Enbridge Pipeline System
This article needs additional citations for verification. (July 2010) |
Enbridge System Canadian Mainline | |
---|---|
Location | |
Country | Canada |
General direction | north–south–east |
From | Edmonton, Alberta |
Passes through | Gretna, Manitoba Sarnia, Ontario |
To | Montreal, Quebec |
General information | |
Type | crude oil, dilbit |
Owner | Enbridge Inc. |
Technical information | |
Length | 2,306 km (1,433 mi) |
Lakehead System U.S. Mainline | |
---|---|
Location | |
Country | United States |
General direction | north–south–east |
From | Neche, North Dakota |
To | Chicago, Illinois |
General information | |
Type | crude oil |
Owner | Enbridge Energy Partners, L.P. |
Technical information | |
Length | 3,057 km (1,900 mi) |
The Enbridge Pipeline System is an oil pipeline system which transports crude oil and dilbit from Canada to the United States. The system exceeds 5,000 kilometres (3,100 mi) in length including multiple paths. More than 3,000 kilometres (1,900 mi) of the system is in the United States while the rest is in Canada and serves the Athabasca oil sands production facilities. Main parts of the system are 2,306-kilometre-long (1,433 mi) Canadian Mainline[1] and 3,057-kilometre-long (1,900 mi) Lakehead System (U.S. Mainline).[2] On average, it delivers 1.4 million barrels per day (220×10 3 m3/d) of crude oil and other products to the major oil refineries in the American Midwest and the Canadian province of Ontario. The Canadian portion is owned by Enbridge, while the U.S. portion is partly owned by that company through Enbridge Energy Partners, LP, formerly known as Lakehead Pipe Line Partners and Lakehead Pipe Line Company.
Background
[edit]The first portion of the pipeline was built over the course of 150 days in 1950 by a 1,500-man labor force. It crossed approximately 1,600 kilometres (990 mi) from Redwater, Alberta, through Saskatchewan, Manitoba, North Dakota, and Minnesota, to the Great Lakes seaport of Superior, Wisconsin. At the same time, four oil tankers were constructed to carry the crude from Superior to oil refineries in Sarnia, Ontario. Oil first entered the pipe on August 25, 1950, and the first tanker, Imperial Leduc, was launched on November 4. Other tankers that followed were, Imperial Redwater, Imperial Woodbend, and B.A. Peerless.[3][4]
Because the lakes froze in the winter, preventing tanker traffic, the decision was soon made to expand the pipeline all the way to Sarnia. In May 1953, contracts were awarded and construction began. At 2,840 kilometres (1,760 mi), it became the world's longest pipeline. A major upgrade was undertaken in the 1990s to replace old pipe and expand the system.
Mainline system
[edit]Today, there are two routes that oil can take between Superior and Sarnia. A northern route passes through the upper and lower peninsulas of Michigan before crossing into Ontario, while the southern route circles south of Lake Michigan through Illinois and Indiana before reaching Michigan. There are 59 pumping stations in the pipeline system, and the actual pipes range in diameter from 12 to 48 inches (300 to 1,220 mm).
One major junction point is in Clearbrook, Minnesota where the pipeline connects to the Minnesota Pipeline, which carries crude to the Pine Bend Refinery in Rosemount, Minnesota. The North Dakota Pipeline Company system of pipeline also has a connection in Clearbrook, linking the Mandan Refinery in Mandan, North Dakota. The Murphy Oil refinery in Superior, Wisconsin, is directly linked to the pipeline.
Another point in Lockport, Illinois connects two pipelines to Patoka, Illinois, plus a longer link to Cushing, Oklahoma. A relatively short 56-kilometre (35 mi) link from Stockbridge, Michigan connects to two refineries in the Toledo, Ohio area.
The Mainline system, conventionally divided into the US and Canadian mainlines, consists of 1900 miles of pipeline that run from central Alberta to southern Ontario via the northern US. The system can carry up to 2.5 million barrels of oil per day. Lines 1 through 4 connect Edmonton to Superior, Wisconsin. From there, Line 5 runs through the Upper Peninsula of Michigan and across the straits of Mackinac to cross back into Canada at the St. Clair River. Line 6 runs south through Wisconsin and Illinois to the terminal in Griffith, Indiana, which serves BP Whiting and other Chicago-area clients, and then continues on through northwest Indiana and southern Michigan to rejoin Line 5 at Sarnia, Ontario.
