Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
Columbia
Part of Shuttle
Shuttle cutaway
Shuttle cutaway showing deployment of LDEF
Credit: NASA
American manned spaceplane. Columbia, the first orbiter in the Shuttle fleet, was named after the sloop that accomplished the first American circumnavigation of the globe.
AKA: OV-102. Status: Operational 1981. First Launch: 1981-04-12. Last Launch: 2003-01-16. Number: 28 . Payload: 21,190 kg (46,710 lb). Thrust: 53.37 kN (11,997 lbf). Gross mass: 115,900 kg (255,500 lb). Unfuelled mass: 103,488 kg (228,151 lb). Specific impulse: 316 s. Height: 37.24 m (122.17 ft). Span: 23.79 m (78.05 ft).
The command module for Apollo 11, the first lunar landing mission, also bore the name. Following 26 missions Columbia underwent a major overhaul beginning in late 1999. The updated Columbia first flew in 2002 on the STS-109 mission to update and repair the Hubble telescope. The second mission, STS-107 in January 2003, concluded with the loss of the spacecraft and its crew during re-entry.
Columbia, after several years of delays, became the first Space Shuttle to fly into Earth orbit in 1981. It soldiered on alone for two years and five flights before being joined by Challenger in 1983 (destroyed four years later during launch). Orbiters Discovery (1984) and Atlantis (1985) followed. It had originally been planned that the test vehicle Enterprise, used for suborbital approach and landing tests, would be refurbished and fly into orbit, but this was found not to be economical. Shuttle Endeavour was built as a replacement for Challenger and first flew in 1992.
Columbia was the first on-line orbiter to undergo the scheduled inspection and retrofit program. It was transported August 10, 1991, after completion of mission STS-40, to prime Shuttle contractor Rockwell International's Palmdale, California assembly plant. The oldest orbiter in the fleet underwent approximately 50 modifications, including the addition of carbon brakes, drag chute, improved nose wheel steering, removal of development flight instrumentation and an enhancement of its thermal protection system. The orbiter returned to KSC February 9, 1992 to begin processing for mission STS-50 in June of that year.
Columbia underwent its OMDP-1 overhaul at Palmdale between 8 October 1994 and 14 April 1995. The airframe was completely inspected for corrosion, in particular the wing leading edge spar, which seemed to have a recurring problem after sustained exposure of the orbiter on the pad in the long run-up to the first shuttle launch. 469 x-ray and 19 visual borescope inspections were conducted of the orbiter's structure. A total of 80 new and 143 pending changes were made to the spacecraft, but no major changes.
With the advent of the International Space Station program, it was decided that Columbia was too heavy for efficient operations to the 51.6 degree inclination ISS orbit. Instead it was refurbished in September 1999-2002 at the factory under OMDP-2 as a vehicle planned to be dedicated to solo shuttle operations in low-inclination orbits (Spacelab/Spacehab flights, heavy scientific payload launch, Hubble space telescope servicing missions). Columbia became the second orbiter to received the updated 'glass cockpit' electronic crew displays. Unlike the other orbiters, it retained most of its unique original thermal protection scheme. The updated Columbia first flew in 2002 on the STS-109 mission to update and repair the Hubble telescope. The second mission, STS-107 in January 2003, concluded with the loss of the spacecraft and its crew during re-entry. Ironically, in the aftermath of the tragedy, NASA decided to cancel all further shuttle missions that could not use the ISS as a safe haven in the event of problems.
Crew Size: 8. Orbital Storage: 30 days. Habitable Volume: 71.50 m3. Structure: 32,950 kg (72,640 lb). Heat shield: 12,100 kg (26,600 lb). Reaction Control System: 2,800 kg (6,100 lb). Recovery Equipment: 4,200 kg (9,200 lb). Navigation Equipment: 2,000 kg (4,400 lb). Electrical Equipment: 7,000 kg (15,400 lb). Communications Systems: 700 kg (1,540 lb). Crew Seats and Provisions: 750 kg (1,650 lb). Miscellaneous Contingency: 2,400 kg (5,200 lb). Environmental Control System: 2,500 kg (5,500 lb). RCS Coarse No x Thrust: 38 x 387 N. RCS Fine No x Thrust: 6 x 107 N. RCS specific impulse: 289 sec. RCS total impulse: 9,355 kgf-sec. Spacecraft delta v: 700 m/s (2,290 ft/sec). Electric System: 6,000.00 kWh. Electric System: 14.00 average kW.
Family:
Spaceplane,
US Rocketplanes.
Country:
USA.
Engines:
OME.
Flights:
STS-1,
STS-2,
STS-3,
STS-4,
STS-5,
STS-9,
STS-61-C,
STS-28,
STS-32,
STS-35,
STS-40,
STS-50,
STS-52,
STS-55,
STS-58,
STS-62,
STS-65,
STS-73,
STS-75,
STS-78,
STS-80,
STS-83,
STS-94,
STS-87,
STS-90,
STS-93,
STS-109,
STS-107.
Launch Vehicles:
Space Shuttle.
Propellants:
N2O4/MMH.
Projects:
STS.
Launch Sites:
Edwards,
Cape Canaveral,
Cape Canaveral LC39A,
Cape Canaveral LC39B.
Agency:
NASA,
North American.
Bibliography:
15,
2,
276,
3133,
33,
44,
552,
554,
6,
66,
7,
8.
