Jump to content

Nuclear power in Poland

From Wikipedia, the free encyclopedia
(Redirected from Nuclear energy in Poland)

Nuclear power plants in Poland (view)
 Unfinished
 Planned
 Research reactors
Inside of the Maria reactor core, located in Świerk-Otwock near Warsaw

Poland currently operates a single research reactor, Maria. It has no operational nuclear reactors for power production, but is to start construction of a plant with three Westinghouse AP1000 reactors in 2026 to be completed in 2033-2036,[1] and is also intending to build small modular reactors.

Poland operates a nuclear waste disposal site in Różan, named Krajowe Składowisko Odpadów Promieniotwórczych (National Nuclear Waste Disposal Site) since 1961, where waste from the current and past reactors is being stored, without any incidents throughout its operational history.[2]

Background

[edit]
Poland electricity generation by source

Around 63% of Poland's electricity in 2023[3] was produced by burning hard coal and lignite (of which Poland has the EU's largest reserves). This took place at industrial facilities and large central generating stations such as the 5 GW Bełchatów Power Station. With the need to reduce carbon dioxide emissions for environmental, climate, and economic reasons, the country continues to explore deployment of nuclear reactors for electricity generation and industrial process heat.[4]

National nuclear regulator

[edit]

Nuclear activities in Poland are regulated by the national nuclear regulator Państwowa Agencja Atomistyki (PAA). The PAA is a modern nuclear regulator who is an active member of European and international nuclear regulatory organizations.[5]

International relations

[edit]

Poland is a signatory to all major international treaties regarding nuclear energy, a member state of European Atomic Energy Community, and one of the founding member states of the International Atomic Energy Agency in 1957.[6]

History

[edit]

1980 through 2000

[edit]

In the 1980s, the Żarnowiec Nuclear Power Plant was under construction, but the project was abandoned for a mix of reasons, including questions about the profitability of the enterprise, financing issues, and opposition from environmental activists. In 1990, the Polish government formally ended the project and began to liquidate the construction site.[7]

2000 through 2020

[edit]

A 2006 feasibility study suggested it optimal to build an 11.5 GWe capacity nuclear power plant. However, this proving unaffordable in the immediate future, Poland decided to build a 4.5 GWe nuclear power plant by 2030. In 2007, a draft energy policy proposed a 10 GWe nuclear capacity by 2030 to provide 10% of electricity.[8] The deadline gives an estimated ten years for investment and construction and five years of public campaigning.[9]

In July 2006, Poland joined Lithuania, Estonia, and Latvia to build a new nuclear power plant in Lithuania to replace the Ignalina Nuclear Power Plant being shut down due to pressure from the EU. Poland would invest 22% with these other countries into the project, the Visaginas NPP main site would have been under principal construction by early 2016 with necessary prerequisite planning, financing, regulatory agency approval and logistical ground work in terms of infrastructure modernization and expansion finished and in place by 2015. The plant commercial operations scheduled to begin by 31 December 2022.[10] The total costs of the project was to be EUR 6 billion. Poland was guaranteed to have 1,200 MWe from the power plant and has upgraded transmission capacity between Lithuania and Poland.[8] After the nuclear project was abandoned, Lithuania instead became an importer of electricity from Poland.

In a public opinion poll, 60% of the population supported construction of a nuclear power plant in Poland to reduce its dependence on foreign sources of energy. Additionally, 48% supported construction of a nuclear power plant in their neighborhood, citing local benefits that include lower energy costs.[8]

The popular Baltic Sea resort Mielno was one of three sites selected, however in February 2012, residents voted overwhelmingly against the plan. Some 94 percent of the 2,389 people who took part in a referendum opposed the plant and only 5 percent supported it.[11]

In 2014, under the government of Prime Minister Donald Tusk, Poland's Nuclear Power Program was adopted.[12][13] Through the early 2020s the Polish Nuclear Power Program was managed by the group EJ1 of the state-owned utility PGE Polska Grupa Energetyczna.

2020 to current

[edit]

Growing environmental, climate change, and economic concerns among the Polish public, policymakers, and businesses continues to drive Polish interest in nuclear power in the 2020s. The most significant efforts are those of the state-owned nuclear development company Polskie Elektrownie Jądrowe regarding large light water reactors in the 1,000 MWe to 1,250 MWe range and those of private industrial companies pursuing small modular reactors for deployment at industrial sites.