The Mainline system comprises Lines 1, 2, 3, 4, 5, 6, 7, 10, 11, 14, 61, 62, 64, and 67. Pipelines that connect to the system, but are not part of it, include Line 9 (Montreal to Sarnia), Line 17 (Stockbridge to Toledo), and Line 55 (Flanagan to Cushing).
Pipeline | Start | End | Length (miles) | Capacity (m3/day) | Size (inches) | Materials carried | Year created | Remarks | |
---|---|---|---|---|---|---|---|---|---|
Line 1 | Edmonton | Superior, Wisconsin | 1098 | 37600 | 18[5] | Natural gas liquids, refined products, light synthetics | 1950[5] | ||
Line 2 | Line 2A | Edmonton | Cromer | 596 | 70300 | 24 | condensate, light synthetic, sweet crude, light & high sour crude | 1957[5] | |
Line 2B | Cromer | Superior, Wisconsin | 502 | 70300 | 24/26 | ||||
Line 3 | Edmonton[6] | Superior, Wisconsin[6] | 1097[6] | 120830[6] | 34[5][6] | light crudeoil, heavy & sour dilbit[6] | 1967[5] | ||
Line 4 | Edmonton | Superior, Wisconsin | 1098 | 126500 | 36/48[5] | heavy, medium (from Clearbrook only), light sour (from Clearbrook only) | 2002[5] | ||
Line 5 | Superior | Sarnia | 1098 | 126500 | 30 | heavy, medium (from Clearbrook only), light sour crude (from Clearbrook only) | 1953 | Line splits into two when passing under Straits of Mackinac. Volumes not delivered to Sarnia-area refineries are pumped into tanks for reinjection into Line 7. | |
Line 6 | Line 6A | Superior | Griffith | 467 | 106000 | 34 | light synthetic (to Lockport only), sweet crude (to Lockport only), light & high sour, medium, heavy | 1969 | delivery points at Lockport, Mokena and Griffith; deliveries for BP Whiting are pumped into delivery tankage for subsequent transfer to Whiting |
Line 6B | Griffith (Chicago) | Sarnia | 293 | 45000 | 30 | ||||
Line 7 | Sarnia | Westover | 120 | 23900 | 20 | light synthetic, sweet, light & high sour, medium, heavy | 1957[7] | ||
Line 9 | Sarnia | Montreal | 397 | 35770 | 30 | light synthetic, sweet, light & high sour, medium, heavy | 1976[8] | Reversal (originally proposed in 2012) was completed in two stages including an expansion of capacity from 240,000 BPD to 300,000 BPD in 2015[9][10] | |
Line 10 | Westover | Kiantone NY (United Refining) | 91 | 11800 | 12/20 | light synthetic, sweet, light & high sour, medium, heavy | 1962[11] | ||
Line 11 | Westover | Nanticoke (Imperial Oil) | 47 | 18600 | 16/20 | condensate, light synthetic, sweet, light & high sour, medium, heavy | |||
Line 13 (Southern Lights pipeline) | Manhattan (Illinois) | Edmonton | 1588 | 18618 | 20[5] | diluent[5] | 2010[5] | ||
Line 14 | Superior | Mokena | 467 | 50500 | 24 | light synthetic, sweet, light & high sour, medium | |||
Line 64 | Superior | Griffith (Chicago) | |||||||
Line 61 | Superior | Flanagan (near Chicago) | 454 | 63600 | 42 | reinjection to Line 55 to Cushing or Line 62 to Griffith. As of January 2015 permits pending for expansion to volume of 1.2 million barrels per day. | |||
Line 62 | Flanagan | Griffith (Chicago) | 75 | 20700 | 22 | heavy crude | |||
Line 65 | Cromer | Clearbrook, with connection to Minnesota Pipeline and option to send to breakout tankage for reinjection into Line 3, 4, or 2B | 313 | 29500 | 20 | light sour, medium | 2010 | ||
Line 67 (Alberta Clipper pipeline) | Hardisty | Superior, with connection to Minnesota Pipeline at Clearbrook | 999 | 71500 | 36[5] | heavy crude | 2009[5] |
Expansion
[edit]As of 2013 there were expansion plans for the pipeline system which would, if permitted and fully built, provide the capacity to transport an amount of dilbit from the Athabasca oil sands into the United States and the Gulf Coast equal to that of the Keystone Pipeline.[12]
Accidents and incidents
[edit]Largest inland oil spill In U.S. history
