Jump to content

Fife Circle Line

From Wikipedia, the free encyclopedia

Fife Circle Line
Class 170 approaching Dalmeny from the Forth Bridge
Overview
OwnerNetwork Rail
LocaleEdinburgh
Fife
Scotland
Service
SystemNational Rail
Operator(s)ScotRail
Rolling stock
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Route map

The Fife Circle Line is the local rail service north from Edinburgh. It links towns of south Fife and the coastal towns along the Firth of Forth before heading to Edinburgh.[1] Operationally, the service is not strictly a circle route, but, rather, a point to point service that reverses at the Edinburgh end, and has a large bi-directional balloon loop at the Fife end.

Service

[edit]

The service includes the Edinburgh-Dunfermline stretch of the East Coast Main Line, which includes the world-famous Forth Bridge. On the Fife side, while this main line hugs the coast, the circle is formed by a line from Inverkeithing that loops back round to Kirkcaldy by an inland route via Cowdenbeath through the old Fife coalfield. Narrowly speaking, just this line could be called the Fife Circle.

The current service is actually a combination of two previously separate local routes - Edinburgh to Kirkcaldy and Edinburgh to Cowdenbeath & Cardenden. During the 1970s and 80s British Rail only ran a regular daytime service on the Dunfermline line as far as Cowdenbeath; Lochgelly & Cardenden were only served during the weekday business peaks (as can be seen from Table 242 of the UK All Line timetable of that era), whilst the remainder of the route to Thornton Junction was freight-only (having been closed to passengers in 1969). All local stopping trains on the coast line meanwhile terminated at Kirkcaldy.

On 15 May 1989,[2] BR decided to link the two services together by reopening the eastern end of the old Edinburgh and Northern Railway Dunfermline branch to passenger traffic, and run an 'out & back' service from Edinburgh from the start of the summer timetable, which also saw a new Sunday service being reintroduce over parts of Cardenden section, the first time since 1976.[2][3] East Coast manager, Carol Johnston, said:

"The new Fife Circular opens up the new rail network in Fife and will provide many new journey oppositions for the first time."[2]

Three years later in May 1992, a new station was opened at Glenrothes with Thornton at the northern end of the route, to serve the town of Glenrothes and restore a rail service to Thornton after an absence of 23 years. This is listed in the timetables as the northern terminal of the Fife Circle and is the point at which certain trains terminate - the rest continue back to Edinburgh along the opposite side of the 'circle'.[citation needed] In March 1998, Dalgety Bay opened, and in 2000, a new station was opened in the expanding eastern suburbs of Dunfermline and given the name of Dunfermline Queen Margaret, after the nearby Queen Margaret hospital. Another new station was built on the edge of Edinburgh, called Edinburgh Gateway, and was opened in December 2016 to provide connections by tram to the nearby Edinburgh Airport.[4]

There is a goods line connection from Dunfermline to Stirling via Longannet Power Station that rail campaigners would like to reopen to passengers, as it has already been between Stirling and Alloa.[5] The current line via Longannet and Kincardine was last used by passenger trains in 1930, though a Stirling - Alloa - Dunfermline (Upper) service ran via the Stirling and Dunfermline Railway (now closed east of Alloa) until October 1968. Coal trains that formerly crossed the Forth Bridge en route to Longannet Power Station were rerouted by that line so that the bridge's maximum signalling capacity for trains can be used to increase the local passenger service; Longannet Power Station closed in 2017 and all coal train movements ceased although the site is now being redeveloped by Talgo to build new trains. The line between Alloa and Dunfermline is not currently signalled to passenger-carrying standards. The Fife Circle is a priority for present investment in new rolling stock. Its morning peak services can be notoriously overcrowded.[citation needed]

Service patterns

[edit]

All services are run by ScotRail.[6]

Northbound

[edit]
  • 1tph Edinburgh to Cowdenbeath via Dunfermline City
  • 1tph Edinburgh to Glenrothes with Thornton via Cowdenbeath (continues back to Edinburgh via the coast)
  • 2tph Edinburgh to Glenrothes with Thornton via Kirkcaldy (one continues back to Edinburgh via Dunfermline City, the other terminates at Glenrothes)

Southbound

[edit]
  • 1tph Cowdenbeath to Edinburgh
  • 1tph Glenrothes with Thornton to Edinburgh via Dunfermline City (from Edinburgh via the coast)
  • 2tph Glenrothes with Thornton to Edinburgh via Kirkcaldy (one through from Edinburgh via Cowdenbeath)

In the evening, there are hourly services to Glenrothes via Cowdenbeath and to Kirkcaldy only (some of the latter continue to/from Dundee). Sundays see an hourly service in both directions around the full circle to Glenrothes.

Services were curtailed as an economy during the coronavirus crisis and in the current (2023) timetable only run between Edinburgh and Glenrothes via Dunfermline (one train per hour), the Kirkcaldy side of the Circle being served only by trains between Edinburgh and Dundee.

Some services regularly ran through to/from Newcraighall until 2015, but with the opening of the Borders Railway that September this routing ceased (except for a small number of weekday peak trains).

Stops on the Fife Circle line

[edit]

Edinburgh to Fife

[edit]

Here the main line and loop line divide.

Loop line

[edit]

Main line

[edit]

The two lines join forming a circle.