In 2021 Polish Prime Minister Mateusz Morawiecki, jointly with prime ministers of Hungary, France, Czech Republic, Romania, Slovak Republic and Slovenia, signed an open letter to European Commission calling for recognition of role of nuclear power as the only non-intermittent low-carbon energy source currently available at industrial scale in Europe.[14]

In April 2021 Polish Academy of Sciences (PAN) published a comprehensive report on perspectives of decarbonization of energy sector, calling for increased use of "any low-carbon energy sources", including renewable energy and nuclear power.[15] Minister of energy Michał Kurtyka declared it's not realistic to look at low-carbon energy sector without nuclear power.[16]

A November 2021 poll indicated 74% in favor of building nuclear power plants in Poland in general, 58% supporting their location in their neighborhood and 39% opposing the latter. 82% believe nuclear power plants contribute to energy resilience of the country.[17]

A proposal has been also raised to retrofit thermal plants in Poland by replacing their coal boilers with SMRs, while preserving their existing generation and distribution infrastructure, which would reduce upfront capital costs by 28-35% and avoid emissions of 200 billion tons of CO2.[18]

In September 2023, Polskie Elektrownie Jądrowe formally signed an outline agreement with Westinghouse and Bechtel for the construction of Poland's first commercial nuclear power plant. The total investment into the plant, which will produce up to 3750 MWe and is estimated to be completed by 2032 or 2033, will amount to around 100 billion PLN.[19] In 2024, Jan Chadam (acting head of Polskie Elektrownie Jadrowe,) said the actual costs would be around 150 billion PLN (EUR 34.64 bln), so more than 10 bln EUR per GW.[20]

In June 2024, following the election of a new government led by Donald Tusk, Polska Grupa Energetyczna stated it will decide whether to make the investment in nuclear within the next few years.[21]

2020s PEJ large light water reactors proposals

[edit]

In the late 2010s and early 2020s, a special purpose entity of Poland's largest energy group PGE Polska Grupa Energetyczna known as EJ1 led the siting and development efforts for large light water reactors in Poland. In 2021, the functions of PGE EJ1 were transferred to a new state-owned entity, Polskie Elektrownie Jądrowe (PEJ), which was charged with developing 6 to 9 GWe of proven, large-scale, Generation III(+) pressurized water reactors[22] such as the AP1000,[23] APR-1400,[24][25] and EPR.[26][27] It is 100% owned by the State Treasury.[28]

PEJ is conducting siting studies and planning for construction and operation of six 1-1.5 GWe reactors starting from 2026 with the planned completion of first reactor by 2033 and all of them connected to the grid by 2040 with total nameplate capacity of 6-9 GWe.[29] The siting investigation conducted by PGE and PEJ included screening 92 potential locations before detailed studies were conducted two final candidate sites. Two sites in Pomorskie – Żarnowiec and Lubiatowo-Kopalino – were subject to more detailed scrutiny and the results published in the Environmental Impact Assessment (EIA) Report submitted to the General Director for Environmental Protection on March 29, 2022. The EIA considered multiple reactors generating up to 3,750 MWe at the site.[22]

On December 22, 2021, PEJ announced the preferred location for Poland's first commercial nuclear power plant as the Baltic Sea coastal commune of Choczewo in Wejherowo County, Pomeranian Voivodeship at a site called Lubiatowo-Kopalino.[30]

In October 2022, Poland announced that it had selected Westinghouse to build the first three-unit plant, with construction to start in 2026 and commissioning of the first reactor scheduled for 2033. A formal decision on a second three units is to be taken at a later date.[1][31]

2020s commercial large pressurized water reactors proposals

[edit]

In October 2022, Polish utilities PGE and ZE PAK announced an agreement with Korea Hydro & Nuclear Power to explore building a number of APR-1400 reactors near ZE PAK's coal-fired plant at Pątnów.[32] This development effort is led by private industry and is separate from (and in addition to) the government-led effort with PEJ.

2020s industrial small modular reactors proposals

[edit]

Private chemical industry producer Synthos (owned by Michał Sołowow) plans deployment of a GE Hitachi BWRX-300 SMR in its plant in Oświęcim.[29] In August 2021 Synthos has been joined by ZE PAK coal power station (owned by Zygmunt Solorz), with both planning construction of six 300 MW reactors.[33]

In 2022 KGHM, one of Poland's largest consumers of electricity, declared that shifting from coal to nuclear power is the only way for European industries to grow and remain competitive. KGHM signed a contract to initiate work towards deploying VOYGR SMR units with NuScale.[34][35]

In 2023 KGHM and joint venture Orlen Synthos Green Energy were granted the government permit under General Opinions on their chosen reactor technologies.[36]

See also

[edit]