Photo Gallery
| Shuttle Orbiter Shuttle Orbiter 2 view Credit: © Mark Wade |
| Shuttle Landing Credit: NASA |
| Shuttle cutaway Shuttle cutaway showing deployment of LDEF Credit: NASA |
| STS-1 Detailed drawing of STS-1 Columbia Credit: NASA |
| STS-1 STS 1 Shuttle Columbia firing main engines Credit: NASA |
| STS-1 Launch view of the Columbia for the STS-1 mission, April 12, 1981 Credit: NASA |
| STS-1 Launch view of the Columbia for the STS-1 mission, April 12, 1981 Credit: NASA |
| STS-1 Launch view of the Columbia for the STS-1 mission, April 12, 1981 Credit: NASA |
| STS-1 Space Shuttle orbiter Columbia on approach for landing Edwards Air Force Base Credit: NASA |
| STS-1 Aerial ground views of the Columbia sitting on the Lakebed Runway Credit: NASA |
| STS-2 Space shuttle Columbia being lowered down toward the solid rocket boosters Credit: NASA |
| STS-2 Space Shuttle Columbia OV (101) launching from pad 39A beginning STS-2 Credit: NASA |
| STS-2 View of the Columbia's open payload bay and the Canadian RMS Credit: NASA |
| STS-2 Views of STS-2 Columbia landing at Edwards Air Force Base, California Credit: NASA |
| STS-3 Night firing of orbiter Columbia's thrusters Credit: NASA |
| STS-3 View of the Columbia's aft section while over Morocco's Atlantic Coast Credit: NASA |
| STS-4 View of the Columbia's RMS arm and end effector grasping IECM Credit: NASA |
| STS-9 Launch of STS-9 Space Shuttle Columbia Credit: NASA |
| STS-9 View of the Spacelab module in the payload bay of the Columbia during STS-9 Credit: NASA |
| STS-9 Post landing view of the Columbia on runway with deservicing vehicles & crew Credit: NASA |
| STS-61-C Piece of thermal insulation tile floats near the Shuttle Columbia Credit: NASA |
| STS-61-C The SATCOM Ku-1 communications satellite deployed from Columbia Credit: NASA |
| STS-61-C Night landing of Shuttle Columbia at Edwards AFB and end of STS 61-C mission Credit: NASA |
| STS-28 STS-28 Columbia, OV-102, Pilot Richards adjusts LES before bailout exercises Credit: NASA |
| STS-28 STS-28 Columbia, OV-102, lifts off from KSC Launch Complex (LC) Pad 39B Credit: NASA |
| STS-28 STS-28 Columbia, OV-102, Pilot Richards at forward flight deck pilots station Credit: NASA |
| STS-28 STS-28 Columbia, OV-102, MS Brown juggles food containers on middeck Credit: NASA |
| STS-28 STS-28 Columbia, OV-102, MS Brown uses ARRIFLEX camera on aft flight deck Credit: NASA |
| STS-28 STS-28 Columbia, OV-102, landing at Edwards Air Force Base (EAFB) California Credit: NASA |
| STS-28 STS-28 MS Adamson inspects Columbia's, OV-102's, thermal protection system Credit: NASA |
| STS-32 Air-to-air view of STS-32 Columbia, OV-102, lift-off and SRB separation Credit: NASA |
1969 September 11 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Two major directions were identified for NASA manned space flight in the next decade. - .
Nation: USA.
Program: Skylab.
Flight: Skylab B.
Spacecraft: Columbia,
Skylab.
Two major directions were identified for manned space flight in the next decade. These were further exploration of the Moon, with possibly the establishment of a lunar surface base, and the continued development of manned flight in Earth orbit, leading to a permanent manned space station supported by a low-cost shuttle system. To maintain direction, the following key milestones were proposed: 1972 - AAP operations using a Saturn V launched Workshop 1973 - Start of post-Apollo lunar exploration 1974 - Start of suborbital flight tests of Earth to orbit shuttle - Launch of a second Saturn V Workshop 1975 - Initial space station operations - Orbital shuttle flights 1976 - Lunar orbit station - Full shuttle operations 1977 - Nuclear stage flight test 1978 - Nuclear shuttle operations-orbit to orbit 1979 - Space station in synchronous orbit By 1990 - Earth orbit space base - Lunar surface base - Possible Mars landing
1972 July 26 - .
- Contract awarded for shuttle OV-102. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1974 June 4 - .
- Structural assembly of crew module for OV-102 begun. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1975 March 27 - .
- Shuttle Columbia fuselage assembly starts. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Start long-lead fabrication aft fuselage, Columbia (OV-102).
1975 November 17 - .
- Columbia crew module started. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Start long-lead fabrication of crew module, Columbia (OV-102).
1976 December 13 - .
- Start assembly upper forward fuselage, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 January 3 - .
- Start assembly vertical stabilizer, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 February 10 - .
- Midfuselage on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 August 26 - .
- Deliver wings on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 September 7 - .
- Lower forward fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 October 28 - .
- Lower forward fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 November 4 - .
- Deliver aft fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1977 November 7 - .
- Start final assembly Columbia. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Start final assembly and closeout system installation, Palmdale, Columbia (OV-102).
1978 January 10 - .
- Vertical stabilizer on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 February 17 - .
- Crew module on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 February 24 - .
- Body flap on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 March 6 - .
- Upper forward fuselage on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 March 19 - .
- Aft payload bay doors on dock, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 April 23 - .
- Columbia ready for power-on. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Complete final assembly and closeout system installation, ready for power-on, Columbia (OV-102).
1978 April 24 - .
- Start precombined systems test, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 April 28 - .
- Forward payload bay doors on dock, Columbia. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Forward payload bay doors on dock, Palmdale, Columbia (OV-102).
1978 May 26 - .
- Complete forward RCS structure, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 May 26 - .
- Upper forward fuselage mate, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 July 7 - .
- Complete mate payload bay doors, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Complete mate forward and aft payload bay doors, Columbia (OV-102).
1978 August 11 - .
- Complete forward RCS, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 September 25 - .
- Start precombined system test, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1978 December 15 - .
- Complete precombined system test, Columbia. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 February 3 - .
- Complete combined systems test, Palmdale, Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 February 16 - .
- Airlock on dock, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 March 5 - .
- Complete postcheckout, Palmdale, Columbia (OV-102) - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
1979 March 8 - .
Launch Site:
Edwards.
Launch Complex:
Edwards.
- Columbia (OV-102) transported overland to Edwards. - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Columbia (OV-102) transported overland from Palmdale to Edwards (38 miles).
1979 March 9 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle carrier aircraft/Columbia test flight - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Shuttle carrier aircraft/Columbia (OV-102) test flight at NASA Edwards.
1979 March 20 - .
- Ferry flight, Edwards to El Paso - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Edwards to Biggs Army Air Base, El Paso, Texas (3 hours, 20 minutes).
1979 March 22 - .
- Ferry flight El Paso to Kelly AFB - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Biggs Army Air Base to Kelly AFB, San Antonio, Texas (1 hr, 39 min).
1979 March 23 - .
- Ferry flight, Kelly AFB to Eglin AFB, Fla - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Kelly AFB to Eglin AFB, Fla. (2 hours, 12 minutes).
1979 March 24 - .
- Ferry flight, Eglin AFB to KSC - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Eglin AFB to KSC (1 hour, 33 minutes).
1979 May 10 - .
- Deliver right-hand OMS/RCS for Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Deliver right-hand OMS/RCS from McDonnell Douglas, St. Louis, to KSC, Columbia (OV-102).
1979 May 15 - .
- Deliver left-hand OMS/RCS for Columbia - .
Nation: USA.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Deliver left-hand OMS/RCS from McDonnell Douglas to KSC, Columbia (OV-102).
1979 Late - .
- STS-2A (cancelled) - .
Crew: Haise,
Lousma.
Nation: USA.
Related Persons: Haise,
Lousma.
Program: STS.
Flight: STS-2A.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
In late 1977 shuttle orbital missions were due to start in 1979. STS-2, the second shuttle flight, was to have rendezvoused with the Skylab space station and released a small Skylab Reboost Module. This would dock to Skylab and boost the station to a higher orbit for later use. But the shuttle program also was hit with delays and before the first shuttle flew, Skylab burned up in the atmosphere and crashed into the Australian outback on July 11, 1979.