Future services

[edit]

The east peninsula of Fife beyond Kirkcaldy is not served by railways post-Beeching.[7] At one time a railway ran all the way from Thornton to St Andrews round the coast of Fife. The Beeching Report in fact recommended services continue between Thornton and Leven but these fell victim, like services on other Fife branch lines, to widespread apathy in the post-Beeching era. The devolved Scottish government is backing a branch reopening to Leven, where a new station will be built next to the swimming pool and at the disused power station. This service will begin in 2024. This is to satisfy the long term upward trend of cross-Forth communications in Fife's economy. Along this branch line is Cameron Bridge which serves Windygates and Kennoway, where the line runs close to Scotland's largest distillery and Diageo's main Scottish bottling operations.

The 5 mi (8 km) Leven branch line continued to operate until 2001 supplying coal to Methil Power Station. Trials of freight trains continued at least until 2003. From 2011, a one-mile stretch of the line was reopened for freight services from Earlseat opencast pit to the mainline at Thornton. Levenmouth is now the largest urban area in Scotland unserved by direct rail services (37,500 in Levenmouth excluding the nearby East Neuk where an estimated 8,500 catchment exists). STAG (Scottish Transport Appraisal Guidance) appraisals conducted in 2008 and again in 2015 indicated a positive case.[8][9] A subsequent analysis described the report as not "as robust as it should have been",[10] however further sustainability studies have continued and are ongoing as of 2019.[11]

Supporters of the line argue it would provide better services to support major industrial sites at Fife Energy Park, Methil Docks, the Low Carbon Park (under construction), Diageo, the businesses along the Leven Valley (including Donaldsons) and major retailers in Leven located close to the line.[12] Levenmouth is an area of high deprivation and Fife Council estimates that an hourly train link (using the Fife Circle services) to Edinburgh would increase available job vacancies by 500% since commuting for work would become possible.[13] The plan to re-open the rail link to Leven was approved by the Scottish Government on 8 August 2019.[14]

It has also been proposed to start a Burntisland - Leith ferry crossing in order to spread some of the Fife-Edinburgh traffic. A previous attempt at promoting this ferry service as a commuter route in 1991 failed after 18 months.[15] Leith itself, now Edinburgh's government district, is not served by rail but does have transport links to Waverley station via the Edinburgh tram network.

Electrification

[edit]

The £55 million first phase, to electrify 65 miles (104 km) of Fife Circle track, between Haymarket and Dalmeny, for use by battery electric multiple units, was begun by Scottish Powerlines in June 2022 and is due to be completed by December 2024.[16][17][18] Further phases will electrify the lines between Kinghorn, Thornton, Ladybank and Lochgelly.[19] This will allow the Fife Circle services to be operated by battery electric multiple units whilst minimising capital expenditure on infrastructure, in particular avoiding the major expense of electrifying the Forth Bridge. Complete electrification would be possible at some future date. The partial electrification was due to be completed by December 2025[20] but there has been some slippage in these target dates.[21]

References

[edit]
  1. ^ "Route Specifications: Scotland" (PDF). Network Rail. April 2017. p. 20.
  2. ^ a b c Dunfermline Press: Rail Revolution, P1 Friday 12 May 1989.
  3. ^ "Passenger Train Services over Unusual Lines 1988-9" (PDF). The Branch Line Society. Retrieved 31 October 2019.
  4. ^ "New £41m station opens near Edinburgh". BBC News. 12 December 2016.
  5. ^ "Councillors on track to reopen Dunfermline to Kincardine rail line". Dunfermline Press. 11 February 2010.
  6. ^ "Electronic national rail timetable". Network Rail. Table 242. Retrieved 31 October 2019.{{cite web}}: CS1 maint: location (link)
  7. ^ Keane, Kevin (11 May 2008). "MSP says railway would cost £20m". BBC News. BBC. Retrieved 11 July 2012.
  8. ^ Levenmouth sustainable transport study - STAG Part 2 (PDF) (Report). Systra. 9 November 2015.
  9. ^ "Levenmouth Rail Campaign". Railfuture. Retrieved 31 October 2019.
  10. ^ Warrender, Claire (28 April 2018). "Bid to boost case for reinstating Levenmouth rail link". The Courier.
  11. ^ "Levenmouth Sustainable Transport Study". Transport Scotland. Retrieved 31 October 2019.
  12. ^ "The case for reinstatement". Levenmouth Rail Campaign. Archived from the original on 7 April 2019.
  13. ^ Warrender, Claire (6 March 2017). "Scotland's rail strategy criticised as unfair by Levenmouth campaigners". The Courier.
  14. ^ "Disused Fife rail line to be reopened". BBC News. 8 August 2019.
  15. ^ "Cross Forth Ferry/Hovercraft Progress Update". City of Edinburgh Council. 24 November 2009.
  16. ^ "Green light for £55m Scottish Government investment in decarbonisation | Transport Scotland". www.transport.gov.scot. 2 June 2022. Retrieved 10 June 2022.
  17. ^ "Piling work to get underway to electrify line to Fife". Network Rail Media Centre. 2 June 2022. Retrieved 10 June 2022.
  18. ^ "Piling work to get underway to electrify line to Fife". Network Rail. Archived from the original on 11 June 2022. Retrieved 3 June 2022.
  19. ^ "Four phases of Fife Electrification". Network Rail Media Centre. 1 June 2022. Retrieved 10 June 2022.
  20. ^ "Fife Electrification". Scotland's Railway. Archived from the original on 22 June 2022. Retrieved 3 June 2022.
  21. ^ DEM, David Shirres BSc CEng MIMechE (15 February 2024). "Electrifying Scotland". Rail Engineer. Retrieved 19 February 2024.