References

[edit]
  1. ^ a b "Poland picks U.S. offer for its first nuclear power plant, prime minister says". Reuters. 29 October 2022.
  2. ^ "Polski reaktor jądrowy działa od lat. I to tuż pod Warszawą [KOMENTARZ]". Energetyka24. 4 January 2019. Retrieved 10 February 2021.
  3. ^ "Udział węgla w energetyce spadł do 63% - WysokieNapiecie.pl". wysokienapiecie.pl (in Polish). 2024-01-03. Archived from the original on 2024-02-25. Retrieved 2024-02-25.
  4. ^ "Poland - Energy Sector". www.trade.gov. Retrieved 2023-12-21.
  5. ^ "Strona główna - National Atomic Energy Agency - Gov.pl website". National Atomic Energy Agency. Retrieved 2023-12-21.
  6. ^ "List of Member States". www.iaea.org. 2016-06-08. Retrieved 2023-12-21.
  7. ^ Narodowej, Instytut Pamięci. "41. rocznica podjęcia przez rząd PRL uchwały w sprawie budowy Elektrowni Jądrowej Żarnowiec". Instytut Pamięci Narodowej (in Polish). Archived from the original on 2023-01-19. Retrieved 2024-02-25.
  8. ^ a b c "Emerging Nuclear Energy Countries". World Nuclear Association. April 2009. Retrieved 2009-04-22.
  9. ^ Stanislaw Latek (Spring 2005). "National Atomic Energy Agency: Nuclear News from Poland". Euronuclear. Archived from the original on 2012-07-16. Retrieved 2011-03-16.
  10. ^ "Visaginas Nuclear Power Plant – still high-risk investment | Centre for Eastern Studies". www.osw.waw.pl. Archived from the original on 27 August 2012. Retrieved 6 June 2022.
  11. ^ Maciej Onoszko (Feb 13, 2012). "Polish sea resort poll rejects nuclear plant". Reuters.
  12. ^ Ptak, Alicja (2022-11-28). "Polish government plans commission to investigate if Russia influenced energy policies of Tusk administration". Notes From Poland. Retrieved 2023-12-21.
  13. ^ "Program polskiej energetyki jądrowej - Polski Atom - Portal Gov.pl". Polski Atom (in Polish). Retrieved 2023-12-21.
  14. ^ "Joint letter from the Czech Republic, French Republic, Hungary, Republic of Poland, Romania, Slovak Republic and Republic of Slovenia on the role of nuclear power in the EU climate and energy policy". 2021-03-19.
  15. ^ "Komunikat 03/2021 interdyscyplinarnego Zespołu doradczego do spraw kryzysu klimatycznego przy prezesie PAN na temat perspektyw dekarbonizacji wytwarzania energii elektrycznej w Polsce" (PDF).
  16. ^ "Poland / Energy Transition Not Possible Without Nuclear, Says Climate Minister". The Independent Global Nuclear News Agency. Retrieved 2021-04-21.
  17. ^ "74% Polaków popiera budowę elektrowni jądrowych w Polsce - Ministerstwo Klimatu i Środowiska - Portal Gov.pl". Ministerstwo Klimatu i Środowiska (in Polish). Retrieved 2021-12-15.
  18. ^ Qvist, Staffan; Gładysz, Paweł; Bartela, Łukasz; Sowiżdżał, Anna (January 2021). "Retrofit Decarbonization of Coal Power Plants—A Case Study for Poland". Energies. 14 (1): 120. doi:10.3390/en14010120.
  19. ^ Kielak, Eryk; Kolibabski, Kacper (2023-09-27). "Koniec czekania. Polska będzie miała elektrownię jądrową. Atomowy kontrakt podpisany". gazeta.pl (in Polish). Retrieved 2023-11-15.
  20. ^ "Poland's first nuclear plant to cost approx. PLN 150 bln". biznes.pap.pl (in Polish). Retrieved 2024-04-19.
  21. ^ "Uncertainty over Polish nuclear plans". Nuclear Engineering International. 26 June 2024. Retrieved 8 July 2024.
  22. ^ a b "Announcement of the preferred site for the first NPP new build in Poland". nucleareurope. 2022-04-12. Retrieved 2023-12-21.
  23. ^ "USTDA Advances Poland's Civil Nuclear Energy Program by Funding U.S. Industry-Led Study – USTDA". Retrieved 2023-12-21.
  24. ^ Wilczek, Maria (2021-11-04). "South Korea joins Poland's nuclear race with offer of six reactors". Notes From Poland. Retrieved 2023-12-21.
  25. ^ "Korea offers six reactors to Poland : New Nuclear - World Nuclear News". www.world-nuclear-news.org. Retrieved 2023-12-21.
  26. ^ "France makes nuclear offer to Poland : New Nuclear - World Nuclear News". www.world-nuclear-news.org. Retrieved 2023-12-21.
  27. ^ "About the Company". ppej.pl. Retrieved 2023-12-21.
  28. ^ https://ppej.pl/en/news/news "New company name: Polskie Elektrownie Jądrowe sp. z o.o." July 7, 2021
  29. ^ a b Wilczek, Maria (2020-06-16). "Construction of Poland's first nuclear power plant to begin in 2026". Notes From Poland. Retrieved 2021-03-22.
  30. ^ "News". ppej.pl. Retrieved 2023-12-21.
  31. ^ Tilles, Daniel (2022-10-28). "Poland picks US as partner for first nuclear power plant". Notes From Poland. Retrieved 2023-12-21.
  32. ^ Lee, Heesu (31 October 2022). "Poland Signs Deal With Korea to Build Second Nuclear Plant". Bloomberg.
  33. ^ "Two Billionaires Join Forces in Poland's Nuclear Energy Push". Bloomberg.com. 31 August 2021. Retrieved 2021-09-01.
  34. ^ "Going Green Must Include Nuclear for EU's Largest Copper Plant". Bloomberg.com. 24 January 2022. Retrieved 2022-01-25.
  35. ^ "Decision-in-principle for Polish SMR power plant". World Nuclear News. 13 July 2023. Retrieved 14 November 2023.
  36. ^ "Jest zielone światło dla małego atomu". wnp.pl (in Polish). Retrieved 2023-12-07.
[edit]