1981 April 12 - .
12:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-1 - .
Call Sign: Columbia. Crew: Crippen,
Young.
Payload: Columbia F01 / DFI. Mass: 4,909 kg (10,822 lb). Nation: USA.
Related Persons: Crippen,
Young.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-1.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 2.26 days. Decay Date: 1981-04-14 . USAF Sat Cat: 12399 . COSPAR: 1981-034A. Apogee: 251 km (155 mi). Perigee: 240 km (140 mi). Inclination: 40.30 deg. Period: 89.40 min. First flight of Space Transportation System (aka Space Shuttle).. Payloads: Development Flight Instrumentation and Aerodynamic Coefficient Identification Package..
1981 November 12 - .
15:10 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-2 - .
Call Sign: Columbia. Crew: Engle,
Truly.
Payload: Columbia F02 / DFI. Mass: 8,517 kg (18,776 lb). Nation: USA.
Related Persons: Engle,
Truly.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-2.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 2.26 days. Decay Date: 1981-11-14 . USAF Sat Cat: 12953 . COSPAR: 1981-111A. Apogee: 231 km (143 mi). Perigee: 222 km (137 mi). Inclination: 38.00 deg. Period: 89.00 min. Second shuttle test flight. Payloads: Office of Space and Terrestrial Applications (OSTA)-1 experiments, Orbiter Experiments (OEX)..
1982 March 22 - .
16:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-3 - .
Call Sign: Columbia. Crew: Fullerton,
Lousma.
Payload: Columbia F03 / OSS-1. Mass: 10,301 kg (22,709 lb). Nation: USA.
Related Persons: Fullerton,
Lousma.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-3.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 8.00 days. Decay Date: 1982-03-30 . USAF Sat Cat: 13106 . COSPAR: 1982-022A. Apogee: 249 km (154 mi). Perigee: 241 km (149 mi). Inclination: 38.00 deg. Period: 89.40 min. Manned two crew. Payloads: Office of Space Science (OSS) experiments, Monodisperse Latex Reactor (MLR), Electro-phoresis Verification Test (EEVT), Plant Lignification Experiment..
1982 June 27 - .
15:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-4 - .
Call Sign: Columbia. Crew: Hartsfield,
Mattingly.
Payload: Columbia F04 / DoD 82-1. Mass: 11,109 kg (24,491 lb). Nation: USA.
Related Persons: Hartsfield,
Mattingly.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-4.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 7.05 days. Decay Date: 1982-07-04 . USAF Sat Cat: 13300 . COSPAR: 1982-065A. Apogee: 302 km (187 mi). Perigee: 295 km (183 mi). Inclination: 28.50 deg. Period: 90.30 min.
Manned two crew. Fourth space shuttle test flight. Payloads: Induced Environment Contamination Monitor (IECM), Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES), Development Flight Instrumentation (DFl), Orbiter Experiments (OEX), first NASA getaway special (GAS), Night/Day Optical Survey of Lightning (NOSL) experiment, Vapor Phase Compression (VPC) freezer heat exchanger dynamics for freezing samples, Aerodynamic Coefficient Identification Package (AClP) experiment.
1982 November 11 - .
12:19 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-5 - .
Call Sign: Columbia. Crew: Allen,
Brand,
Lenoir,
Overmyer.
Payload: Columbia F05 / SBS 3 [PAM-D] / Anik C3 [PAM-D]. Mass: 14,551 kg (32,079 lb). Nation: USA.
Related Persons: Allen,
Brand,
Lenoir,
Overmyer.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-5.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 5.09 days. Decay Date: 1982-11-16 . USAF Sat Cat: 13650 . COSPAR: 1982-110A. Apogee: 317 km (196 mi). Perigee: 294 km (182 mi). Inclination: 28.50 deg. Period: 90.50 min.
Manned four crew. First mission to deploy commercial communications satellites (SBS 3, Anik C3). Payloads: : Satellite Business Systems (SBS)-C with Payload Assist ; (PAM)-D; Telesat-E (Canadian communications satellite) with PAM-D. Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES), three getaway specials (GAS), Student experiments, GLOW experiment, Vestibular experiment, Oxygen Interaction With Materials experiment.
1983 November 28 - .
16:00 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-9 - .
Call Sign: Columbia. Crew: Garriott,
Lichtenberg,
Merbold,
Parker,
Shaw,
Young.
Payload: Columbia F06 / Spacelab 1 Pallet. Mass: 15,088 kg (33,263 lb). Nation: USA.
Related Persons: Garriott,
Lichtenberg,
Merbold,
Parker,
Shaw,
Young.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-9.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 10.32 days. Decay Date: 1983-12-08 . USAF Sat Cat: 14523 . COSPAR: 1983-116A. Apogee: 254 km (157 mi). Perigee: 241 km (149 mi). Inclination: 57.00 deg. Period: 89.50 min.
Carried ESA Spacelab. Payloads: Payload: Spacelab-1 experiments, habitable Spacelab and pallet, carried 71 experiments. The six-man crew was divided into two 12-hour-day red and blue teams to operate experiments. First high-inclination orbit of 57 degrees.
1984-1986 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Columbia overhauled at Palmdale. - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
The ejection seats and flight instrumentation used for the first manned shuttle flights were removed. Head-up display and GPS avionics were installed. Orbiter 5.4 structural modifications were made; the disconnect valves, thermal protection system, and brakes were brought up to date. Provisions were made for use of the Manned Maneuvering Unit and 231 Master Change Requests were implemented.
1985 November 1 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-51-H (cancelled) - .
Payload: EOM-1. Nation: USA.
Program: STS.
Flight: STS-51-H.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned EOM-1/2 shuttle mission. Cancelled due to payload delays..
1986 January 12 - .
11:55 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-61-C - .
Call Sign: Columbia. Crew: Bolden,
Cenker,
Chang-Diaz,
Gibson,
Hawley,
Nelson,
Nelson, Bill.
Payload: Columbia F07 Satcom-K 1 [PAM-D2]. Mass: 14,724 kg (32,460 lb). Nation: USA.
Related Persons: Bolden,
Cenker,
Chang-Diaz,
Gibson,
Hawley,
Nelson,
Nelson, Bill.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-61-C.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 6.09 days. Decay Date: 1986-01-18 . USAF Sat Cat: 16481 . COSPAR: 1986-003A. Apogee: 338 km (210 mi). Perigee: 331 km (205 mi). Inclination: 28.50 deg. Period: 91.20 min.
Manned seven crew. Launched Satcom K1. Payloads: Deploy SATCOM (RCA-Satellite Communi-cations) Ku-1 with Payload Assist Module (PAM)-D II. Materials Science Laboratory, Comet Halley Active Monitoring Experiment (CHAMP), Hitchhiker (HH) Goddard (G)-1, thirteen getaway specials (GAS), student experiment, Initial Blood Storage Equipment (lBSE), Characterization of Space Motion Sickness (SMS).
