.[3]

A new, $21 million transit center was built on the site in 2002, adding additional bus bays and modernizing the facility as part of the Sound Transit Express program.[4] The following year, additional amenities were added to the transit center as part of the project's second phase; a customer service kiosk, bicycle facilities, a public restroom, and a police station were added.[5] A city-funded travel assistance service was based out of the facility beginning in 2008.[6] The center closed in December 2020 for light rail construction.[7]

A direct access ramp from Northeast 6th Street to Interstate 405 for buses and carpools was also opened in 2004.[8]

Light rail

[edit]

Bellevue Transit Center was selected as the site of a light rail station as part of the East Link Extension, funded by a regional vote in 2008. Construction began in 2017.[9] The station, to be named Bellevue Downtown station,[10] would be located to the east of the current transit center, along Northeast 6th Street between 110th and 112th avenues on the north side of the Bellevue City Hall. It would be at the east end of a tunnel under downtown Bellevue and the west end of an elevated bridge across Interstate 405 leading towards Wilburton station. The station would have two entrances, on 110th and 112th, and comprise two side platforms.[9]

The ballot measure that approved East Link in 2008 only included money for an at-grade alignment in Downtown Bellevue, leaving a $100 million to $200 million funding shortfall for a tunneled option that would have to be funded by an external source.[11] The city of Bellevue agreed to fund the remainder, but the placement of the station remained controversial as leaders were split between a tunneled station closer to the city center, a surface alignment, and an elevated station along I-405.[12] The final routing was approved in 2013 by the Bellevue City Council and Sound Transit, choosing an open-air station that would save $19 to $33 million compared to one inside the tunnel.[13]

The station opened on April 27, 2024, as part of the initial segment of the 2 Line between South Bellevue and Redmond Technology stations.[14][15]

References

[edit]
  1. ^ "Park & Ride Information - King County Metro Transit". metro.kingcounty.gov. Retrieved 2016-04-18.
  2. ^ Hayes, Janice (October 23, 1985). "Transit center getting cold shoulder". The Seattle Times. p. H1.
  3. ^ "Metro introducing Eastside transit center". The Seattle Times. February 17, 1982. p. F5.
  4. ^ "Senator Patty Murray Dedicates New Bellevue Transit Center" (Press release). Sound Transit. October 22, 2002. Retrieved August 2, 2016.
  5. ^ "City's updated transit center back tomorrow". The Seattle Times. September 27, 2002. p. B3.
  6. ^ "Commuter Connection opening at Bellevue Transit Center". Bellevue Reporter. September 9, 2008. Retrieved September 30, 2024.
  7. ^ "Bellevue Transit Center Restroom Closure". Sound Transit. December 16, 2020. Retrieved September 30, 2024.
  8. ^ Singer, Natalie (November 16, 2004). "I-405 ramp to funnel traffic into Bellevue - Car-pool lanes get direct access". The Seattle Times. p. B2.
  9. ^ a b "Bellevue Downtown Station". City of Bellevue. Retrieved August 6, 2016.
  10. ^ "Sound Transit Motion No. M2015-58: Adopting Station Names for East Link Extension" (PDF). Sound Transit. June 25, 2015. Retrieved August 6, 2016.
  11. ^ Ervin, Keith (July 28, 2011). "Sound Transit approves East Link light-rail route". The Seattle Times. Retrieved August 7, 2016.
  12. ^ Lindblom, Mike (February 8, 2010). "Light-rail 'vision' elevated track would run along I-405". The Seattle Times. Retrieved August 7, 2016.
  13. ^ Lindblom, Mike (April 25, 2013). "Sound Transit signs off on Bellevue's light-rail route". The Seattle Times. Retrieved August 2, 2016.
  14. ^ Lindblom, Mike; Kroman, David (April 27, 2024). "Eastside light rail line opens as huge crowds try out the ride". The Seattle Times. Retrieved April 27, 2024.
  15. ^ Belman, Brooke (August 24, 2023). "Get ready for new Link service on the Eastside next spring". The Platform. Sound Transit. Retrieved August 24, 2023.
[edit]