Centenary Building
This article needs additional citations for verification. (March 2023) |
Centenary Building | |
---|---|
General information | |
Town or city | Salford, Greater Manchester |
Country | England |
Construction started | June 1994 |
Completed | December 1995 |
Cost | £3.2m |
Client | University of Salford |
Design and construction | |
Architect(s) | Stephen Hodder |
Structural engineer | AMEC |
The Centenary Building is a building at the University of Salford in Greater Manchester, England. It was designed by the architect Stephen Hodder, completed in December 1995 and opened in 1996.
The building won the RIBA Award and inaugural Stirling Prize in 1996,[1] and the Civic Trust Award in 1998.[2]
Site and brief
[edit]The site is situated on the edge of the city of Manchester and lies within the campus of the University of Salford.
The brief for the building came from the predecessor of the University of Salford towards the end of 1994 and required a building which was a "fusion of design and technology" to house the Spatial, Graphic and Industrial Design Department of the university.[3]
Hodder had 11 weeks to finish the design stage and begin development on site in order to ensure the European Union grant was eligible.[4]
Architecture
[edit]The building consists of two separate glazed structures set as a frame to an informal galleried atrium.
The service towers, studio and seminar accommodation are housed within a four-storey orthogonal block on the "City side" of the development.
The tutorial accommodation and technology suites are situated in a free-form three-storey block newly defined courtyard. The connection between the two blocks is a raised street within which all horizontal circulation is contained in galleries.
Working details of the escape stair is enclosed in glass block screen. Other materials include stainless steel cladding and concrete.
Accommodation includes seminar rooms, video-editing suites, lecture halls.[5]
The end result is a building which looks strikingly modern, but which has significant usability problems. As the design features visible movement of people, the environment is noisy and the full-height glass walls to offices and study spaces offers little in the way of privacy, A large number of rooms have no direct external windows, relying instead on borrowed light from the central atrium. The subsequent lack of ventilation and reliance on fluorescent lighting for the whole of the day is not conducive to good health. Outside of rooms, all spaces are designed for transit and thus there are no informal 'social' areas for people to gather and talk. On a more mundane level, there are no kitchen areas and the only taps delivering drinking water are situated in the toilets. None of the toilets have external windows, and thus are usually less than pleasant spaces to visit. Central heating is under-specified which, when coupled with the already mentioned windows and ventilation issues, leaves the building cold in Winter and unbearably hot in Summer.[citation needed]
Engineering
[edit]The construction of the building was completed relatively speedily in comparison to other similar buildings in Britain and to a built to a tight financial budget in order that it could take advantage of European Union grant funding.[citation needed]
References
[edit]- ^ "First Stirling Prize winner could become primary school". Architects Journal. 31 August 2018. Retrieved 31 March 2023.
- ^ "Centenary Building - University of Salford". Civic Trust Awards. Retrieved 31 March 2023.
- ^ "Centenary Building, Salford". Hodder and Partners. Retrieved 31 March 2023.
- ^ "Practice History". Buildings R Us. Retrieved 31 March 2023.
- ^ "HE Estates website : Compendium of Good Practice : Capital projects : Value of design : University Challenge : Projects : Hodder Associates". HE Estates. Archived from the original on 8 December 2007. Retrieved 22 May 2022.