[edit]In 1991, Enbridge's Line 3 pipeline spilled 1.7 million gallons of oil in Grand Rapids, Minnesota and the Prairie River, a tributary of the Mississippi River.[13] It was the largest inland spill of oil in U.S. history.[14] Deliberations over construction of a new Line 3 pipeline have drawn resistance from climate justice organizers and Native communities in Minnesota.[15]
Cohasset, MN oil spill
[edit]On July 4, 2002, 252,000 gallons of crude oil spilled into a marsh near Cohasset, Minnesota due to a rupture of Line 4 running from Edmonton, Alberta, Canada, and Superior, Wisconsin.[16] Emergency responders enacted a controlled burn at 4:45pm the next day to prevent the oil from penetrating into any waterways. The cost of remediating the accident was reported around $5.6 million.[16]
Clearbrook Junction, MN, fire
[edit]On November 28, 2007, a large fire erupted during pipeline repair work at the Clearbrook Junction. This fire, described by a spokesperson for the Minnesota Department of Public Safety as a "big fire, not an explosion", killed two workers and caused a $4 per barrel spike in oil prices the following day. The 34-inch (860 mm) pipeline carries crude from Saskatchewan to the Chicago area.[17]
Kalamazoo River oil spill
[edit]On July 26, 2010, 840,000 gallons of dilbit crude oil leaked from the pipeline in Calhoun County, Michigan, spilling into Talmadge Creek that flows into the Kalamazoo River.[18][19] Despite alarms at Edmonton headquarters it took eighteen hours and a report from a Michigan utilities employee before the pipeline company acted to halt the flow finally. Enbridge reached a settlement with the U.S. Department of Justice and Environmental Protection Agency for a total of $177 million in response to the spill, along with an additional spill in Romeoville, Illinois later that year. This settlement included $110 million in spill prevention, $62 million in Clean Water Act violations, and $5.4 million in cleanup costs.[20] In addition, the company was fined $3.7 million by the United States Department of Transportation due to 24 violations in pipeline safety regulation.[21] By 2014, the cost of cleanup to the company totaled to $1.21 billion.[22]
Mackinac Straits Tugboat anchor incident
[edit]In 2018, a tugboat dropped its anchor on the pipeline near the Straits of Mackinac in Michigan, denting the pipe and causing 600 gallons (2,270 liters) of mineral oil to leak from two electric cables.[23]
See also
[edit]- Enbridge
- Enbridge Pipelines
- Enbridge Northern Gateway Pipelines
- List of oil pipelines
- List of oil refineries
- List of pipeline accidents in the United States
- North Dakota Pipeline Company system
Bibliography
[edit]- Enbridge Pipelines Inc. (2011-07-01). "Competitive Toll Settlement" (PDF). Retrieved 2014-03-30.
- Enbridge (2013). "Pipeline System Configuration: Quarter 1, 2013". Archived from the original on 2014-03-31. Retrieved 2014-03-30.
References
[edit]- ^ Enbridge Income Fund. "Our Assets: Overview". Archived from the original on 2018-07-08. Retrieved 2018-07-07.
- ^ Enbridge Energy Limited Partnership. "Liquids Pipelines - Superior Region" (PDF). Archived (PDF) from the original on 2018-07-08. Retrieved 2018-07-07.
- ^ Patrick Lapinski (Spring 2005). The Port's Past: Not Your Classic Mix. Archived 2010-01-09 at the Wayback Machine Duluth Seaway Port Authority Magazine .
- ^ "Imperial Leduc - Great Lakes Vessel HistoryGreat Lakes Vessel History". www.greatlakesvesselhistory.com. Retrieved 2024-03-19.
- ^ a b c d e f g h i j k l "Enbridge Sandpiper & Line 3 Environmental Impact Statement - Wisconsin DNR". dnr.wi.gov. Archived from the original on 2016-11-16. Retrieved 2016-11-15.
- ^ a b c d e f Final Environmental Impact Statement: Enbridge Sandpiper Pipeline and Line 3 Replacement Projects (PDF). Douglas County, WI: Wisconsin Department of Natural Resources. 2016. Archived (PDF) from the original on 2016-11-16. Retrieved 2016-11-15.