1986 March - .
1986 June - .
1986 October - .
1987 January - .
- STS-71-A (cancelled) - .
Crew: Nordsieck.
Payload: Astro-2. Nation: USA.
Related Persons: Nordsieck.
Program: STS.
Flight: STS-71-A.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned Astro-2 shuttle mission. Cancelled after Challenger disaster. .
1987 February - .
- STS-71-D (cancelled) - .
Crew: Wood, Robert.
Backup Crew: Walker.
Payload: Communications satellites. Nation: USA.
Program: STS.
Flight: STS-71-D.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster. .
1987 August - .
- STS-71-M (cancelled) - .
Crew: Nordsieck.
Payload: Astro-3. Nation: USA.
Related Persons: Nordsieck.
Program: STS.
Flight: STS-71-M.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Planned Astro-3 shuttle mission. Cancelled after Challenger disaster. .
1989 August 8 - .
12:37 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-28 - .
Call Sign: Columbia. Crew: Adamson,
Brown, Mark,
Leestma,
Richards,
Shaw.
Payload: Columbia F08 / DoD. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Adamson,
Brown, Mark,
Leestma,
Richards,
Shaw.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-28.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 5.04 days. Decay Date: 1989-08-13 . USAF Sat Cat: 20164 . COSPAR: 1989-061A. Apogee: 306 km (190 mi). Perigee: 289 km (179 mi). Inclination: 57.00 deg. Period: 90.50 min.
Manned five crew. Deployed 2 classified satellites. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 287 kph. Touchdown miss distance: 1,618.00 m. Landing Rollout: 1,833.00 m. Payloads: DoD Mission.
1990 January 9 - .
12:35 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-32 - .
Call Sign: Columbia. Crew: Brandenstein,
Dunbar,
Ivins,
Low,
Wetherbee.
Payload: Columbia F09 / Syncom-4 5 [Orbus-7S]. Mass: 12,014 kg (26,486 lb). Nation: USA.
Related Persons: Brandenstein,
Dunbar,
Ivins,
Low,
Wetherbee.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-32.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 10.88 days. Decay Date: 1990-01-20 . USAF Sat Cat: 20409 . COSPAR: 1990-002A. Apogee: 361 km (224 mi). Perigee: 296 km (183 mi). Inclination: 28.50 deg. Period: 91.10 min.
Manned five crew. Deployed Leasat 5, retrieved LDEF. Night landing. Payloads: Deployment of Syncom IV-5, retrieval of Long Duration Exposure Facility (LDEF), Fluids Experiment Apparatus (FEA)-3, Protein Crystal Growth (PCG) III-2, Latitude/Longitude Locator (L3), American Flight Echocardiograph (AFE), Characterization of Neurospora Circadian Rhythms in Space (CNCR)-01, Air Force Maui Optical Site (AMOS)-4, Mesoscale Lightning Experiment (MLE), IMAX, Interim Operational Contamination Monitor (lOCM).
1990 December 2 - .
06:49 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-35 - .
Call Sign: Columbia. Crew: Brand,
Durrance,
Gardner, Guy,
Hoffman,
Lounge,
Parise,
Parker.
Payload: Columbia F10 / BBXRT. Mass: 11,943 kg (26,329 lb). Nation: USA.
Related Persons: Brand,
Durrance,
Gardner, Guy,
Hoffman,
Lounge,
Parise,
Parker.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-35.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 8.96 days. Decay Date: 1990-12-11 . USAF Sat Cat: 20980 . COSPAR: 1990-106A. Apogee: 362 km (224 mi). Perigee: 352 km (218 mi). Inclination: 28.50 deg. Period: 91.70 min. Manned seven crew. Carried ASTRO-1 observatory. Payloads: Ultraviolet Astronomy TeIescope (Astro), Broad-Band X-Ray Telescope (BBXRT), Shuttle Amateur Radio Experiment (SAREX), Air Force Maui Optical Site (AMOS)..
1991 June 5 - .
13:24 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-40 - .
Call Sign: Columbia. Crew: Bagian,
Gaffney,
Gutierrez,
Hughes-Fulford,
Jernigan,
O Connor,
Seddon.
Payload: Columbia F11 / GBA-2. Mass: 11,767 kg (25,941 lb). Nation: USA.
Related Persons: Bagian,
Gaffney,
Gutierrez,
Hughes-Fulford,
Jernigan,
O Connor,
Seddon.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-40.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 9.09 days. Decay Date: 1991-06-14 . USAF Sat Cat: 21399 . COSPAR: 1991-040A. Apogee: 296 km (183 mi). Perigee: 287 km (178 mi). Inclination: 39.00 deg. Period: 90.40 min.
Carried Spacelab life sciences module. Payloads: Spacelab Life Sciences (SLS)-1 with long module, getaway special bridge assembly with 12 getaway specials, Physiological Monitoring System (PMS), Urine Monitoring System (UMS), Animal Enclosure Modules (AEM), Middeck Zero-gravity Dynamics Experiment (MODE), 7 Orbiter Experiments Program experiments.
1991 August 10 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Columbia overhauled at Palmdale - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
The orbiter returned to service on 9 February 1992. 62 modifications were made, including replacement of the nose cap; removal of the SEADS and SUMS experiment packages; new Auxiliary Power Units installed; carbon brakes and a drag chute installed; Orbiter 6.0 structural modifications made; AP-101S General Purpose Computers replaced the older AP-101P's; and the Thermal Protection System was reworked.
1992 June 25 - .
16:12 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-50 - .
Call Sign: Columbia. Crew: Baker,
Bowersox,
DeLucas,
Dunbar,
Meade,
Richards,
Trinh.
Payload: Columbia F12 / USML-1 / OAST. Mass: 11,153 kg (24,588 lb). Nation: USA.
Related Persons: Baker,
Bowersox,
DeLucas,
Dunbar,
Meade,
Richards,
Trinh.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-50.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 13.81 days. Decay Date: 1992-07-09 . USAF Sat Cat: 22000 . COSPAR: 1992-034A. Apogee: 309 km (192 mi). Perigee: 302 km (187 mi). Inclination: 28.50 deg. Period: 90.60 min.
Carried United States Microgravity Laboratory. First extended-duration mission. Payloads: United States Microgravity Laboratory (USML)-1; Orbital Acceleration Research Experiment (OARE); Investigations Into Polymer Membrane Processing (IPMP), Shuttle Amateur Radio Experiment (SAREX)-ll; Ultraviolet Plume Instrument (UVPl) .
1992 October 22 - .
17:09 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-52 - .
Call Sign: Columbia. Crew: Baker, Mike,
Jernigan,
MacLean,
Shepherd,
Veach,
Wetherbee.