- ^ Jessica McDiarmid (2014-01-22). "Ontario pipeline expansion is quietly approved". The Star. Archived from the original on 2014-01-24. Retrieved 2014-03-30.
- ^ "Line 9B Reversal and Line 9 Capacity Expansion Project - Enbridge Inc". Archived from the original on 2018-08-09. Retrieved 2018-08-09.
- ^ Reuters Staff (2012-07-27). "Enbridge bid for partial Line 9 reversal approved". Reuters. Archived from the original on 2018-08-09. Retrieved 2018-08-09.
{{cite news}}
:|author=
has generic name (help) - ^ National Post Wire Services (2015-12-03). "Oil begins to flow through Line 9 today as Enbridge Inc hikes dividend, releases outlook". Financial Post. Archived from the original on 2018-08-09. Retrieved 2018-08-09.
- ^ "The Line 10 Westover Segment Replacement Project". Archived from the original on 2017-03-03. Retrieved 2017-03-03.
- ^ "Map: Another Major Tar Sands Pipeline Seeking U.S. Permit: Canadian energy giant Enbridge is quietly building a 5,000-mile network of new and expanded pipelines that would achieve the same goal as the Keystone". Inside Climate News. June 3, 2013. Archived from the original on June 11, 2013. Retrieved June 4, 2013.
- ^ Nelson, Cody (April 23, 2018). "Line 3 timeline: From construction to present day battles". MPRNews. Archived from the original on June 27, 2018. Retrieved June 28, 2018.
- ^ Kraker, Dan (June 20, 2018). "Rivers of Oil, Episode 2: The largest inland spill". MPRNews. Archived from the original on June 27, 2018. Retrieved June 28, 2018.
- ^ "Minnesota regulators to decide this week on Enbridge Line 3". MPRNews. June 25, 2018. Archived from the original on June 25, 2018. Retrieved June 28, 2018.
- ^ a b National Transportation Safety Board. (2002). Rupture of Enbridge Pipeline and Release of Crude Oil near Cohasset, Minnesota Archived 2020-10-17 at the Wayback Machine. Pipeline Accident Report NTSB/PAR-04/01. Washington, DC: Author.
- ^ Bloomberg News (August 18, 2010). "Enbridge Fined in Fatal Minnesota Accident". The Chron. Archived from the original on 28 October 2013. Retrieved 15 June 2012.
- ^ Klug, Fritz (2010-07-26). "Oil spills into Calhoun County creek that leads to Kalamazoo River". The Kalamazoo Gazette. Archived from the original on 2010-07-30. Retrieved 27 July 2010.
- ^ "EPA Response to Enbridge Spill in Michigan". www.epa.gov. 8 February 2016. Archived from the original on 2016-11-15. Retrieved 2016-11-15.
- ^ "United States, Enbridge Reach $177 Million Settlement After 2010 Oil Spills in Michigan and Illinois". www.justice.gov. 20 July 2016. Archived from the original on 2016-11-16. Retrieved 2016-11-15.
- ^ Administration, Department of Transportation's Pipeline and Hazardous Materials Safety. "PHMSA - Hazardous Liquids". www.phmsa.dot.gov. Archived from the original on 2016-11-16. Retrieved 2016-11-15.
- ^ Enbridge Energy Partners, L.P. (2014). Form 10-K 2014 Archived 2017-05-10 at the Wayback Machine. Retrieved from SEC EDGAR website http://www.sec.gov/edgar.shtml
- ^ "Enbridge: Damaged oil pipeline was dented less than 1 inch - WOODTV". Archived from the original on 2018-05-21. Retrieved 2018-05-20.
External links
[edit]- Enbridge pipelines
- Oil pipelines in Alberta
- Oil pipelines in Indiana
- Transport in Manitoba
- Pipelines in Michigan
- Oil pipelines in Minnesota
- Oil pipelines in North Dakota
- Pipelines in Ontario
- Pipelines in Saskatchewan
- Oil pipelines in Wisconsin
- Oil pipelines in Canada
- Crude oil pipelines in the United States
- Energy infrastructure in Illinois
- Enbridge
- Oil spills in Alberta
- Environmental issues in Alberta
- Athabasca oil sands