Payload: Columbia F13 / Lageos 2 [Iris] / CTA. Mass: 9,106 kg (20,075 lb). Nation: USA.
Related Persons: Baker, Mike,
Jernigan,
MacLean,
Shepherd,
Veach,
Wetherbee.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-52.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 9.87 days. Decay Date: 1992-11-01 . USAF Sat Cat: 22194 . COSPAR: 1992-070A. Apogee: 307 km (190 mi). Perigee: 304 km (188 mi). Inclination: 28.50 deg. Period: 90.60 min.
Deployed Lageos 2, CTA. Payloads: Laser Geodynamic Satellite (LAGEOS) II/ Italian Research Interim Stage (IRIS), Canadian Experiments (CANEX) 2, United States Micro-gravity Payload (USMP) 1, Attitude Sensor Pack-age (ASP), Tank Pressure Control Experiment (TPCE), Physiological Systems Experiment (PSE), Heat Pipe Performance (HPP) experiment, Commercial Protein Crystal Growth (CPCG), Shuttle Plume Impingement Experiment (SPIE), Commercial Materials ITA Experiment (CMIX), Crystals by Vapor Transport Experiment (CVTE).
1992 November 8 - .
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Columbia OMDP-1 - .
Nation: USA.
Program: STS.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Shuttle Columbia begins its OMDP-1 Orbiter Maintenance Down Period at the Palmdale, returning to service in 1995 for the STS-73 mission. These are undertaken every 10 to 12 shuttle missions. Modifications made included a complete mid-life refurbishment, corrosion control on the wing leading edge spar, and implementation of 96 Master Change Requests.
1993 March 22 - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- Shuttle Columbia Pad Abort - .
Nation: USA.
Program: STS.
Flight: STS-55.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
The countdown for Columbia's launch was halted by on-board computers at T-3
seconds following a problem with purge pressure readings in the oxidizer preburner on
main engine #2 Columbia's three main engines were replaced on the launch pad, and
the flight was rescheduled behind Discovery's launch on STS-56. Columbia finally
launched on April 26, 1993.
1993 April 26 - .
14:50 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-55 - .
Call Sign: Columbia. Crew: Harris,
Henricks,
Nagel,
Precourt,
Ross,
Schlegel,
Walter.
Payload: Columbia F14/USS/Spacelab D-2 LM. Mass: 12,185 kg (26,863 lb). Nation: USA.
Related Persons: Harris,
Henricks,
Nagel,
Precourt,
Ross,
Schlegel,
Walter.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-55.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 9.99 days. Decay Date: 1993-05-06 . USAF Sat Cat: 22640 . COSPAR: 1993-027A. Apogee: 312 km (193 mi). Perigee: 304 km (188 mi). Inclination: 28.50 deg. Period: 90.70 min. Manned seven crew. Carried German Spacelab-D2. Payloads: Spacelab D-2 with long module, unique support structure (USS), and Reaction Kinetics in Glass Melts (RKGM) getaway special, Shuttle Amateur Radio Experiment (SAREX) II..
1993 October 18 - .
14:53 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-58 - .
Call Sign: Columbia. Crew: Blaha,
Fettman,
Lucid,
McArthur,
Searfoss,
Seddon,
Wolf.
Payload: Columbia F15 / EDO. Mass: 10,517 kg (23,186 lb). Nation: USA.
Related Persons: Blaha,
Fettman,
Lucid,
McArthur,
Searfoss,
Seddon,
Wolf.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-58.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 14.01 days. Decay Date: 1993-11-01 . USAF Sat Cat: 22869 . COSPAR: 1993-065A. Apogee: 294 km (182 mi). Perigee: 284 km (176 mi). Inclination: 39.00 deg. Period: 90.30 min. Biological, microgravity experiments aboard Spacelab 2. Payloads: Spacelab Life Sciences (SLS) 2, Shuttle Amateur Radio Experiment (SAREX) II..
1994 March 4 - .
13:53 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-62 - .
Call Sign: Columbia. Crew: Allen, Andy,
Casper,
Gemar,
Ivins,
Thuot.
Payload: Columbia F16 / USMP-2 / OAST-2. Mass: 8,870 kg (19,550 lb). Nation: USA.
Related Persons: Allen, Andy,
Casper,
Gemar,
Ivins,
Thuot.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-62.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 13.97 days. Decay Date: 1994-03-31 . USAF Sat Cat: 23025 . COSPAR: 1994-015A. Apogee: 309 km (192 mi). Perigee: 246 km (152 mi). Inclination: 39.00 deg. Period: 90.40 min.
Carried USMP-2, OAST-2, SAMPIE, TES, EISG. Payloads: United States Microgravity Payload (USMP) 2, Office of Aeronautics and Space Technology (OAST) 2, Dexterous End Effector (DEE), Shuttle Solar Backscatter Ultraviolet/A (SSBUV/A), Limited-Duration Space Environment Candidate Material Exposure (LDCE), Advanced Protein Crystal Growth (APCG), Physiological Systems Experiment (PSE), Commercial Protein Crystal Growth (CPCG), Commercial Generic Bioprocessing Apparatus (CGBA), Auroral Photography Experiment Phase B (APE-B), Middeck Zero-Gravity Dynamics Experiment (MODE), Air Force Maui Optical Site (AMOS) Calibration Test, Bioreactor Demonstration System A.
1994 July 8 - .
16:43 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-65 - .
Call Sign: Columbia. Crew: Cabana,
Chiao,
Halsell,
Hieb,
Mukai,
Thomas,
Walz.
Backup Crew: Favier.
Payload: Columbia F17 / EDO. Mass: 10,811 kg (23,834 lb). Nation: USA.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-65.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 14.75 days. Decay Date: 1994-07-23 . USAF Sat Cat: 23173 . COSPAR: 1994-039A. Apogee: 249 km (154 mi). Perigee: 239 km (148 mi). Inclination: 28.50 deg. Period: 89.40 min.
Carried IML-2; microgravity, biology experiments. Payloads: International Microgravity Laboratory (IML) 2, Orbital Acceleration Research Experiment (OARE), Commercial Protein Crystal Growth (CPCG), Air Force Maui Optical Site (AMOS), Military Applications of Ship Tracks (MAST), Shuttle Amateur Radio Experiment (SAREX).
1995 October 20 - .
13:53 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-73 - .
Call Sign: Columbia. Crew: Bowersox,
Coleman, Catherine,
Leslie,
Lopez-Alegria,
Rominger,
Sacco,
Thornton.
Payload: Columbia F18 / Spacelab LM / EDO. Mass: 15,250 kg (33,620 lb). Nation: USA.
Related Persons: Bowersox,
Coleman, Catherine,
Leslie,
Lopez-Alegria,
Rominger,
Sacco,
Thornton.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-73.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 15.91 days. Decay Date: 1995-11-05 . USAF Sat Cat: 23688 . COSPAR: 1995-056A. Apogee: 241 km (149 mi). Perigee: 241 km (149 mi). Inclination: 39.00 deg. Period: 89.70 min. Carried USML-2 for microgravity experiments (attached to Columbia). Payloads: United States Microgravity Laboratory (USML) 2, Orbital Acceleration Research Experiment (OARE)..
1996 February 22 - .
20:18 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-75 - .
Call Sign: Columbia. Crew: Allen, Andy,
Chang-Diaz,
Cheli,
Guidoni,
Hoffman,
Horowitz,
Nicollier.
Payload: Columbia F19 / USMP-3 Aft. Mass: 10,592 kg (23,351 lb). Nation: USA.
Related Persons: Allen, Andy,
Chang-Diaz,
Cheli,
Guidoni,
Hoffman,
Horowitz,
Nicollier.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-75.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 15.74 days. Decay Date: 1996-03-09 . USAF Sat Cat: 23801 . COSPAR: 1996-012A. Apogee: 320 km (190 mi). Perigee: 277 km (172 mi). Inclination: 28.50 deg. Period: 90.50 min.
Carried TSS-1R tether satellite; satellite tether broke during deployment, making TSS-1R an unintentional free flyer
Payloads: Tethered Satellite System (TSS) Reflight (1R); Orbital Acceleration Research Experiment (OARE) (part of United States Microgravity Payload 3); USMP-3; Commercial Protein Crystal Growth (CPCG) 09, Block IV; Middeck Glovebox Experiment (MGBX) (part of USMP-3). During the deployment of TSS, the tether broke and the satellite was lost.
1996 June 20 - .
14:49 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-78 - .
Call Sign: Columbia. Crew: Brady,
Favier,
Helms,
Henricks,
Kregel,
Linnehan,
Thirsk.
Payload: Columbia F20 / EDO. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Brady,
Favier,
Helms,
Henricks,
Kregel,
Linnehan,
Thirsk.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-78.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 16.91 days. Decay Date: 1996-07-07 . USAF Sat Cat: 23931 . COSPAR: 1996-036A. Apogee: 261 km (162 mi). Perigee: 246 km (152 mi). Inclination: 39.00 deg. Period: 89.60 min.
Columbia carried Terence T Henricks, Kevin R Kregel, Susan J Helms, Richard M Linnehan, Charles E Brady, Jr, Jean-Jacques Favier, and Robert Brent Thirsk to orbit. Main payload was the Life and Microgravity Spacelab for conducting human biological and microgravity experiments. Columbia landed safely at Kennedy Space Center on July 7.
1996 November 19 - .
19:55 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-80 - .
Call Sign: Columbia. Crew: Cockrell,
Jernigan,
Jones,
Musgrave,
Rominger.
Payload: Columbia F21 / Orfeus / WSF. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Cockrell,
Jernigan,
Jones,
Musgrave,
Rominger.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-80.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 17.66 days. Decay Date: 1996-12-07 . USAF Sat Cat: 24660 . COSPAR: 1996-065A. Apogee: 375 km (233 mi). Perigee: 318 km (197 mi). Inclination: 28.50 deg. Period: 91.50 min.
Mission STS-80 carried the Orfeus astronomy satellite, the Wake Shield Facility, and spacewalk equipment. The Orfeus satellite was deployed on November 20. It carried an
ultraviolet telescope and spectrographs. Wake Shield Facility was deployed on November 22 and retrieved on November 26 . On 1996 Nov 29, crewmembers Tamara Jernigan and Thomas Jones were to conduct the first of several planned EVAs. However the shuttle's exit hatch would not open and NASA cancelled this and the other planned spacewalks of the mission. On December 4 at the astronauts retrieved the Orfeus satellite using the RMS arm.
Reentry attempts on Dec 5 and Dec 6 were called off due to bad weather. Columbia finally landed at 11:49 GMT December 7 on Runway 33 at Kennedy Space Center, making STS-80 the longest shuttle mission to that date .
1997 April 4 - .
19:20 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP3.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-83 - .
Call Sign: Columbia. Crew: Crouch,
Gernhardt,
Halsell,
Kilrain,
Linteris,
Thomas,
Voss, Janice.
Backup Crew: Coleman, Catherine.
Payload: Columbia F22 / Spacelab LM Unit 1 / EDO. Mass: 115,900 kg (255,500 lb). Nation: USA.
Agency: NASA Houston.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-83.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 3.97 days. Decay Date: 1997-04-08 . USAF Sat Cat: 24755 . COSPAR: 1997-013A. Apogee: 302 km (187 mi). Perigee: 298 km (185 mi). Inclination: 28.50 deg. Period: 90.50 min.
The launch of STS-83, the first Microgravity Science Laboratory (MSL-1) mission, was postponed for a day to replace some insulation around a water coolant line in Columbia's payload bay. Liftoff was further delayed 20 minutes due to anomalous oxygen readings in the orbiter's payload bay. STS-83 was cut short due to a problem with one of the three fuel cells that provide electricity and water to Columbia (flight rules required that all three must be operating). At 14:30 GMT on April 6 the crew were ordered to begin a Minimum Duration Flight (MDF). On April 8 the OMS engines ignited at 17:30 GMT for the deorbit burn, and Columbia landed on Runway 33 at Kennedy Space Center at 18:33 GMT.
With delays in International Space Station construction leaving ample room in the shuttle schedule, NASA made the unique decision to leave the equipment installed in Columbia and refly this mission with the same crew later in 1997 as STS-94.
1997 July 1 - .
18:02 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-94 - .
Call Sign: Columbia. Crew: Crouch,
Gernhardt,
Halsell,
Kilrain,
Linteris,
Thomas,
Voss, Janice.
Payload: Columbia F23 / Spacelab LM Unit 1 / EDO. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Crouch,
Gernhardt,
Halsell,
Kilrain,
Linteris,
Thomas,
Voss, Janice.
Agency: NASA Houston.
Manufacturer: Bremen.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-94.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 15.70 days. Decay Date: 1997-07-17 . USAF Sat Cat: 24849 . COSPAR: 1997-032A. Apogee: 300 km (180 mi). Perigee: 296 km (183 mi). Inclination: 28.50 deg. Period: 90.50 min.
STS-94 was the reflight, with the same equipment and crew, of the curtailed STS-83 mission.
Cargo Bay Payloads:
- MSL-1: The Microgravity Science Laboratory included the first test of the International Space Station's EXPRESS Rack. MSL-1 also contained numerous other experiment payloads to test materials and combustion processes in zero gravity.
- CRYOFD: The Cryogenic Flexible Diode (CRYOFD) heat pipe was a Hitchhiker payload.
- OARE: The Orbital Acceleration Research Experiment was a self-calibrating instrument that monitored extremely small accelerations and vibrations experienced during orbit of the Shuttle.
In-Cabin Payloads: SAREX, MSX
The mission this time went for its full two week duration and the crew completed the full list of experiments. The deorbit burn was on July 17, 1997 at 09:44 GMT and Columbia landed on KSC's Runway 33 at 10:46:34 GMT.
1997 November 19 - .
19:46 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-87 - .
Call Sign: Columbia. Crew: Chawla,
Doi,
Kadenyuk,
Kregel,
Lindsey,
Scott, Winston.
Payload: Columbia F24 / Spartan / USMP-4 Aft. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Chawla,
Doi,
Kadenyuk,
Kregel,
Lindsey,
Scott, Winston.
Agency: NASA Houston.
Manufacturer: North American.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-87.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 15.69 days. Decay Date: 1997-12-05 . USAF Sat Cat: 25061 . COSPAR: 1997-073A. Apogee: 279 km (173 mi). Perigee: 273 km (169 mi). Inclination: 28.50 deg. Period: 90.00 min.
OV-102 Columbia was launched on a microgravity science mission. Spartan 201 was released a day late on November 21. However the satellite did not start its automatic orientation maneuver because the crew failed to send it the correct commands prior to release.
Spartan was recaptured by hand, during a spacewalk by Takao Doi and Winston Scott on November 25. Tests of space station tools went well, but the free-flying Sprint camera subsatellite was not deployed due to lack of time.
NASA decided not to redeploy Spartan on this mission. During an EVA on Dec 3, Doi and Scott carried out more tests of the Space Station crane. They also deployed the AERCam/Sprint 'football' remote-controlled camera for a free flight in the payload bay.
Columbia landed on December 5, with a deorbit burn at 11:21 GMT. Touchdown was at 12:20 GMT at Kennedy Space Center.
1997 November 25 - .
00:02 GMT - .
1997 December 3 - .
09:09 GMT - .
1998 April 17 - .
18:19 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP2.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-90 - .
Call Sign: Columbia. Crew: Altman,
Buckey,
Hire,
Linnehan,
Pawelczyk,
Searfoss,
Williams, Dave.
Backup Crew: Dunlap,
Mukai.
Payload: Columbia F25 / Spacelab LM Eurolab. Mass: 115,900 kg (255,500 lb). Nation: USA.
Agency: NASA Houston.
Manufacturer: Bremen.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-90.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 15.91 days. Decay Date: 1998-05-03 . USAF Sat Cat: 25297 . COSPAR: 1998-022A. Apogee: 274 km (170 mi). Perigee: 247 km (153 mi). Inclination: 39.00 deg. Period: 89.70 min.
Columbia rolled out to pad 39B on March 23. Payloads:
- Spacelab transfer tunnel
- Spacelab Long Module, with Neurolab experiments for the following life science studies:
- Chronic Recording of Otolith Nerves in Microgravity
- Development of the Aortic Baroreflex under Conditions of Microgravity
- Neural-Thyroid Interaction on Skeletal Isomyosin Expression in OG
- Spatial Orientation of the Vestibulo-Ocular Reflex and Velocity Storage
- Autonomic Neuroplasticity in Weightlessness
- Extended Duration Orbiter pallet
- Two Get Away Special beams with canisters G-197, G-467, G-772 (Colorado's COLLIDE experiment, which collided small particles into each other to simulate the formation of planets and rings).
The Neurolab mission was managed by NASA-Johnson at Houston, unlike earlier Spacelab flights which were NASA-Marshall/Huntsville's responsibility. Landed at Kennedy Space Center May 3 1998.
1999 July 23 - .
04:31 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39B.
Launch Platform: MLP1.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-93 - .
Call Sign: Columbia. Crew: Ashby,
Coleman, Catherine,
Collins, Eileen,
Hawley,
Tognini.
Payload: Columbia F26 / Chandra. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Ashby,
Coleman, Catherine,
Collins, Eileen,
Hawley,
Tognini.
Agency: NASA Houston.
Manufacturer: North American.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-93.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 4.95 days. Decay Date: 1999-07-28 . USAF Sat Cat: 25866 . COSPAR: 1999-040A. Apogee: 280 km (170 mi). Perigee: 260 km (160 mi). Inclination: 28.50 deg. Period: 89.90 min.
STS-93 was first rolled out to pad 39B on June 7 1999. The Chandra/IUS-27 vehicle was placed in the payload canister on June 19. The first launch attempt was on July 20, but controllers aborted the launch at T-6 seconds, just before main engine ignition, due to a data spike in hydrogen pressure data. This was determined to be due to a faulty sensor and a second attempt was on July 22. A lightning storm prevented launch during the 46 minute window, and the launch was again scrubbed. Finally the vehicle lifted off the pad on July 23, but five seconds after launch a short in an electrical bus brought down two of the three main engine controllers. Backup controllers took over, but a further failure on the backup controller bus would have resulted in engine shutdown and the first ever attempt at an RTLS (Return To Launch Site) abort. To further complicate matters engine 3 (SSME 2019) had a hydrogen leak throughout the ascent, causing the engine to run hot. Controllers sweated as temperatures neared redline. The hot engine's controller compensated as programmed by using additional liquid oxygen propellant. The final result was that the shuttle ran out of gas - main engine cut-off (MECO) was at 04:39 GMT, putting Columbia into a 78 km x 276 km x 28.5 degree transfer orbit. Columbia was 1,700 kg short of oxygen propellant and 5 meters/sec slower than planned. The OMS-2 engine burn at 05:12 GMT circularised the orbit 10 km lower than planned.
The orbiter payload bay contained only the Chandra spacecraft, the IUS, and the IUS tilt tableTthe following payloads were carried in the shuttle's cabin: STL-B (Space Tissue Loss), CCM (Cell culture module), SAREX-II (Shuttle Amateur Radio Experiment), EarthKam, PGIM (Plant Growth Investigations in Microgravity), CGBA (Commercial Generic Bioprocessing Apparatus), MEMS (Micro-electric Mechanical System), and BRIC (Biological Research in Canisters) and SWUIS (the Southwest Ultraviolet Imaging System, an 0.18-m UV telescope to be used for airglow and planetary observations); GOSAMR (the Gelation of Sols: Applied Microgravity Research experiment) and LFSAH, the Lightweight Flexible Solar Array Hinge. MSX and SIMPLEX experiments were also to be carried out.
Chandra/IUS-27 was deployed from Columbia at 11:47 GMT July 23. Flight duration was limited; this was the heaviest shuttle (122,534 kg) and heaviest payload (19,736 kg) to that date. Columbia landed at 03:20 GMT on July 28 on runway 33 at Kennedy Space Center. Post-flight inspection found the presence of holes in the cooling lines on the nozzle of SSME 2019 (engine 3) which caused a hydrogen leak. A loose repair pin in the engine broke free and caused the failure. The cause of the short was found to be chaffed wiring inside the shuttle. The entire fleet was grounded for inspection and replacement of wiring as necessary.
2002 March 1 - .
11:22 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-109 - .
Call Sign: Columbia. Crew: Altman,
Carey,
Currie,
Grunsfeld,
Linnehan,
Massimino,
Newman.
Payload: Columbia F27. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Altman,
Carey,
Currie,
Grunsfeld,
Linnehan,
Massimino,
Newman.
Agency: NASA.
Manufacturer: Boeing.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-109.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 10.92 days. Decay Date: 2002-03-12 . USAF Sat Cat: 27388 . COSPAR: 2002-010A. Apogee: 578 km (359 mi). Perigee: 486 km (301 mi). Inclination: 28.50 deg. Period: 95.30 min.
Hubble Servicing Mission 3B. STS-109 main engine cutoff came at 1130 UTC with Columbia in a 55 x 574 km x 28.5 deg transfer orbit. The OMS-2 burn at about 1207 UTC raised perigee to about 195 km. There was a problem with a freon cooling loop on the Orbiter, but it wasn't quite bad enough to affect the mission. The Hubble Space Telescope closed its aperture door on March 2 in preparation for the rendezvous. Columbia got within 100m of HST by 0852 UTC on March 3 and grappled it with the RMS at 0931 UTC. HST was berthed on the FSS in Columbia's payload bay by 1032 UTC.
In the course of five spacewalks, the crew installed new equipment on HST. This was the first flight of Columbia since the launch of Chandra in 1999 following refurbishment. In the first two spacewalks, two new solar arrays were installed, and the two old arrays stowed on the RAC carrier. The RWA-1R reaction wheel assembly on the MULE carrier replaced the faltering RWA-1 in the telescope. The third spacewalk was the most difficult, as HST was entirely powered down while astronauts replaced its power controller unit, not designed for on-orbit replacement. On the fourth spacewalk the astronauts removed the European FOC camera, aboard HST since launch in 1990, and replaced it with the new ACS (Advanced Camera for Surveys). They also installed the CASH wire harness, part of the aft shroud cooling system. On the final spacewalk, the astronauts installed the NCS (NICMOS cooling system) cryocooler in the aft shround and the associated NCS radiator on the telescope's exterior. The NICMOS infrared camera had been idle since its original thermal control system failed. With the removal of FOC, the COSTAR device (which deployed contact lenses for the original instruments) became obsolete, since the newer instruments made the corrections to the incorrect HST mirror internally. Cargo manifest:
- Middeck:4 EMU spacesuits - 480 kg
- Bay 4: RAC (Rigid Array Carrier) - 2393 kg. The RAC carried the two folded SA-III rigid solar arrays which replaced the SA-II roll-up arrays. It calso carried the DBA2 diode box assembly which controlled the arrays, and a wire harness and containers associated with the NICMOS cooling system.
- Bay 7-8: SAC (Second Axial Carrier) - 2517 kg. The SAC was a specially designed pallet that flew on the first two Hubble SM flights, STS-61 and STS-82. On this flight it carried the ACS camera up (and the FOS camera down) as well as the NCS cryocooler, the PCU-R power controller, the CASH wire harness, and the thermal covers used in the PCU replacement.
- Bay 11: FSS (Flight Support System) - 2111 kg. The FSS first flew on STS 41-C (the Solar Max Repair) and was reused for each of the HST SM flights. It carried the BAPS Berthing and Positioning System, which was the docking ring for HST. Stowed on the FSS were a support post for BAPS and a cover for the HST low gain antenna.
- Bay 12: MULE (Multi-Use Lightweight Equipment Carrier) - 1409 kg. The MULE carried the NCS radiator, the NCS electronics support module, and the RWA-1R reaction wheel unit. MULE first flew on STS-48 carrying the UARS satellite, and then on STS-95 carrying the HOST payload which tested out the NCS.
- Sill: RMS arm No 201 - 410 kg
2002 March 6 - .
08:28 GMT - .
- EVA STS-109-3 - .
Crew: Grunsfeld,
Linnehan.
EVA Duration: 0.29 days. Nation: USA.
Related Persons: Grunsfeld,
Linnehan.
Program: ISS.
Flight: STS-109.
Spacecraft: Columbia,
HST.
Depress was at 0825 UTC and repress at 1516 UTC. The HST was powered entirely down and astronauts changed out the power control unit..
2002 March 9 - .
- HST redeployed - .
Nation: USA.
Spacecraft: Columbia,
HST.
HST was deployed from Columbia at 1004 UTC on into a 578 x 584 km x 28.5 deg orbit..
2003 January 16 - .
15:39 GMT - .
Launch Site:
Cape Canaveral.
Launch Complex:
Cape Canaveral LC39A.
LV Family:
Shuttle.
Launch Vehicle:
Space Shuttle.
- STS-107 - .
Call Sign: Columbia. Crew: Anderson,
Brown, David,
Chawla,
Clark,
Husband,
McCool,
Ramon.
Payload: Columbia F28 / Spacehab. Mass: 115,900 kg (255,500 lb). Nation: USA.
Related Persons: Anderson,
Brown, David,
Chawla,
Clark,
Husband,
McCool,
Ramon.
Agency: NASA.
Manufacturer: Boeing.
Program: STS.
Class: Manned.
Type: Manned spaceplane. Flight: STS-107.
Spacecraft Bus: Shuttle.
Spacecraft: Columbia.
Duration: 15.94 days. Decay Date: 2003-02-01 . USAF Sat Cat: 27647 . COSPAR: 2003-003A. Apogee: 276 km (171 mi). Perigee: 263 km (163 mi). Inclination: 39.00 deg. Period: 89.90 min. The last solo shuttle earth orbit mission ended in tragedy when the shuttle Columbia disintegrated during re-entry at an altitude of 63.15 km and a speed of Mach 18. Launch delayed from May 23, June 27, July 11 and 19, November 29, 2002..
2004 April 15 - .
- STS-122 (cancelled) - .
Nation: USA.
Agency: NASA.
Program: ISS.
Flight: STS-122 ISS EO-16.
Spacecraft: Columbia,
HST.
Flight delayed after the Columbia disaster. Columbia would have flown Hubble Space Telescope Servicing Mission 4. No crew had been named at the time of the loss of Columbia..
August 2005 - .
- STS-128 (cancelled) - .
Nation: USA.
Agency: NASA.
Program: ISS.
Flight: STS-128A.
Spacecraft: Columbia,
HST.
Flight delayed after the Columbia disaster. No crew had been named at the time of the loss of Columbia. Columbia would have flown Hubble Space Telescope Servicing Flight 5..
Back to top of page
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9
A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z
© 1997-2019 Mark Wade - Contact
© / Conditions for Use